News Releases
Saskatoon Fire - News Releases
ENHANCED WATER TREATMENT PROCESS IN TESTING PHASE
April 17, 2015 - 10:03am
The Water Treatment Plant is in the first stages of commissioning the biggest addition to the plant in more than 50 years.
After two years of construction, city staff and Graham Construction have begun pre-commissioning of the new water reservoir, high lift pumping station, and Ultra-Violet treatment facility which is located at Avenue H and 11th Street. This involves methodical testing and operation of numerous pipes, pumps, valves, controls, and monitoring sensors, both individually and as a system, which must integrate with existing plant infrastructure. Extreme care is taken during this process, and the new infrastructure could be fully operational as early as May 30, 2015.
This infrastructure will further enhance the reliability and safety of the City’s drinking water system. Saskatoon is one of the first cities in Canada to add ultraviolet to its treatment process to provide an additional barrier to the multi-barrier treatment process.
Many precautions and back-up systems are in place to prevent any adverse impacts to residents during commissioning.
A grand opening event with His Worship Mayor Donald Atchison, Councillors, and provincial and federal representatives from Canada-Saskatchewan Building Canada Fund will be held, with the date to be announced. Public tours will be made available at that time as well.
As commissioning proceeds, further PSAs will be issued at key milestones.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
WEEKEND ROAD REPORT, APRIL 18-19
April 17, 2015 - 8:22am
NEW SUNDAY
WARMAN RD NB CURB (OUTSIDE) LANE CLOSED BETWEEN 7TH AVE N AND CAVERS ST
(Sasktel manhole work)
Start: April 19, 8:00 a.m. End: April 19, 12:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
CREWS OUT IN FULL FORCE REPAIRING POTHOLES 7-DAYS A WEEK
April 16, 2015 - 9:01am
- The standardized use of so called “hot boxes” instead of open-back trucks, to control the temperature of the hot-mix asphalt during patching, will result in better quality, longer lasting repairs.
- Improved work zone set ups including increased signage and protocols will ensure enhanced worker safety and clearer direction for drivers.
- Inspectors will begin rating back lanes next week to determine the level of repairs required and the Back Lane Maintenance and Reconstruction will begin around June.
- Permanent repairs to Utility Cuts will begin early May. Utility Cuts are excavations required to connect, repair or maintain underground utilities. Cuts have straight edges and can range in size from one foot to more than 10 feet wide and are gravel filled. These are not considered potholes. Residents can view the status of these repairs on the Utility Cuts and Repair Schedule map.
Pothole repairs are in full swing with crews using 195 tonnes of asphalt to repair the equivalent of approximately 11,000 potholes since hot-mix asphalt became available on April 8, 2015. This measurement is based on an average sized pothole with a 12” diameter and 4” depth.
“With the good weather we’ve been able to get out a week ahead of previous years to begin patching potholes with hot-mix asphalt,” says Pat Hyde, Director of Public Works. “Crews are out 7-days a week inspecting and repairing potholes, but we can’t be everywhere at once. Residents can help us by using the enhanced Report-a-Pothole map to report locations.”
Since the new and improved Report-a-Pothole map was launched on April 2, 2015, 839 locations have been reported. New locations reported on the map are inspected each morning and are rated to determine priority. Pothole repairs are prioritized based on their size, depth, location within the roadway (driving lane, curb lane etc.), and the traffic volume on that street.
“Potholes that cause concern in the driving lanes of high traffic streets and potholes with the potential to cause damage are repaired first,” says Hyde. “This enables us to cover more area on the priority streets faster and we return at a later date to repair the remaining minor potholes.”
The Spring Pothole Blitz is currently focused along many of the same high-traffic streets as the Spring Street Sweeping Blitz programs at which point many of the potholes reported on the map will be addressed. View the schedule at saskatoon.ca/betterroads. Pothole repairs for all remaining streets will follow the Accelerated City Wide Neighbourhood Sweeping program due to begin in early May.
2015 Improvements:
If the mild weather continues, we expect the frost to be completely out of the ground in the next few weeks at which point the following programs will begin:
For more information and the visit saskatoon.ca/betterroads.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
HOLIDAY PARK AND SILVERWOOD GOLF COURSES SCHEDULED TO OPEN
April 16, 2015 - 8:35am
City of Saskatoon golf courses are ready to welcome golfers for another season. Holiday Park and Silverwood Golf Courses will open this week, and follow Wildwood Golf Course, which opened Thursday, April 9, 2015.
Holiday Park (Phone: 306-975-3325; 1630 Avenue U South)
Friday, April 17: 12 p.m. (all holes)
Silverwood (Phone: 306-975-3314; 3503 Kinnear Avenue)
Thursday, April 16: 12 p.m. (Front/Lake 9)
Saturday, April 18: 7 a.m. (Back/River 9)
Wildwood (Phone: 306-975-3320; 4050 8th Street East)
Opened April 9
Online tee time reservations are available for Holiday Park and Silverwood starting at 12 p.m., Thursday, April 16 at www.saskatoon.ca/golf. Golfers are able to book 9 or 18 holes of play for groups of one to four players up to ten days in advance at any of the three municipal golf courses. Online tee time reservations are not available for same day bookings. Same day bookings can be completed by phone or in person. A valid email address is required to make tee time reservations.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
THE NEXT HOUSEHOLD HAZARDOUS WASTE DAY IS SATURDAY, APRIL 18
April 16, 2015 - 8:35am
- April 18
- May 23
- June 20
- July 4
- August 15
- September 19
- October 17
- November 21
Household hazardous waste requires proper disposal to reduce risks to humans and animals, and prevent pollution of our land, water and air. These materials should not be placed in your garbage or recycling bins, poured down the drain or toilet, or released into the environment.
To ensure household hazardous materials are safely disposed of or recycled, the City coordinates regular Household Hazardous Waste Days for residents to drop-off these materials. A temporary site will be set up at SaskTel Centre parking lot (101 - 3515 Thatcher Avenue) from 9:00 a.m. to 3:30 p.m., on the following dates in 2015:
2015 Household Hazardous Waste Days:
For a complete list of materials accepted at HHW Days, please visit Saskatoon.ca/hazardouswaste. A number of items can also be returned to local retailers for convenient and safe disposal or recycling – for current opportunities in the community, please visit Saskwastereduction.ca.
Leftover paint and empty paint cans are accepted without charge at all SARCAN recycling depots in Saskatoon. Please do not bring paint to Household Hazardous Waste Days unless it is not accepted through the SARCAN program. A complete list of paint/paint products accepted at SARCAN locations can be found at www.sarcan.ca/pages/paint.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
- 30 –