You are here

body
 

 COVID-19 Response for Saskatoon Residents

City Hall Lobby is open with a limited number of in-person services; the remainder of City Hall remains closed to the public. Learn more about the City’s response to COVID-19 and changes to programs and services.

Available Geotechnical Information

The City of Saskatoon is making available for your information a general study of parts of the east riverbank area conducted in 1985 by the Meewasin Valley Authority and the City of Saskatoon, as well as studies conducted for the City of Saskatoon in 2012 and 2013 for parts of the area between 11th Street East and Saskatchewan Crescent.

These reports are provided as a courtesy only.  There have been significant changes in ground water levels as well as actual slope failures in recent years; therefore, the information contained in all studies must be regarded with caution and with the assistance of external experts.  The City makes no representation that these reports reflect the current condition of the area.