Daily Road Report - June 2, 2025
May 30, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
2ND AVE N SB LANES CLOSED FROM 25TH ST E TO 24TH ST E
(Service connection installation)
Start: June 2, 6:00 a.m. End: June 17, 5:00 p.m.
IDYLWYLD DR N WB MEDIAN LANE CLOSED FROM PACIFIC AVE TO IDYLWYLD DR N
(Junction box replacement)
Start: June 2, 7:00 a.m. End: June 2, 11:00 a.m.
MARQUIS DR W WB CURB & CENTRE LANE CLOSED FROM BILL HUNTER AVE TO HIGHWAY 16
(Ditch construction)
Start: June 2, 7:00 a.m. End: June 3, 5:00 p.m.
BROADWAY AVE INTERSECTION CLOSED AT 12TH ST E
(Link station construction)
Start: June 2, 7:00 a.m. End: June 6, 5:00 p.m.
25TH ST E WB LANES CLOSED FROM ONTARIO AVE TO PACIFIC AVE
(Link station construction)
Start: June 2, 7:00 a.m. End: June 15, 4:30 p.m.
BERINI DR SB CURB LANE CLOSED FROM ATTRIDGE DR TO WEBSTER ST
(Construction)
Start: June 2, 7:00 a.m. End: July 1, 5:00 p.m.
33RD ST W WB MEDIAN LANE CLOSED AT AVE P N
(Sewer main lining)
Start: June 2, 9:00 a.m. End: June 2, 1:00 p.m.
AVE P N NB LANES CLOSED AT 33RD ST W
(Sewer main lining)
Start: June 2, 9:00 a.m. End: June 2, 1:00 p.m.
IDYLWYLD DR S NB CURB LANE CLOSED AT 8TH ST E
(Minor bridge maintenance)
Start: June 2, 9:00 a.m. End: June 2, 3:00 p.m.
MCORMOND DR SB LANES CLOSED FROM BRIGHTON CIRCLE TO TASKAMANWA ST
(Roadway paving)
Start: June 2, 10:00 a.m. End: June 2, 4:00 p.m.
CUMBERLAND AVE S SB LANES CLOSED FROM MAIN ST TO 8TH ST E
(Equipment offloading)
Start: June 2, 10:00 a.m. End: June 2, 5:00 p.m.
ONGOING
BROADWAY AVE ROAD CLOSED FROM 12TH ST E TO SASKATCHEWAN CRES E
(Link station construction)
Start: May 27, 7:00 a.m. End: June 2, 6:00 p.m.
MEADOWS PKY SB CURB LANE CLOSED FROM TAYLOR ST E TO MEADOWS BLVD
(Concrete work)
Start: May 29, 7:00 a.m. End: June 3, 5:00 p.m.
22ND ST W EB LANES & WB MEDIAN LANE CLOSED FROM AVE I N TO AVE K N
(Water main maintenance)
Two-way traffic will be maintained in WB lanes
Start: May 26, 7:00 a.m. End: June 5, 6:00 p.m.
BROADWAY AVE SB LANES CLOSED FROM SASKATCHEWAN CRES E TO 12TH ST E
(Link platform construction)
Start: May 20, 7:00 a.m. End: June 6, 4:30 p.m.
CUMBERLAND AVE S SB LANES CLOSED FROM 5TH ST E TO TAYLOR ST E
(Sidewalk replacements)
Two-way traffic will be maintained in NB lanes
Start: May 26, 7:00 a.m. End: June 7, 5:00 p.m.
BROADWAY AVE SB CURB & CENTER LANES CLOSED FROM 8TH ST E TO 9TH ST E
(Link station construction)
Start: May 26, 7:00 a.m. End: June 8, 4:30 p.m.
MCORMOND DR SB LANES CLOSED FROM NELSON RD TO ATTRIDGE DR
(Link station construction)
Start: May 26, 7:00 a.m. End: June 8, 5:00 p.m.
BOYCHUK DR SB CURB LANE CLOSED FROM 8TH ST E TO BRIARWOOD RD
(Sidewalk construction)
Start: May 16, 8:00 a.m. End: June 13, 5:00 p.m.
CIRCLE DR W SB SPEED REDUCTION FROM GLENWOOD AVE TO 33RD ST W
(Jersey barrier placement)
Start: April 28, 7:00 a.m. End: June 18, 4:00 p.m.
