Commercial Energy Loan Program
The Commercial Energy Loan Program (CELP) helps building owners invest in long‑term sustainability by providing affordable, fixed‑rate financing for upgrades that reduce energy use, lower operating costs, and improve climate resilience. Eligible applicants include commercial, institutional, non‑profit, multi‑unit residential, and affordable housing property owners.
CELP financing supports a wide range of improvements—from high‑efficiency heating and cooling systems to water‑saving fixtures, solar installations, and resilience measures that protect buildings from extreme weather. Repayments are made through municipal property taxes, with no penalties for early repayment.
Applications open Sunday, October 4, 2026.
Participation in the Commercial Energy Planner are the prerequired steps to accessing financing.
Why get a CEL Program loan?
A CEL Program loan provides a low-interest, long-term financing to help eligible property owners complete building improvements that reduce energy and water use, support renewable energy generation, improve climate resilience, or enable electric vehicle charging. It can help reduce upfront project costs while supporting long-term operational savings, improved tenant comfort, lower emissions, improved asset value, and strong building performance.
The CEL Program loan is attached to the property, not the individual or corporation and is deferred and repaid through property taxes. This means that if you sell the property before your loan is paid off, the loan may be transferred to a new owner, subject to program requirements and the terms negotiated between the buyer and seller. Alternatively, the outstanding balance may be repaid in full at any time without penalty.
Am I eligible?
| Applicant Eligibility | Property Eligibility |
|---|---|
| To apply for the Program you must: | Eligible properties must: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Eligible Retrofits
Project Category | Eligible Projects |
|---|---|
| Energy Efficiency |
|
| Water Efficiency |
|
| Renewable Energy |
|
| Climate Resiliency |
|
| Other eligible items |
|
What are the terms for a CEL Program loan?
The minimum loan to participate in the program is $10,000. The maximum loan amount for this program is $1.5 million per building. Financing cannot exceeed 20% of the property’s assessed value.
There is a one-time administration fee of $750 for loans up to $40,0000. Any amount above $40,000, an additional fee of 1.6% applies. For non-profit and affordable housing providers, the administrative fee is waived for loans below $40,000 and a reduced fee to 1% fee applied to any amount above $40,000.
You have four months from the date of your CEL Program application approval email to submit a complete Funding Request package and sign a Program Deferral Agreement with the City.
Term | 5 Years | 10 Years | 15 Years | 20 Years |
|---|---|---|---|---|
2026 Interest Rates | 3.24% | 4.03% | 4.68% | 4.83% |
How do I apply?
Before applying for the program, ensure that you and your building meet project and property eligibility requirements, read the CEL Program Guide, create a MyProperty account and gather the required initial application information.
The program process for CEL Program includes six main steps, guiding applicants from eligibility confirmation and project planning through installation, project completion, and loan repayment.
Application Process | ||
|---|---|---|
STEP 1 | APPLY | Confirm eligibility and submit your application through MyProperty. |
STEP 2 | DEVELOP PROJECT | Complete required planning steps, including Commercial Energy Planner participation, submit audits, or assessments, quotes & specifications, opening permits, and submit your funding request. |
STEP 3 | APPROVAL | Receive City approval, sign your Program Deferral Agreement, and wait for confirmation before your work begins. |
STEP 4 | INSTALL PROJECT | Request contractor payments and complete the approved upgrades. |
STEP 5 | COMPLETE PROJECT | Submit final invoices, completion documentation, photos, close permits and benchmarking information. |
STEP 6 | REPAY LOAN | Review final loan details and repay the final amount through property taxes. |
What is an Energy Audit and do I need one?
An energy audit helps you understand how your building uses energy and where improvements can reduce utility costs, improve comfort, and lower greenhouse gas emissions.
Energy and water efficiency projects require an ASHRAE Level II audit, equivalent virtual assessment, or another City-approved assessment with engineer attestation. For simpler projects, such as single-measure upgrades like LED lighting retrofits, or solar photovoltaic installations, the City may waive or modify the audit requirement. For Climate Resiliency projects, a Climate Resiliency Risk Assessment Form will need to be completed.
