NEW

SPADINA CRES W ROAD CLOSED AT POWER RD
(Cathodic protection)
Start: October 20, 7:00 a.m. End: October 23, 5:00 p.m.

BROADWAY AVE SB CURB LANE CLOSED FROM 3RD ST E TO 2ND ST E
(Water main inspections)
Start: October 20, 8:00 a.m. End: October 20, 12:00 p.m.

MCORMOND DR SB MEDIAN LANE CLOSED AT POHORECKY CRT
(Water main and road work)
Start: October 20, 8:00 a.m. End: October 20, 4:00 p.m.

CONFEDERATION DR NB LANES CLOSED FROM BENNETT PL TO CONFEDERATION CRES
(Hydrant replacement)
2-way traffic maintained in SB lanes
Start: October 20, 8:00 a.m. End: October 21, 5:00 p.m.

IDYLWYLD DR N NB & WB CURB LANES CLOSED AT 22ND ST E
(Cable fault repair)
Start: October 20, 9:00 a.m. End: October 20, 3:00 p.m.

8TH ST E EB CURB LANE CLOSED FROM PRESTON AVE S TO CAMPBELL AVE
(Sewer lining)
Start: October 20, 9:00 a.m. End: October 20, 3:00 p.m.

IDYLWYLD DR S NB CURB LANE CLOSED FROM HILLIARD ST W TO ISABELLA ST W
(Streetlight pole replacements)
Start: October 20, 9:30 a.m. End: October 20, 12:30 p.m.

IDYLWYLD DR N NB CURB LANE CLOSED FROM 7TH ST E TO 9TH ST E
(Light pole replacement)
Start: October 20, 12:30 p.m. End: October 20, 3:30 p.m.

ONGOING

1ST AVE N SB CURB & MEDIAN LANE CLOSED FROM 25TH ST E TO 24TH ST E
(Emergency building repair)
Start: October 6, 8:00 a.m. End: October 20, 5:00 p.m.

CUMBERLAND AVE S SB LANES CLOSED AT 1ST ST E
(Water main inspection)
2-way traffic maintained in the NB lanes.
Start: October 19, 7:30 a.m. End: October 23, 5:00 p.m.

TAYLOR ST E EB MEDIAN LANE CLOSED FROM ARLINGTON AVE TO CIRCLE DR E
(Water main inspections)
Start: October 19, 9:00 a.m. End: October 23, 7:30 p.m.

8TH ST E ROAD CLOSED FROM RANGE ROAD 3044 TO MCORMOND DR
(Trucking route)
Start: February 24, 7:00 a.m. End: October 26, 5:00 p.m.

SPADINA CRES W NB LANES CLOSED FROM DUDLEY ST TO 11TH ST W
(Water main construction)
Traffic yields to SB traffic
Start: September 23, 8:00 a.m. End: October 30, 4:00 p.m.

FEDORUK DR WB LANES CLOSED FROM KONIHOWSKI RD TO CENTRAL AVE
(Roadway twinning)
Start: September 30, 8:00 a.m. End: October 30, 5:00 p.m.

1ST AVE N NB MEDIAN LANE CLOSED; SB MEDIAN & LEFT TURN LANE CLOSED FROM 22ND ST E TO 23RD ST E
(Water main inspection)
Start: October 1, 8:00 a.m. End: October 31, 5:00 p.m.

SPADINA CRES W ROAD CLOSED FROM SCHUYLER ST TO POWER RD
(Construction)
Start: September 14, 7:00 a.m. End: November 2, 5:00 p.m.

MCORMOND DR NB CURB LANE CLOSED FROM STENSRUD RD TO BALTZAN BLVD
(Water main work)
Start: September 23, 8:00 a.m. End: November 3, 5:00 p.m.

All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.