Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map, find traffic detour information on our saskatoon.ca homepage or subscribe to our Traffic Detour Service Alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.

                       
 
 


Road Detour in Effect: SPEED RESTRICTIONS – Circle Dr WB approaching Lorne Ave exit, Nov27, 9am-12pm
Traffic Direction: Westbound
Start Date and Time: 27/11/2014 9:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 27/11/2014 12:00 PM
Location affected: Circle Drive westbound approaching Lorne Avenue exit speed reduced to 60 km/h while crews repair a crash cushion.
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – 19th St closed between Ave B & Ave C, Nov 27, 6am-9pm
Traffic Direction: Eastbound, Westbound
Start Date and Time: 27/11/2014 6:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 27/11/2014 9:00 PM
Location affected: 19th Street closed between Avenue B and Avenue C for concrete pour.
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – 2nd Ave & 26th St intersection closed, Nov26, 9am-12pm
Traffic Direction: Eastbound, Westbound, Southbound, Northbound
Start Date and Time: 26/11/2014 9:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 26/11/2014 6:00 PM
Location affected: No left turns from 2nd Avenue to 26th Street. No left turns or through traffic for 26th Street eastbound and westbound
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: LANE RESTRICTIONS – 51st St EB & WB curb& center lanes closed approaching Warman Rd, Nov26,9am-12pm
Traffic Direction: Eastbound, Westbound
Start Date and Time: 26/11/2014 9:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 26/11/2014 12:00 PM
Location affected: 51st Street eastbound and westbound curb (outside) and center lanes closed approaching Warman Road for sign and jersey barrier installation.
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Temperance St closed between 16th St & Albert Ave, Nov26, 7.30am-6pm
Traffic Direction: Eastbound, Westbound
Start Date and Time: 26/11/2014 7:30 AM
Traffic information: Please obey all signage
Expected End Date and Time: 26/11/2014 6:00 PM
Location affected: Temperance Street closed between 16th Street and Albert Avenue for water and sewer connection replacement
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTION - Egbert Ave closed from 104th St to 102nd St, Nov 25, 7am-5pm
Traffic Direction: Southbound, Northbound
Start Date and Time: 25/11/2014 7:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 25/11/2014 5:00 PM
Location affected: Egbert Avenue closed from 104th Street to 102nd Street for water main lining
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: LANE RESTRICITONS–Broadway Ave NB curb&parking lane closed from 10th St to 11th St,Nov25,6am-7.30am
Traffic Direction: Northbound
Start Date and Time: 25/11/2014 6:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 25/11/2014 7:30 AM
Location affected: Broadway Avenue northbound curb (outside) and parking lane closed from 10th Street to 11th Street for crane lift
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: Snow clean-up adjustment - McKercher b/wn College and Taylor, windrows will be moved to centre road
Start Date and Time: 23/11/2014 9:00 AM
Expected End Date and Time: 23/11/2014 5:00 PM
Location affected: McKercher Drive between College and Taylor
For more information: Contact Public Works at 306-975-2476