WARMAN RD SB RAMP CLOSED AT CIRCLE DR E
(Construction)
Start: May 12, 7:00 a.m. End: June 20, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
BROADWAY BRIDGE CLOSED FROM 12TH ST E TO 20TH ST E
(Bridge rehabilitation)
Start: May 11, 7:00 p.m. End: October (Date TBA)
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - May 31-June 1, 2025
May 30, 2025 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
8TH ST E EB & WB CURB LANES CLOSED AT WIGGINS AVE S
(Sanitary sewer lining)
Start: May 31, 10:00 a.m. End: May 31, 2:00 p.m.
BOYCHUK DR SB LANES CLOSED FROM CIRCLE DR E TO GLAZIER RD
(Streetlight pole replacements)
Flaggers will be present for traffic control
Start: June 1, 6:00 a.m. End: June 1, 8:00 a.m.
AVE H N INTERSECTION CLOSED AT 23RD ST W
(Roadway patching)
Start: June 1, 7:00 a.m. End: June 1, 3:00 p.m.
AVE H N ROAD CLOSED FROM 31ST ST W TO 32ND ST W
(Utility cut patching)
Start: June 1, 7:00 a.m. End: June 1, 3:00 p.m.
BOYCHUK DR NB MEDIAN LANE CLOSED FROM SLIMMON RD TO TAYLOR ST E
(Street light replacement)
Start: June 1, 8:00 a.m. End: June 1, 10:00 a.m.
KINGSMERE BLVD ROAD CLOSED FROM STILLWATER DR TO CHRISTOPHER CRES
(Catch basin maintenance)
Start: June 1, 8:00 a.m. End: June 1, 5:00 p.m.
CIRCLE DR E NB & SB MEDIAN LANES CLOSED FROM 108TH ST W TO ATTRIDGE DR
(Construction)
Start: June 1, 9:30 a.m. End: June 1, 11:00 a.m.
ONGOING
BROADWAY AVE ROAD CLOSED FROM 12TH ST E TO SASKATCHEWAN CRES E
(Link station construction)
Start: May 27, 7:00 a.m. End: June 2, 6:00 p.m.
MEADOWS PKY SB CURB LANE CLOSED FROM TAYLOR ST E TO MEADOWS BLVD
(Concrete work)
Start: May 29, 7:00 a.m. End: June 3, 5:00 p.m.
22ND ST W EB LANES & WB MEDIAN LANE CLOSED FROM AVE I N TO AVE K N
(Water main maintenance)
Two-way traffic will be maintained in WB lanes
Start: May 26, 7:00 a.m. End: June 5, 6:00 p.m.
BROADWAY AVE SB LANES CLOSED FROM SASKATCHEWAN CRES E TO 12TH ST E
(Link platform construction)
Start: May 20, 7:00 a.m. End: June 6, 4:30 p.m.
CUMBERLAND AVE S SB LANES CLOSED FROM 5TH ST E TO TAYLOR ST E
(Sidewalk replacements)
Two-way traffic will be maintained in NB lanes
Start: May 26, 7:00 a.m. End: June 7, 5:00 p.m.
BROADWAY AVE SB CURB & CENTER LANES CLOSED FROM 8TH ST E TO 9TH ST E
(Link station construction)
Start: May 26, 7:00 a.m. End: June 8, 4:30 p.m.
MCORMOND DR SB LANES CLOSED FROM NELSON RD TO ATTRIDGE DR
(Link station construction)
Start: May 26, 7:00 a.m. End: June 8, 5:00 p.m.
BOYCHUK DR SB CURB LANE CLOSED FROM 8TH ST E TO BRIARWOOD RD
(Sidewalk construction)
Start: May 16, 8:00 a.m. End: June 13, 5:00 p.m.
CIRCLE DR W SB SPEED REDUCTION FROM GLENWOOD AVE TO 33RD ST W
(Jersey barrier placement)
Start: April 28, 7:00 a.m. End: June 18, 4:00 p.m.
