Engage
How Can You Get Involved?
Thank you to everyone who participated in the engagement activities to let us know your thoughts and comments on the 22nd Street West & Confederation Drive Intersection Improvements project. This project was presented at the March 2025 Regular Business Meeting of City Council.
At this meeting, a functional plan that includes the following improvements was approved by City Council:
- 22nd Street West
- Construct an eastbound slotted left-turn lane and an exclusive eastbound right-turn lane at the intersection of 22nd Street West and Confederation Drive.
- Convert the existing right turn out access at Fairmont Drive to a right turn in access from 22nd Street West.
- Construct a new right turn out access to 22nd Street West from Fairlight Crescent.
- Relocate the existing overhead guide sign and roadside safety system located between Confederation Drive and Fairmont Drive farther west.
- Construct a third eastbound travel lane with curb and gutter between Diefenbaker Drive and Confederation Drive.
- Realign the pedestrian crosswalk, adjust pedestrian accessible ramps, and correct drainage deficiencies on the southwest corner of the intersection at 22nd Street West and Confederation Drive.
- Install a shared-use pathway on the south side of 22nd Street West between Diefenbaker Drive and Confederation Drive.
- Intersection of Fairmont Drive and Fairlight Drive
- Upgrade the traffic signal infrastructure to the latest standards.
- Add a curb extension in the southwest corner and remove the existing right turn channelization.
- Improve the pedestrian accessibility by:
- Realigning the west and south pedestrian crosswalks.
- Reconstructing the pedestrian accessible ramps on the northwest and southwest intersection corners.
- Addressing any drainage deficiencies in the pedestrian accessible ramps.
Contact Us
Comments and questions can also be provided by email, telephone, or mail using the contact information below.
Phone Number: | 306-975-2476 |
Email: | TransportationSurvey@Saskatoon.ca |
Mailing Address: | City of Saskatoon Attn: 22nd Street West & Confederation Drive Intersection Improvements Transportation Department 222 3rd Avenue North Saskatoon, SK S7K 0J5 |