Road Detour in Effect: ROAD RESTRICTIONS - 8th St EB closed from Clarence Ave to McKinnon Ave, Nov 23, 7am-6pm
Traffic Direction: Eastbound
Start Date and Time: 23/11/2014 7:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 23/11/2014 6:00 PM
Location affected: 8th Street eastbound closed from Clarence Avenue to McKinnon Avenue for water connection repair
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – College Dr EB curb&center lane closed from Wiggins Ave to Bottomley Ave, Nov22
Traffic Direction: Eastbound
Start Date and Time: 22/11/2014 1:00 PM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 22/11/2014 5:00 PM
Location affected: College Drive eastbound curb and center lane closed from Wiggins Avenue to Bottomley Avenue for tree pruning
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS-College Dr EBmedian lane closed from University Dr to Cumberland Ave,Nov22,8.30am
Traffic Direction: Eastbound
Start Date and Time: 22/11/2014 8:30 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 22/11/2014 1:00 PM
Location affected: College Drive eastbound median (inside) lane closed from University Drive to Cumberland Avenue for tree pruning
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS - Broadway Ave NB closed from 10th St to Saskatchewan Cres, Nov22, 7.30am-10am
Traffic Direction: Northbound
Start Date and Time: 22/11/2014 7:30 AM
Traffic information: Please obey all signage
Expected End Date and Time: 22/11/2014 10:00 AM
Location affected: Broadway Avenue northbound closed from 10th Street to Saskatchewan Crescent for Gingerbread Run
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS - Millar Ave NB curb lane closed between Circle Dr & 43rd St, Nov21, 9am-6pm
Traffic Direction: Northbound
Start Date and Time: 21/11/2014 9:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 21/11/2014 6:00 PM
Location affected: Millar Avenue northbound curb (outside) lane closed between Circle Drive and 43rd Street for waterline disconnect
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Main St EB closed between Broadway Ave & Dufferin Ave, Nov 21, 9am-9.30am
Traffic Direction: Eastbound
Start Date and Time: 21/11/2014 9:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 21/11/2014 9:30 AM
Location affected: Main Street eastbound closed between Broadway Avenue and Dufferin Avenue for sculpture removal
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Queen St EB closed between 4th Ave & 5th Ave, Nov 20, 9am-3.30pm
Traffic Direction: Eastbound
Start Date and Time: 20/11/2014 9:00 AM
Traffic information: Two-way traffic set in WB lanes.
Expected End Date and Time: 20/11/2014 3:30 PM
Location affected: Queen Street eastbound closed between 4th Avenue and 5th Avenue to accommodate building construction. 4th Avenue closed approaching Queen Street.
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS - Ave N closed between 20th St & 18th St, Nov 20, 8am-4pm
Traffic Direction: Southbound, Northbound
Start Date and Time: 20/11/2014 8:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 20/11/2014 4:00 PM
Location affected: Ave N closed between 20th Street and 18th Street for rail track repairs
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – 2nd Ave NB closed between 26th St & Queen St, Nov 20, 8am-2pm
Traffic Direction: Northbound
Start Date and Time: 20/11/2014 8:00 AM
Traffic information: Two-way traffic set in southbound lanes.
Expected End Date and Time: 20/11/2014 2:00 PM
Location affected: 2nd Avenue northbound closed between 26th Street and Queen Street for building construction
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Bottomley Ave closed from Olser St to Temperance St, Nov20, 7.30am-3pm
Traffic Direction: Southbound, Northbound
Start Date and Time: 20/11/2014 7:30 AM
Traffic information: Please obey all signage
Expected End Date and Time: 20/11/2014 3:00 PM
Location affected: Bottomley Avenue closed from Olser Street to Temperance Street for water and sewer connection
