DAILY ROAD REPORT, JULY 13
July 10, 2015 - 10:13am
NEW
IDYLWYLD DR N/HIGHWAY 16 NB & SB LANE RESTRICTIONS FROM 51ST ST E TO MARQUIS DR W
(Hwy 16 flyover repair)
Two-way traffic on Idylwyld Dr SB lanes will accommodate Hwy 16 NB traffic
Start: July 13, 9:00 a.m. End: September 11, 5:00 p.m.
BROADWAY AVE NB & SB MEDIAN (INSIDE) LANES CLOSED FROM SASKATCHEWAN CRESCENT TO 11TH ST
(Preparation for upcoming sanitary lining work)
No access to 12th St EB from Broadway Ave SB
Start: July 13, 9:00 p.m. End: July 14, 6:00 a.m.
IDYLWYLD DR N SB CURB (OUTSIDE) LANE FROM 38TH ST W TO 37TH ST W
(SL&P underground cable repair)
Start: July 13, 9:00 a.m. End: July 13, 3:00 p.m.
22ND ST E EB LEFT TURN LANE CLOSED AT PACIFIC AVE INTERSECTION
(Valve hydro-vac)
Start: July 13, 10:30 a.m. End: July 13, 2:30 p.m.
22ND St W EB/WB LANE RESTRICTIONS FROM FAIRMONT DR TO CIRCLE DR
(Resurfacing)
Start: July 13, 6:00 p.m. End: July 14, 6:00 a.m.
CONFEDERATION DR CLOSED AT 22ND St W
(Resurfacing)
Use Diefenbaker Drive
Start: July 13, 6:00 p.m. End: July 14, 6:00 a.m.
ONGOING
8TH ST E CLOSED BETWEEN HILLCREST MEMORIAL RD & MCORMOND DR
(Road paving)
Start: July 8, 9:00 a.m. End: July 14, 5:00 p.m.
NIGHT WORK: ATTRIDGE DR EB & WB MEDIAN (INSIDE) LANES CLOSED BETWEEN CENTRAL AVE & CIRCLE DR
(Road widening)
Night work only. Restrictions set at 6.30 p.m. and lifted at 6.30 a.m. daily.
Start: July 13, 6:30 p.m. End: July 21, 6:30 a.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 17, 5:00 p.m.
CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 17, 5:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
WEEKEND ROAD REPORT, JULY 11 to JULY 12
July 10, 2015 - 8:54am
NEW
22ND ST E WB CURB (OUTSIDE) LANE CLOSED FROM 1ST AVE N TO IDYLWYLD DR N
(Concrete repairs)
Start: July 10, 10:00 a.m. End: July 11, 6:00 p.m.
22ND ST E EB (OUTSIDE) LANE CLOSED FROM IDYLWYLD DR S TO AUDITORIUM AVE
(Concrete repairs)
Start: July 10, 10:00 a.m. End: July 11, 6:00 p.m.
22ND ST W LOOP CLOSED FROM 22ND ST W TO CIRCLE DR W
(Resurfacing)
Use Laurier Access
Start: July 11, 6:00 p.m. End: July 12, 6:00 a.m.
8TH ST E WB LANES CLOSED FROM GARRISON CRES TO LOUISE AVE
(Catch basin lead repair)
Two-way traffic will be accomodated in the EB lanes
Start: July 12, 9:00 a.m. End: July 12, 5:00 p.m.
22ND ST W EB/WB LANE RESTRICTIONS FROM FAIRMONT DR TO CIRCLE DR
(Resurfacing)
Start: July 12, 6:00 p.m. End: July 13, 6:00 a.m.
CONFEDERATION DR CLOSED AT 22ND St W
(Resurfacing)
Use Diefenbaker
Start: July 12, 6:00 p.m. End: July 13, 6:00 a.m
ONGOING
8TH ST E CLOSED BETWEEN HILLCREST MEMORIAL RD & MCORMOND DR
(Road paving)
Start: July 8, 9:00 a.m. End: July 14, 5:00 p.m.
NIGHT WORK: ATTRIDGE DR EB & WB MEDIAN (INSIDE) LANES CLOSED BETWEEN CENTRAL AVE & CIRCLE DR
(Road widening)
Night work only. Restrictions set at 6.30 p.m. and lifted at 6.30 a.m. daily.
Start: July 6, 6:30 p.m. End: July 11, 6:30 a.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 17, 5:00 p.m.
CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 17, 5:00 p.m.
AIRPORT DR NB & SB MEDIAN (INSIDE) LANES CLOSED FROM 45TH ST W TO CYNTHIA ST
(Road construction)
Start: June 8, 9:00 a.m. End: July 11, 4:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
EIGHT NEAR MISSES REPORTED AS DRIVERS DISREGARD WORK ZONE BARRIERS
July 10, 2015 - 5:28am
While the majority of drivers are slowing down, paying attention and respecting work zones some drivers are still disregarding work zone safety measures. So far this year, eight near misses have been reported and all as a result of drivers disobeying barriers and signage.
“During recent work on Warman Road, our crews witnessed 22 vehicles within half an hour ignore barriers and drive through a work zone to get to the Lawson Mall,” says Angela Gardiner, Director of Transportation. “We know it can be frustrating when construction prevents drivers from continuing on their usual route but the signs and barriers are there to keep our workers as well as road users safe.”
Work zone signs and barriers are set up for a number of reasons and at times will remain in place even when workers are not present:
To protect workers and allow them to focus on the job so they can safely and efficiently complete this year’s construction projects
-Protect drivers from hazards on the road
-Allow pavement or concrete to set
-Prevent property or vehicle damage
Construction workers are reporting violations to Police which may result in charges being laid. They are also beginning to set up cameras in work zones to catch offenders. The Saskatoon Police Service enforces the Traffic Bylaw and the Provincial Traffic Safety Act with fines starting at $210.
The City is continuing the most aggressive program of road construction, repair and maintenance ever seen in Saskatoon and to complete this work, we need everyone to make safety a priority.
“We care about the safety of our employees and everyone who uses Saskatoon roads,” says Gardiner. “If everyone does their part, plans ahead and respects construction zones, we will be able to work through the 2015 construction season safely and successfully.”
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map at saskatoon.ca/ConstructionMap. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert.
DAILY ROAD REPORT, JULY 10
July 9, 2015 - 9:46am
NEW
23RD ST E EB & WB CLOSED FROM 3RD AVE N TO 4TH AVE N
(Canada Remembers Air Show media event)
Start: July 10, 11:00 a.m. End: July 10, 3:30 p.m.
CIRCLE DR E WB CURB (OUTSIDE) LANE CLOSED FROM 1ST AVE N TO FAITHFULL AVE
(Paving)
Start: July 10, 9:00 a.m. End: July 10, 5:00 p.m.
SILVERWOOD RD CLOSED AT EAST LEG OF CHAN CRES INTERSECTION
(Storm sewer lead repair)
Detour through O'Brien Cres
Start: July 10, 7:00 a.m. End: July 10, 5:00 p.m.
22ND ST W LOOP CLOSED FROM 22ND ST W TO CIRCLE DR W
(Resurfacing)
Use Laurier Access
Start: July 10, 7:00 p.m. End: July 11, 6:00 a.m.
8TH ST E WB & EB MEDIAN (INSIDE) LANES FROM ARGYLE AVE TO ARGYLE AVE
(Streetlight replacement)
Start: July 10, 10:30 a.m. End: July 10, 12:30 p.m.
22ND ST E WB CURB (OUTSIDE) LANE CLOSED FROM 1ST AVE N TO IDYLWYLD DR N
(Concrete repairs)
Start: July 10, 10:00 a.m. End: July 11, 6:00 p.m.
22ND ST E EB (OUTSIDE) LANE CLOSED FROM IDYLWYLD DR S TO AUDITORIUM AVE
(Concrete repairs)
Start: July 10, 10:00 a.m. End: July 11, 6:00 p.m.
ONGOING
8TH ST E CLOSED BETWEEN HILLCREST MEMORIAL RD & MCORMOND DR
(Road paving)
Start: July 8, 9:00 a.m. End: July 14, 5:00 p.m.
NIGHT WORK: ATTRIDGE DR EB & WB MEDIAN (INSIDE) LANES CLOSED BETWEEN CENTRAL AVE & CIRCLE DR
(Road widening)
Night work only. Restrictions set at 6.30 p.m. and lifted at 6.30 a.m. daily.
Start: July 6, 6:30 p.m. End: July 11, 6:30 a.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 17, 5:00 p.m.
2ND AVE S CLOSED BETWEEN SAUNDERS PL & SPADINA CRES E
(Hydrant installation)
Start: July 6, 7:00 a.m. End: July 10, 5:00 p.m.
CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 17, 5:00 p.m.
AIRPORT DR NB & SB MEDIAN (INSIDE) LANES CLOSED FROM 45TH ST W TO CYNTHIA ST
(Road construction)
Start: June 8, 9:00 a.m. End: July 11, 4:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
DAILY ROAD REPORT, JULY 9
July 8, 2015 - 8:36am
NEW
2ND AVE S CLOSED FROM 20TH ST E TO 23RD ST E / 21ST ST E CLOSED FROM 1ST AVE S TO 3RD AVE S
(Sidewalk Sale)
Start: July 9, 6:00 a.m. End: July 11, 9:00 p.m.
IDYLWYLD DR N NB MEDIAN (INSIDE) LANE CLOSED FROM 39TH ST E TO 44TH ST E
(Guardrail repairs)
Start: July 9, 9:00 a.m. End: July 10, 3:00 p.m.
CENTRAL AVE SB CURB (OUTSIDE) LANE CLOSED FROM KONIHOWSKI RD TO ATTRIDGE DR
(Shoulder work)
Start: July 9, 9:00 a.m. End: July 11, 3:00 p.m.
NIGHT WORK: 22ND ST W EB CURB (OUTSIDE) LANE CLOSED FROM FAIRLIGHT DR TO CIRCLE DR W
(Paving)
Circle Dr NB exit to 22nd St closed
Start: July 9, 7:00 p.m. End: July 10, 6:00 a.m.
NIGHT WORK: CIRCLE DR E OVERPASS OVER 8TH ST E CLOSED
(Bridge washing)
Use 8th St off and on ramps to continue on Circle Dr
Start: July 9, 9:00 p.m. End: July 10, 5:00 a.m.
ONGOING
8TH ST E CLOSED BETWEEN HILLCREST MEMORIAL RD & MCORMOND DR
(Road paving)
Start: July 8, 9:00 a.m. End: July 14, 5:00 p.m.
NIGHT WORK: ATTRIDGE DR EB & WB MEDIAN (INSIDE) LANES CLOSED BETWEEN CENTRAL AVE & CIRCLE DR
(Road widening)
Night work only. Restrictions set at 6.30 p.m. and lifted at 6.30 a.m. daily.
Start: July 6, 6:30 p.m. End: July 11, 6:30 a.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 17, 5:00 p.m.
2ND AVE S CLOSED BETWEEN SAUNDERS PL & SPADINA CRES E
(Hydrant installation)
Start: July 6, 7:00 a.m. End: July 10, 5:00 p.m.
CONFEDERATION DR SB CURB (OUTSIDE) LANE CLOSED FROM LAURIER DR TO 22ND ST W
(Concrete work)
Start: June 18, 9:00 a.m. End: July 9, 5:00 p.m.
CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 17, 5:00 p.m.
AIRPORT DR NB & SB MEDIAN (INSIDE) LANES CLOSED FROM 45TH ST W TO CYNTHIA ST
(Road construction)
Start: June 8, 9:00 a.m. End: July 11, 4:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE.
DAILY ROAD REPORT, JULY 8
July 7, 2015 - 8:32am
NEW
22ND ST W EB CURB (OUTSIDE) & CENTRE LANES CLOSED FROM AVE J N TO AVE I N
(Emergency SaskTel repair)
Start: July 8, 4:00 a.m. End: July 8, 7:00 a.m.
IDYLWYLD DR SB MEDIAN (INSIDE) LANE CLOSED 44TH ST TO 39TH ST
(Guardrail repairs)
Start: July 8, 9:00 a.m. End: July 8, 3:00 p.m.
8TH ST E CLOSED BETWEEN HILLCREST MEMORIAL RD & MCORMOND DR
(Road paving)
Start: July 8, 9:00 a.m. End: July 14, 5:00 p.m.
NIGHT WORK: 22ND ST WB CURB (OUTSIDE) & CENTRE LANE & EB CURB (OUTSIDE) LANE CLOSED BETWEEN PEDESTRIAN OVERPASS & CIRCLE DR NB EXIT
(Road paving)
Start: July 8, 7:00 p.m. End: July 9, 6:00 a.m.
NIGHT WORK: 51ST ST EB & WB MEDIAN (INSIDE) LANES CLOSED FROM IDYLWYLD DR SERVICE RD TO HANGAR RD
(Bridge washing)
Start: July 8, 9:00 p.m. End: July 9, 5:00 a.m.