Level II Audits typically include:
- A description of the building, including major systems and typical use
- A review of recent utility bills to understand energy use and costs
- An inventory of major equipment such as heating, cooling, ventilation, lighting, controls, and domestic hot water systems
- Site observations, measurements, or short-term monitoring where needed
- Recommended energy and water conservation measures
- Suggested next steps for planning and completing upgrades
Audit costs can vary depending on building size, complexity, and available information. Participants should confirm scope and pricing directly with their selected energy professional. To learn more, check out the Commercial Energy Audits factsheet.
Contractor Resources
These resources support contractors participating in the Commercial Energy Loan Program (CELP). Here you’ll find guidance on how to register for the program’s pre‑vetted contractor list, information on how contractor payments are issued through CELP, and details on required permits and approvals for retrofit projects completed under the program.
Pre-vetted Contractor List eligibility and information
The pre-vetted contractor list is an optional list for property owners to choose a contractor from when they are participating in the CEL Program and HELP program.
If you would like to register for our pre-vetted contractor list you will need to gather your digital documentation. These are the requirements to be on the list:
- Proof of registered corporation in Saskatchewan
- Proof of Saskatchewan Workers' Compensation Board Compliance
- Proof of general liability insurance of at least $2M
- Proof of safety training
- Warranty information
- GST registration number
Email your digital documentation to the program coach at betterbuildings@saskatoon.ca and they will be in touch with the next steps!
Payment Information for Contractors
The City can make payments direct to the contractors on behalf of the property owners. These payments are sent by cheque unless the contractor is on the pre-vetted contractor list then they are eligible for EFT payments. There are 3 types of payments offered for Contractors.
Deposit payments - These payments can be paid before the work begins, up to 50% of the retrofit costs. Deposit payments must be requested by the property owner to be issued.
Installment payments - May be issued once one or more CELP‑approved retrofits are fully complete. If a project includes multiple retrofits, any retrofit finished early can be paid in full at that time. Payments are limited to up to 90% of the total project value until the property owner completes their entire project. All installment payments must be requested directly by the property owner before they can be issued.
- Final payments can be issued once the property owner has completed their entire project and uploaded all required documentation to MyProperty, including:
- Final contractor invoices and receipts
- Before‑and‑after photos
- Confirmation that all required permits are closed
- The completed Project Completion Certificate
After all documentation is received—and once any on‑site verification (if requested by the City) is completed—the City will issue any outstanding payments to contractors on behalf of the property owner. The property owner must submit all final invoices and request the final payment from the City before it can be processed.
Contractor payments for approved CELP projects follow the City’s standard net‑30 payment terms. To ensure accuracy and compliance, payments cannot be rushed or expedited. All invoices are reviewed and processed in the order they are received, and contractors will be notified if additional documentation is required to complete payment.
If you have any questions about payments, please reach out to the program coach at betterbuildings@saskatoon.ca
Permit Information for Contractors
Applicants are responsible for ensuring their retrofit project complies with all applicable municipal and provincial regulations, codes, permit requirements, utility interconnection requirements, manufacturer installation requirements, occupational health and safety requirements, and other legal requirements. Program approval does not replace approvals required from permitting authorities, utilities, inspectors, lenders, mortgage holders, insurers, or other regulators. Applicants must obtain and close all required permits. For more information, check out the Homebuilding, Renovations & Improvements webpage. Failure to obtain or close required permits may delay payments, delay final project approval, or result in some costs being ineligible for Program financing.
Visit the epermitting website to sign on or create an account to open up a permit today!
Additional Resources and Funding Opportunities
For a complete list of rebates, grants, tax incentives, technical assistance programs, and other funding opportunities that can be combined ("stacked") with the CEL Program to reduce project costs and improve project feasibility. Visit the Commercial Energy Resources webpage.
![]() | This project was carried out with assistance from the Green Municipal Fund, a Fund financed by the Government of Canada and administered by the Federation of Canadian Municipalities. Notwithstanding this support, the views expressed are the personal views of the authors, and the Federation of Canadian Municipalities and the Government of Canada accept no responsibility for them. © 2026, City of Saskatoon. All Rights Reserved. |
.png)