WARMAN RD SB RAMP CLOSED AT CIRCLE DR E
(Construction)
Start: May 12, 7:00 a.m. End: June 20, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
BROADWAY BRIDGE CLOSED FROM 12TH ST E TO 20TH ST E
(Bridge rehabilitation)
Start: May 11, 7:00 p.m. End: October (Date TBA)
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Broadway Avenue intersection closed at 12th Street starting Monday
May 30, 2025 - 11:30am
Broadway Avenue will be closed at 12th Street starting Monday, June 2, at 7:00 a.m. for Link station construction. Detours will be in place guiding motorists around the work zone. This project is expected to take five days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
109th Annual Decoration Day on Sunday, June 1, 2025
May 30, 2025 - 11:00am
The 109th Annual Decoration Day and Memorial Service will be celebrated at the Soldiers’ Cairn located at the Woodlawn Cemetery on Sunday, June 1, 2025. The annual event provides citizens with an opportunity to pay tribute to those brave individuals who lost their lives in the service of our country.
The day will begin with a parade at 1:45 p.m. that includes Legion members, ANAVET members, and members of the Armed Forces, starting from the Woodlawn Cemetery Office gate (north end of Memorial Avenue) and proceeding into the cemetery to the Memorial Cairn. Members of the public are welcome to join the parade. The service will start at 2:00 p.m.
Cankerworms Abundant in Saskatoon Again this Year
May 30, 2025 - 10:00am
Cankerworms and leafrollers are an annual issue for Saskatoon’s urban forest. The trees may experience heavy defoliation but, unless there are underlying issues, the trees will put out new leaves and recover.
Cankerworms, also known as loopers and inchworms, are found primarily on elm, but will also feed on other tree species. The fall and spring cankerworm species often feed together during June and July. The caterpillars can be found hanging from silken threads underneath infested trees and can be a nuisance.
Leafrollers often feed while concealed within leaves that are rolled or tied together with silk webbing. Leafrollers can be found on a wide variety of trees. The leaves will often remain rolled throughout the summer but leafrolling does not affect a tree’s health.
Tree banding can be used to deter cankerworms; however, it is not effective against leafrollers or other insects in the urban forest. The best time to place bands on trees is from September to May to help prevent the wingless adult female cankerworm moths from climbing host trees to lay their eggs. It is important to remove the bands at the beginning of June because the bands can collect moisture and cause the trunk to rot.
The City does not control cankerworms, or leafrollers as they typically do not impact the health of the trees they attack. Homeowners interested in controlling them on their own trees should contact a horticulture professional for advice. For additional information on insects and tree diseases, please visit saskatoon.ca/treepests.
Avenue H closed between 31st and 32nd streets on Sunday
May 30, 2025 - 7:00am
Avenue H will be closed between 31st and 32nd streets on Sunday, June 1, starting at 7:00 a.m. for utility cut patching. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Avenue H intersection closed at 23rd Street on Sunday
May 30, 2025 - 6:00am
Avenue H will be closed at 23rd Street on Sunday, June 1, starting at 7:00 a.m. for roadway patching. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Shared e-scooters are back for another season
May 29, 2025 - 4:06pm
Shared e-scooters are back for another season, providing Saskatoon residents and visitors with another way to get around the city.
The City of Saskatoon is pleased to announce that Bird and Neuron have been selected as the successful vendors to provide shared e-scooter service in Saskatoon from spring through early fall for the next five years. City Council approved the use of shared e-scooters in Saskatoon following a successful pilot program which ran in 2023 and 2024.
Shared e-scooters are available to ride today. To ride an e-scooter, start by downloading the Bird or Neuron apps on the Apple Store or on Google Play.
E-scooter users must follow Provincial regulations: e-scooters cannot be operated at a speed greater than 24 km/hr, minimum rider age of 16 years or older and riders are required to wear helmets.
Shared e-scooters must operate within the approved service area (found on the vendors app) on shared-use paths, pathways, cycle tracks, protected bike lanes and – where no such paths are available – may ride on streets with posted speed limits of 50 km/hr or lower. E-scooters are not permitted to ride on sidewalks.
Please ride responsibly to create a safe and enjoyable environment for all road and pathway users.
To learn more about e-scooters in Saskatoon, please visit this webpage.
About Bird and Neuron
Bird and Neuron are leading providers of shared e-scooters, operating in multiple cities across North America and Australia. Both companies provide affordable and sustainable transportation options to communities worldwide.
