News Releases
Saskatoon Fire - News Releases
“LAST CALL” PROMOTION BEGINS AT CITY LEISURE CENTRES ON MONDAY, SEPTEMBER 1, 2014
August 28, 2014 - 6:00pm
Squeeze every last hour out of your day with Recreation and Sport’s new “Last Call” promotion. Beginning Monday, September 1, 2014, patrons can take advantage of the final hour of operation at any City of Saskatoon Leisure Centre fitness and exercise room, walking track, and open gym seven days a week for a cheap $3 admission!
The “Last Call” promotion is available at Cosmo Civic Centre, Harry Bailey Aquatic Centre, Lakewood Civic Centre, Lawson Civic Centre, Saskatoon Field House and Shaw Centre. It is not offered at the Fitness Circuit & Terry Fox Track and excludes swimming and drop-in fitness classes.
For more information on the “Last Call” promotion and other Leisure Centre admission offerings, such as discounted Bulk Tickets and LeisureCards, visit www.saskatoon.ca/go/leisurecard.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
FIREWORKS REGULATIONS FOR LABOUR DAY
August 28, 2014 - 6:00pm
Saskatoon Fire Department reminds the residents of Saskatoon that on Labour Day low-hazard fireworks can only be detonated on private property between the hours of dusk to 11:00pm.
Low-hazard or family fireworks are designed for public recreational use and include some roman candles, sparklers, fountains, wheels, volcanoes, mines and snakes that do not travel above 18m (60ft.). High-hazard fireworks are designed for professionals and can only be purchased by persons holding a valid Fireworks Supervisor – Level I or Level II card issued by Natural Resources Canada.
Before setting off fireworks on your private property choose your location wisely and carefully follow all of the instructions on the fireworks. You will need a wide clear site with no overhead obstructions. For example, a roman candle needs an area of about 30m (100ft) by 30m (100ft) with enough room for spectators around the perimeter. Keep in mind that you are responsible for any debris that may land on your spectators or another person’s property.
After dusk, when you are ready to fire, make sure that it is not windy, that everyone under 18 is supervised by an adult and that you always carefully light the fuse at its tip. Other than sparklers, never light or hold a lit firework in your hand.
Wait at least 30 minutes for the fireworks to cool before beginning the clean-up process. It is safest to dispose of used fireworks and debris in a pail of water. Never try to relight or fix the fuse on fireworks that didn’t ignite.
Detonating low-hazard fireworks outside of the specified timeframe or on public property is prohibited in the Fire and Protective Services Bylaw No. 7990. Please report unauthorized use or discharge of fireworks to the Saskatoon Fire Department by calling 306-975-3030.
Persons wanting to have a fireworks display that includes high-hazard fireworks, detonating low-hazard fireworks on public property, or any fireworks display outside of the designated times, must first obtain a Fireworks Permit. For information on Fireworks Permits, please contact the Marshal at 306-975-2520 or visit www.saskatoon.ca.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
LONG WEEKEND ROAD REPORT, AUGUST 30 – SEPTEMBER 1
August 28, 2014 - 6:00pm
NEW SATURDAY
BROADWAY BRIDGE CLOSED FROM 3RD AVE N TO 12TH ST E
(Fireworks Festival)
Saskatchewan Cres closed from 13th St E to Broadway Ave. Restrictions reset Friday and Saturday night.
Start: August 29, 7:00 p.m. End: August 30, 11:00 p.m.
NEW SUNDAY
CIRCLE DR NB RAMP TO PRESTON AVE WB CLOSED
(Light pole work)
Start: August 31, 7:30 a.m. End: August 31, 12:00 p.m.
IDYLWYLD SERVICE RD WB CLOSED FROM 51ST ST TO IDYLWYLD DR
(Light pole work)
Start: August 31, 9:00 a.m. End: August 31, 12:00 p.m.
CIRCLE DR WB RAMP TO WARMAN RD CURB (OUTSIDE) LANE CLOSED
(Light pole work)
Start: August 31, 10:30 a.m. End: August 31, 12:00 p.m.
ONGOING
SPADINA CRES CLOSED FROM 2ND AVE N TO 20TH ST E
(Fireworks Festival)
Start: August 29, 4:00 p.m. End: August 31, 12:00 p.m.