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Main St EB closed between Broadway Ave & Dufferin Ave, Nov 20, 7am-5pm
Traffic Direction: Eastbound
Start Date and Time: 20/11/2014 7:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 20/11/2014 5:00 PM
Location affected: Main Street eastbound closed between Broadway Avenue and Dufferin Avenue for crane lift.
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: LANE RESTRICTIONS - 1st Ave SB curb lane closed between 23rd St & 22nd St, Nov20, 6am-10am
Traffic Direction: Southbound
Start Date and Time: 20/11/2014 6:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 20/11/2014 10:00 AM
Location affected: 1st Avenue southbound curb (outside) lane closed between 23rd Street and 22nd Street for Movember Fundraising Event
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: SPEED RESTRICTIONS – Circle Dr WB approaching Lorne Ave exit, Nov27, 9am-12pm
Traffic Direction: Westbound
Start Date and Time: 27/11/2014 9:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 27/11/2014 12:00 PM
Location affected: Circle Drive westbound approaching Lorne Avenue exit speed reduced to 60 km/h while crews repair a crash cushion.
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – 19th St closed between Ave B & Ave C, Nov 27, 6am-9pm
Traffic Direction: Eastbound, Westbound
Start Date and Time: 27/11/2014 6:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 27/11/2014 9:00 PM
Location affected: 19th Street closed between Avenue B and Avenue C for concrete pour.
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – 2nd Ave & 26th St intersection closed, Nov26, 9am-12pm
Traffic Direction: Eastbound, Westbound, Southbound, Northbound
Start Date and Time: 26/11/2014 9:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 26/11/2014 6:00 PM
Location affected: No left turns from 2nd Avenue to 26th Street. No left turns or through traffic for 26th Street eastbound and westbound
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: LANE RESTRICTIONS – 51st St EB & WB curb& center lanes closed approaching Warman Rd, Nov26,9am-12pm
Traffic Direction: Eastbound, Westbound
Start Date and Time: 26/11/2014 9:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 26/11/2014 12:00 PM
Location affected: 51st Street eastbound and westbound curb (outside) and center lanes closed approaching Warman Road for sign and jersey barrier installation.
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Temperance St closed between 16th St & Albert Ave, Nov26, 7.30am-6pm
Traffic Direction: Eastbound, Westbound
Start Date and Time: 26/11/2014 7:30 AM
Traffic information: Please obey all signage
Expected End Date and Time: 26/11/2014 6:00 PM
Location affected: Temperance Street closed between 16th Street and Albert Avenue for water and sewer connection replacement
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTION - Egbert Ave closed from 104th St to 102nd St, Nov 25, 7am-5pm
Traffic Direction: Southbound, Northbound
Start Date and Time: 25/11/2014 7:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 25/11/2014 5:00 PM
Location affected: Egbert Avenue closed from 104th Street to 102nd Street for water main lining
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: LANE RESTRICITONS–Broadway Ave NB curb&parking lane closed from 10th St to 11th St,Nov25,6am-7.30am
Traffic Direction: Northbound
Start Date and Time: 25/11/2014 6:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 25/11/2014 7:30 AM
Location affected: Broadway Avenue northbound curb (outside) and parking lane closed from 10th Street to 11th Street for crane lift
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: Snow clean-up adjustment - McKercher b/wn College and Taylor, windrows will be moved to centre road
Start Date and Time: 23/11/2014 9:00 AM
Expected End Date and Time: 23/11/2014 5:00 PM
Location affected: McKercher Drive between College and Taylor
For more information: Contact Public Works at 306-975-2476