Update: University Bridge reopens following serious collision earlier today
May 29, 2025 - 3:07pm
A Saskatoon Police investigation on the University Bridge has concluded. The bridge has reopened. The City of Saskatoon thanks residents for their patience.
Original PSA:
University Bridge closed to traffic and pedestrians following serious collision
For immediate release: May 29, 2025
TC25-11102
The University Bridge is closed in both directions following a serious collision at around 7:30 this morning. The closure will stay in effect for an undetermined amount of time as Saskatoon Police investigate.
As a result, traffic volumes on other bridges into Downtown may be greater than usual. Drivers are advised to allow extra time to travel.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
-30-
Daily Road Report - May 30, 2025
May 29, 2025 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
11TH ST W ROAD CLOSED FROM FAIRLIGHT DR TO MCNAUGHTON AVE
(Infrastructure improvements)
Start: May 30, 7:00 a.m. End: May 30, 5:00 p.m.
ONGOING
11TH ST W WB MEDIAN LANE CLOSED AT AVE X S
(Environmental monitoring)
Start: May 29, 7:00 a.m. End: May 30, 4:30 p.m.
AVE W S NB & SB MEDIAN LANES CLOSED FROM DUDLEY ST TO 11TH ST W
(Environmental monitoring)
Start: May 29, 7:00 a.m. End: May 30, 4:30 p.m.
33RD ST E WB CURB LANE CLOSED FROM QUEBEC AVE TO ONTARIO AVE
(Link station construction)
Start: May 12, 7:00 a.m. End: May 30, 5:00 p.m.
AVE W S SB LANES CLOSED AT 11TH ST W
(Drilling)
Start: May 29, 7:00 a.m. End: May 30, 4:30 p.m.
BROADWAY AVE ROAD CLOSED FROM 12TH ST E TO SASKATCHEWAN CRES E
(Link station construction)
Start: May 27, 7:00 a.m. End: June 2, 6:00 p.m.
MEADOWS PKY SB CURB LANE CLOSED FROM TAYLOR ST E TO MEADOWS BLVD
(Concrete work)
Start: May 29, 7:00 a.m. End: June 3, 5:00 p.m.
22ND ST W EB LANES & WB MEDIAN LANE CLOSED FROM AVE I N TO AVE K N
(Water main maintenance)
Two-way traffic will be maintained in WB lanes
Start: May 26, 7:00 a.m. End: June 5, 6:00 p.m.
BROADWAY AVE SB LANES CLOSED FROM SASKATCHEWAN CRES E TO 12TH ST E
(Link platform construction)
Start: May 20, 7:00 a.m. End: June 6, 4:30 p.m.
CUMBERLAND AVE S SB LANES CLOSED FROM 5TH ST E TO TAYLOR ST E
(Sidewalk replacements)
Two-way traffic will be maintained in NB lanes
Start: May 26, 7:00 a.m. End: June 7, 5:00 p.m.
BROADWAY AVE SB CURB & CENTER LANES CLOSED FROM 8TH ST E TO 9TH ST E
(Link station construction)
Start: May 26, 7:00 a.m. End: June 8, 4:30 p.m.
MCORMOND DR SB LANES CLOSED FROM NELSON RD TO ATTRIDGE DR
(Link station construction)
Start: May 26, 7:00 a.m. End: June 8, 5:00 p.m.
BOYCHUK DR SB CURB LANE CLOSED FROM 8TH ST E TO BRIARWOOD RD
(Sidewalk construction)
Start: May 16, 8:00 a.m. End: June 13, 5:00 p.m.
CIRCLE DR W SB SPEED REDUCTION FROM GLENWOOD AVE TO 33RD ST W
(Jersey barrier placement)
Start: April 28, 7:00 a.m. End: June 18, 4:00 p.m.
WARMAN RD SB RAMP CLOSED AT CIRCLE DR E
(Construction)
Start: May 12, 7:00 a.m. End: June 20, 5:00 p.m.
BRIGHTON BLVD ROAD CLOSED FROM TASKAMANWA ST TO 8TH ST E
(Construction)
Start: November 20, 7:00 a.m. End: September 26, 2025, 5:00 p.m.
BROADWAY BRIDGE CLOSED FROM 12TH ST E TO 20TH ST E
(Bridge rehabilitation)
Start: May 11, 7:00 p.m. End: October (Date TBA)
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.