TAYLOR ST W CLOSED FROM SASKATCHEWAN CRES W TO LORNE AVE
(Road Resurfacing)
Start: August 25, 9:00 a.m. End: August 30, 6:00 p.m.
CENTRAL AVE SB LANES CLOSED FROM 110TH ST W TO 112TH ST W
(Streetscaping)
Two-way traffic in NB lanes
Start: August 25, 10:00 a.m. End: September 20, 7:00 p.m.
33RD ST W EB LANES CLOSED FROM AVE Y N TO AVE W N
(water main lining)
Two-way traffic set in WB lanes of 33rd St
Start: August 22, 10:30 a.m. End: September 19, 6:00 p.m.
AIRPORT DR NB LANES CLOSED ON FROM GATEWAY BLVD TO THE AIRPORT
(roadway improvements)
Two-way traffic accommodated in the SB lanes. 45th St W closed from Koyl Ave to Airport Dr.
Start: August 20, 1:00 p.m. End: October 29, 6:00 p.m.
20TH ST W WB LANES CLOSED FROM AVE F S TO AVE G S
(Streetscaping)
Two way traffic will be accommodated in the EB lanes. Speed reduced to 30km/h
Start: August 7, 9:00 a.m. End: September 4, 6:00 p.m.
KINGSMERE BLVD ALL DIRECTIONS CLOSED AT AND WHITESHORE CR (E. LEG)
(Water pipe installation)
Bus routes will be affected. Please watch for temporary bus stop locations and allow extra time in case of delays. Call Saskatoon Transit at 306-975-3100
Start: August 7, 8:00 a.m. End: September 14, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map, find traffic detour information on our saskatoon.ca homepage or subscribe to our Traffic Detour Service Alerts. You can also follow us on Twitter @cityofsaskatoon and with #betterroadsYXE and like Saskatoon City News on Facebook.
WINTERIZATION OF PARK IRRIGATION SYSTEMS BEGINS TUESDAY, SEPTEMBER 2, 2014
August 28, 2014 - 6:00pm
Starting Tuesday, September 2, 2014, City of Saskatoon (City) crews will begin annual winterization of the 409 irrigation systems in Saskatoon parks. Winterization is an important maintenance procedure to help ensure the longevity of the City’s irrigation infrastructure.
Irrigation system winterization involves the use of large compressors that force air through the irrigation pipes, removing any residual water so it will not freeze in the pipes. The City follows all Occupational Health & Safety regulations, and requests that the public respect and follow all signage at worksites. The force of the air through the pipes shoots out water from the sprinkler heads at a high pressure and may pick up debris during this process.
To ensure public safety, residents are asked to please stay clear of all sprinkler heads and related winterization equipment during maintenance.
The winterization process is expected to take six weeks.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
CITY INVESTS $10.6 MILLION UPGRADING WATER & SEWER INFRASTRUCTURE
August 27, 2014 - 6:00pm
Crews have not only been busy improving the roadways this construction season; the City is also spending $10.6 million on water and sewer infrastructure upgrades.
“We are actively taking steps to improve our network,” says Chris Hallam, Director of Construction and Design. “We give priority to those water and sewer mains that have a high break history, in an effort to minimize the potential for future breaks.”
This spring and summer, the City has been rehabilitating 6.14 kilometres of water mains and almost 8 kilometres of storm and sanitary sewer mains using a technology that involves lining the existing pipes with an inner pipe, known as a Cured-In-Place Pipe. This trenchless method has proven to work well to extend the service life of a main. Instead of digging up the entire roadway, access pits are dug at either end of the pipe, which in turn is more cost effective and less disruptive to residents and drivers.
Water and sewer upgrades also involve lead connection replacements, storm and sanitary manhole rehabilitation and sanitary connection replacements.
“Although these upgrades are not as visible as road improvements, they are important in maintaining a high quality of infrastructure for our residents,” says Hallam. “Some of the road restrictions drivers are encountering, for example on 8th Street East and 11th Street West, are required for these types of upgrades.”
Meantime, the City has completed 65% of the 2014 Road Rehabilitation and Preservation program, resurfacing 119 lane kilometres to date. Crews have recently finished major resurfacing projects on Circle Drive, Millar Avenue and Idylwyld Drive.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information on our saskatoon.ca homepage or subscribe to our Traffic Detour Service Alerts. You can also follow us on Twitter @cityofsaskatoon and with #betterroadsYXE and like Saskatoon City News on Facebook.