NIGHT WORK: WARMAN RD OVERPASS OVER CIRCLE DR SB & NB CURB (OUTSIDE) LANES CLOSED
(Bridge washing)
Start: July 8, 9:00 p.m. End: July 9, 5:00 a.m.
ONGOING
NIGHT WORK: ATTRIDGE DR EB & WB MEDIAN (INSIDE) LANES CLOSED BETWEEN CENTRAL AVE & CIRCLE DR
(Road widening)
Night work only. Restrictions set at 6.30 p.m. and lifted at 6.30 a.m. daily.
Start: July 6, 6:30 p.m. End: July 11, 6:30 a.m.
3RD AVE CLOSED FROM 23RD ST TO 25TH ST
(Road resurfacing)
25th St EB curb lane closed at 3rd Ave
Start: July 6, 7:00 a.m. End: July 8, 6:00 p.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 17, 5:00 p.m.
2ND AVE S CLOSED BETWEEN SAUNDERS PL & SPADINA CRES E
(Hydrant installation)
Start: July 6, 7:00 a.m. End: July 10, 5:00 p.m.
CONFEDERATION DR SB CURB (OUTSIDE) LANE CLOSED FROM LAURIER DR TO 22ND ST W
(Concrete work)
Start: June 18, 9:00 a.m. End: July 8, 5:00 p.m.
UPDATE: CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 17, 5:00 p.m.
AIRPORT DR NB & SB MEDIAN (INSIDE) LANES CLOSED FROM 45TH ST W TO CYNTHIA ST
(Road construction)
Start: June 8, 9:00 a.m. End: July 11, 4:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE.
SASKATOON FIRE DEPARTMENT SENDS MORE STAFF & EQUIPMENT TO LA RONGE
July 6, 2015 - 3:35am
The Saskatoon Fire Department (SFD) now has a total of 15 firefighters on the ground in La Ronge, helping to protect the community’s industrial area from area wildfires. The firefighters are on 12 hour shifts as they monitor the area 24 hours per day. In addition to the firefighters, the SFD has sent one fire engine, one water truck, and one brush truck to La Ronge. The City of Saskatoon has offered two more water trucks from the Public Works Division, if requested.
The request for additional logistical support and the need to protect structures within the La Ronge industrial area came from Provincial Emergency Management and Fire Safety on Saturday, July 4. The SFD will be sending more staff on a rotational basis, still ensuring Saskatoon residents that it will not expose the City to any vulnerability by supporting firefighting efforts in northern Saskatchewan.
There have been no further requests for the City of Saskatoon to host additional evacuees of the northern wildfires. Currently, there are approximately 350 guests at the Hank Ruys Soccer Centre and hundreds more are staying in hotels and with family and friends.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
SASKATOON FIREFIGHTERS, FIRE ENGINE, AND WATER TRUCK DEPLOYED TO LA RONGE
July 5, 2015 - 3:47am
The Saskatoon Fire Department (SFD) has sent seven firefighters to La Ronge as the northern Saskatchewan wildfires begin to encroach on the community. In addition to the firefighters, the SFD has sent one fire engine and one water truck. The request for additional logistical support and the need to protect structures within the community’s industrial area came from the Province’s Emergency Management and Fire Safety on Saturday, July 4.
The Saskatoon firefighters, fire engine, and water truck arrived in La Ronge by 4:00 a.m. on Sunday, July 5. The SFD may send more staff on a rotational basis, but is ensuring complete coverage of personnel and equipment within the City. The City of Saskatoon has also offered two more water trucks from the Public Works Division, if requested.
There have been no further requests for the City of Saskatoon to host additional evacuees of the northern wildfires. Currently, there are approximately 350 guests at the Hank Ruys Soccer Centre and hundreds more are staying in hotels and with family and friends. The City will open the SaskTel Soccer Centre if the need arises.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
DAILY ROAD REPORT, JULY 6
July 3, 2015 - 10:11am
NEW
3RD AVE CLOSED FROM 23RD ST TO 25TH ST
(Road resurfacing)
25th St EB curb lane closed at 3rd Ave
Start: July 6, 7:00 a.m. End: July 8, 6:00 p.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 17, 5:00 p.m.
2ND AVE S CLOSED BETWEEN SAUNDERS PL & SPADINA CRES E
(Hydrant installation)
Start: July 6, 7:00 a.m. End: July 10, 5:00 p.m.