Road Detour in Effect: ROAD RESTRICTIONS - 8th St EB closed from Clarence Ave to McKinnon Ave, Nov 23, 7am-6pm
Traffic Direction: Eastbound
Start Date and Time: 23/11/2014 7:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 23/11/2014 6:00 PM
Location affected: 8th Street eastbound closed from Clarence Avenue to McKinnon Avenue for water connection repair
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – College Dr EB curb&center lane closed from Wiggins Ave to Bottomley Ave, Nov22
Traffic Direction: Eastbound
Start Date and Time: 22/11/2014 1:00 PM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 22/11/2014 5:00 PM
Location affected: College Drive eastbound curb and center lane closed from Wiggins Avenue to Bottomley Avenue for tree pruning
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS-College Dr EBmedian lane closed from University Dr to Cumberland Ave,Nov22,8.30am
Traffic Direction: Eastbound
Start Date and Time: 22/11/2014 8:30 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 22/11/2014 1:00 PM
Location affected: College Drive eastbound median (inside) lane closed from University Drive to Cumberland Avenue for tree pruning
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS - Broadway Ave NB closed from 10th St to Saskatchewan Cres, Nov22, 7.30am-10am
Traffic Direction: Northbound
Start Date and Time: 22/11/2014 7:30 AM
Traffic information: Please obey all signage
Expected End Date and Time: 22/11/2014 10:00 AM
Location affected: Broadway Avenue northbound closed from 10th Street to Saskatchewan Crescent for Gingerbread Run
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS - Millar Ave NB curb lane closed between Circle Dr & 43rd St, Nov21, 9am-6pm
Traffic Direction: Northbound
Start Date and Time: 21/11/2014 9:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 21/11/2014 6:00 PM
Location affected: Millar Avenue northbound curb (outside) lane closed between Circle Drive and 43rd Street for waterline disconnect
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Main St EB closed between Broadway Ave & Dufferin Ave, Nov 21, 9am-9.30am
Traffic Direction: Eastbound
Start Date and Time: 21/11/2014 9:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 21/11/2014 9:30 AM
Location affected: Main Street eastbound closed between Broadway Avenue and Dufferin Avenue for sculpture removal
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Queen St EB closed between 4th Ave & 5th Ave, Nov 20, 9am-3.30pm
Traffic Direction: Eastbound
Start Date and Time: 20/11/2014 9:00 AM
Traffic information: Two-way traffic set in WB lanes.
Expected End Date and Time: 20/11/2014 3:30 PM
Location affected: Queen Street eastbound closed between 4th Avenue and 5th Avenue to accommodate building construction. 4th Avenue closed approaching Queen Street.
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS - Ave N closed between 20th St & 18th St, Nov 20, 8am-4pm
Traffic Direction: Southbound, Northbound
Start Date and Time: 20/11/2014 8:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 20/11/2014 4:00 PM
Location affected: Ave N closed between 20th Street and 18th Street for rail track repairs
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – 2nd Ave NB closed between 26th St & Queen St, Nov 20, 8am-2pm
Traffic Direction: Northbound
Start Date and Time: 20/11/2014 8:00 AM
Traffic information: Two-way traffic set in southbound lanes.
Expected End Date and Time: 20/11/2014 2:00 PM
Location affected: 2nd Avenue northbound closed between 26th Street and Queen Street for building construction
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Bottomley Ave closed from Olser St to Temperance St, Nov20, 7.30am-3pm
Traffic Direction: Southbound, Northbound
Start Date and Time: 20/11/2014 7:30 AM
Traffic information: Please obey all signage
Expected End Date and Time: 20/11/2014 3:00 PM
Location affected: Bottomley Avenue closed from Olser Street to Temperance Street for water and sewer connection
Messages for the public: Know before you go! Find timely updates to roadway work with Traffic Detour Service Alerts at www.saskatoon.ca/go/alerts and connect with us on Twitter and Facebook.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: ROAD RESTRICTIONS – Main St EB closed between Broadway Ave & Dufferin Ave, Nov 20, 7am-5pm
Traffic Direction: Eastbound
Start Date and Time: 20/11/2014 7:00 AM
Traffic information: Please obey all signage
Expected End Date and Time: 20/11/2014 5:00 PM
Location affected: Main Street eastbound closed between Broadway Avenue and Dufferin Avenue for crane lift.
Messages for the public: Drivers are reminded to allow extra time when travelling through construction areas, watch for pedestrians, cyclists and work crews, and for everyone’s safety please follow all detours, signs and barriers.
For more information: Contact Infrastructure Services at 306-975-2454



Road Detour in Effect: LANE RESTRICTIONS - 1st Ave SB curb lane closed between 23rd St & 22nd St, Nov20, 6am-10am
Traffic Direction: Southbound
Start Date and Time: 20/11/2014 6:00 AM
Traffic information: Traffic will merge to one lane
Expected End Date and Time: 20/11/2014 10:00 AM
Location affected: 1st Avenue southbound curb (outside) lane closed between 23rd Street and 22nd Street for Movember Fundraising Event
Messages for the public: The roadway is expected to reopen as indicated, weather permitting and barring any unforseen circumstances. The City thanks everyone for their patience.
For more information: Contact Infrastructure Services at 306-975-2454




0

 ‭(Hidden)‬ Content Query Web Part

  • © Copyright 2012 City of Saskatoon
  • Contact Us
  • City of Saskatoon
  • 222 3rd Ave. North
  • Saskatoon, Saskatchewan
  • S7K 0J5