News Releases
Saskatoon Fire - News Releases
LEAK ENTERS STORM DRAIN
October 3, 2014 - 12:00pm
|
For Release: October 4, 2014 |
|
At approximately 12:35 Saskatoon Fire Department responded to an unknown substance leaking from a Tractor trailer. Engine 4 was the first apparatus on scene and found a 3,000 litre tank that had been damaged and leaked into a parking lot at the south east corner of Avenue C and Cynthia Street.
The product was identified as an asphalt emulsion. This substance is not a serious health risk to people and the main concern was to minimize damage to the environment.
Engine 7 provided more absorbent and diking materials to minimize the spread of the product. It is estimated that diking prevented 500 litres from entering the storm basin. The Ministry of Environment, Saskatoon Police Service, Envirotec Services and the City of Saskatoon all responded to mitigate the spill in a timely fashion.
Within two and a half hours the storm drain line was identified and isolated to prevent further damage. No contaminant had reached the South Saskatchewan River. The Ministry of Environment remains in command of the incident as the cleanup process is underway.
No injuries occurred at this incident and no cost for the cleanup is available.
SHORT LIST OF TEAMS CHOSEN TO BUILD THE NORTH COMMUTER PARKWAY AND NEW TRAFFIC BRIDGE
October 2, 2014 - 12:00pm
The City is pleased to announce that based on the results of the Bridging to Tomorrow Request for Qualifications (RFQ), three teams have been chosen to move on to the Request for Proposals (RFP) stage for the North Commuter Parkway and the Traffic Bridge Replacement Project.
“As the project comprises not just the initial design and construction, but the operation and maintenance of the projects for a 30 year term, the RFP is a very comprehensive undertaking,” says Dan Willems, the City’s Bridging to Tomorrow Project Manager. “The successful team from this stage of the procurement process will be chosen to partner with the City on this important project.”
Seven applicant teams responded to the RFQ. Following a comprehensive evaluation of the submissions, the teams that will participate in the RFP process, listed alphabetically, are:
Bridge City Infrastructure Group (Aecon Concessions, Bank of Nova Scotia, CH2M Hill Canada Ltd., Flatiron Constructors Canada Limited, Hatch Mott MacDonald Ltd., Hochtief PPP Solutions North America Inc., P. Machibroda Engineering Ltd., Volker Stevin Highways Ltd.)
Bridge City Partners (Acciona Concessions Canada, AECOM, DIF Infra 3 Canada, Mainroad Holdings Ltd., Natixis, Pacer Projects Corp,
Graham Commuter Partners (ASL Paving, BBGI, Buckland & Taylor, Clifton, Gracorp Capital Partners LP, Graham Infrastructure, National Bank Financial, Tetra Tech)
The City's project team is currently working with its advisors to finalize the RFP document which will be released to the short-listed firms in December 2014.
PUBLIC SKATING AT LION’S ARENA CANCELLED SUNDAY, OCTOBER 5, 2014
October 3, 2014 - 12:00pm
CY14 -196
All public skating scheduled for Sunday, October 5, 2014 at Lion’s Arena is cancelled due to a mechanical failure with the ice making plant. Repairs are expected to be completed and the regular schedule to resume Monday, Oct. 6.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
WEEKEND ROAD REPORT, OCTOBER 4-5
October 2, 2014 - 12:00pm
NEW SATURDAY
22ND ST W EB & WB MEDIAN LANES CLOSED FROM AVE K N TO AVE O N
(Tree removal)
Start: October 4, 7:00 a.m. End: October 5, 6:00 p.m.
8TH ST E WB CURB & MEDIAN LANE CLOSED FROM VICTORIA AVE TO LORNE AVE
(Tree pruning)
Start: October 4, 7:00 a.m. End: October 4, 6:00 p.m.
SPADINA CRES CLOSED FROM 25TH ST TO OXFORD ST
(Bike event)
Start: October 4, 7:00 a.m. End: October 4, 1:00 p.m.
CIRCLE DR WB CURB (OUTSIDE) LANE CLOSED APPROACHING IDYLWYLD DR SB ON-RAMP
(Signal maintenance)
Start: October 4, 9:00 a.m. End: October 4, 12:00 p.m.
NEW SUNDAY
2ND AVE N SB CLOSED AT 22ND ST INTERSECTION
(Sign installation)
Start: October 5, 5:30 a.m. End: October 5, 10:30 a.m.