NIGHT WORK: ATTRIDGE DR EB & WB MEDIAN (INSIDE) LANES CLOSED BETWEEN CENTRAL AVE & CIRCLE DR
(Road widening)
Night work only. Restrictions set at 6.30 p.m. and lifted at 6.30 a.m. daily.
Start: July 6, 6:30 p.m. End: July 11, 6:30 a.m.
NIGHT WORK: 22ND ST W EB CURB (OUTSIDE) LANE CLOSED FROM FAIRMONT DR TO CONFEDERATION DR
(Paving)
No right turn to Confederation Dr
Start: July 6, 7:00 p.m. End: July 7, 6:00 a.m.
NIGHT WORK: CIRCLE DR NB & SB MEDIAN LANES CLOSED BETWEEN LAURIER DR & CLANCY DR
(Bridge washing)
Start: July 6, 9:00 p.m. End: July 7, 5:00 a.m.
ONGOING
SPADINA CRES W CLOSED BETWEEN AVE A S & AVE C S
(Wakeride)
Ave B closed approaching Spadina Cres
Start: July 3, 8:00 a.m. End: July 6, 12:00 p.m.
SPADINA CRES E WB CLOSED FROM 3RD AVE S TO 20TH ST E
(Saskatchewan Jazz Festival)
Start: June 22, 7:00 a.m. End: July 7, 6:00 a.m.
UPDATE: CONFEDERATION DR SB CURB (OUTSIDE) LANE CLOSED FROM LAURIER DR TO 22ND ST W
(Concrete work)
Start: June 18, 9:00 a.m. End: July 8, 5:00 p.m.
HWY 11 NB & SB MEDIAN (INSIDE) LANES CLOSED AT VICTOR RD
(Stonebridge Interchange construction)
Start: June 15, 10:00 a.m. End: July 6, 6:00 p.m.
CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 8, 5:00 p.m.
AIRPORT DR NB & SB MEDIAN (INSIDE) LANES CLOSED FROM 45TH ST W TO CYNTHIA ST
(Road construction)
Start: June 8, 9:00 a.m. End: July 11, 4:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE.
WEEKEND ROAD REPORT, JULY 4-5
July 3, 2015 - 8:37am
NEW SUNDAY
CIRCLE DR W EB CURB (OUTSIDE) LANE CLOSED BETWEEN AVE A N & IDYLWYLD DR N
(Electronic work)
Start: July 5, 6:00 a.m. End: July 5, 8:00 a.m.
3RD AVE & 23RD ST INTERSECTION CLOSED
(Road resurfacing)
*The Transit Bus Mall will be temporarily relocated to 2nd Ave between 23rd St & 24th St*
Start: July 5, 7:00 a.m. End: July 5, 6:00 p.m.
VALLEY RD NB TO CIRCLE DR EB RAMP CLOSED / CIRCLE DR EB TO LORNE AVE RAMP CLOSED
(Prairie Grand Fondo)
Circle Dr EB curb lane closed from Valley Rd to Lorne Ave
Start: July 5, 9:00 a.m. End: July 5, 3:00 p.m.
ONGOING
SPADINA CRES W CLOSED BETWEEN AVE A S & AVE C S
(Wakeride)
Ave B closed approaching Spadina Cres
Start: July 3, 8:00 a.m. End: July 6, 12:00 p.m
SPADINA CRES E WB CLOSED FROM 3RD AVE S TO 20TH ST E
(Saskatchewan Jazz Festival)
Start: June 22, 7:00 a.m. End: July 7, 6:00 a.m.
UPDATE: CONFEDERATION DR SB CURB (OUTSIDE) LANE CLOSED FROM LAURIER DR TO 22ND ST W
(Concrete work)
Start: June 18, 9:00 a.m. End: July 8, 5:00 p.m.
HWY 11 NB & SB MEDIAN (INSIDE) LANES CLOSED AT VICTOR RD
(Stonebridge Interchange construction)
Start: June 15, 10:00 a.m. End: July 6, 6:00 p.m.
CENTRAL AVE CLOSED FROM SOMERS RD TO AGRA RD
(Force main installation)
Start: June 12, 9:00 a.m. End: July 8, 5:00 p.m.
AIRPORT DR NB & SB MEDIAN (INSIDE) LANES CLOSED FROM 45TH ST W TO CYNTHIA ST
(Road construction)
Start: June 8, 9:00 a.m. End: July 11, 4:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.