CIRCLE DR OVERPASS EB & WB MEDIAN LANES CLOSED OVER IDYLWYLD DR
(Microsurfacing/seal coating)
Start: October 5, 6:00 a.m. End: October 5, 10:00 a.m.
51ST ST OVERPASS EB & WB MEDIAN LANES CLOSED OVER IDYLWYLD DR
(Microsurfacing/seal coating)
Start: October 5, 6:00 a.m. End: October 5, 10:00 a.m.
IDYLWYLD DR NB MEDIAN (INSIDE) LANE CLOSED FROM STANLEY PL TO MINTO PL & FROM GREY PL TO THE ALLEY
(Median Repairs)
Start: October 5, 7:30 a.m. End: October 5, 4:00 p.m.
IDYLWYLD DR N SB CURB LANE CLOSED APPROACHING 38TH ST
(Sidewalk Repair)
Start: October 5, 7:30 a.m. End: October 5, 4:00 p.m.
SPADINA CRES CLOSED FROM 20TH ST TO 3RD AVE
(Light the Night Walk)
Start: October 5, 8:00 a.m. End: October 5, 9:30 p.m.
ONGOING
11TH ST W CLOSED FROM HIGHWAY 7 TO CHAPPELL DR
(Patch paving)
Sections of the road will be closed for patch paving. Access to businesses & compost depot will be maintained via 22nd St W
Start: September 23, 9:00 a.m. End: October 14, 6:00 p.m.
CENTRAL AVE NB CLOSED FROM 110TH ST W TO GRAY AVE
(Phase 3: Streetscaping)
NB traffic accommodated in SB lanes. SB traffic detoured via Egbert Ave & Bryans Ave
Start: September 23, 7:00 a.m. End: October 8, 6:00 p.m.
TAYLOR ST E CLOSED FROM MUNROE AVE S TO MCKINNON AVE S
(Water Main Lining)
Start: September 8, 8:00 a.m. End: October 8, 7:00 p.m.
33RD ST W EB LANES CLOSED FROM AVE Y N TO AVE W N
(Water main lining)
Two-way traffic set in WB lanes of 33rd St
Start: August 22, 9:00 a.m. End: October 4, 6:00 p.m.
AIRPORT DR NB LANES CLOSED FROM GATEWAY BLVD TO THE AIRPORT
(Roadway improvements)
Two-way traffic accommodated in SB lanes. 45th St W closed from Airport Dr to Koyl Ave
Start: August 20, 1:00 p.m. End: October 29, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information on our saskatoon.ca homepage or subscribe to our Traffic Detour Service Alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
DAILY ROAD REPORT, OCTOBER 6
October 2, 2014 - 12:00pm
NEW
MAIN ST CLOSED FROM BROADWAY AVE TO DUFFERIN AVE
(Crane lift)
No left turn from Broadway Ave SB to Main St EB
Start: October 6, 7:00 a.m. End: October 6, 5:00 a.m.
IDYLWYLD DR SB CURB (OUTSIDE) LANE CLOSED FROM 25TH ST TO 24TH ST
(Streetscaping)
Start: October 6, 9:00 a.m. End: October 10, 6:00 p.m.
IDYLWYLD DR SB CURB LANE CLOSED APPROACHING 38TH ST
(Sidewalk Repair)
Start: October 6, 9:00 a.m. End: October 6, 4:00 p.m.
IDYLWYLD DR NB MEDIAN (INSIDE) LANES CLOSED FROM STANLEY PL TO MINTO PL & FROM GREY PL TO ALLEY
(Median Repair)
Start: October 6, 9:00 a.m. End: October 6, 4:00 p.m.
ONGOING
11TH ST W CLOSED FROM HIGHWAY 7 TO CHAPPELL DR
(Patch paving)
Sections of the road will be closed for patch paving. Access to businesses & compost depot will be maintained via 22nd St W
Start: September 23, 9:00 a.m. End: October 14, 6:00 p.m.
CENTRAL AVE NB CLOSED FROM 110TH ST W TO GRAY AVE
(Phase 3: Streetscaping)
NB traffic accommodated in SB lanes. SB traffic detoured via Egbert Ave & Bryans Ave
Start: September 23, 7:00 a.m. End: October 8, 6:00 p.m.
TAYLOR ST E CLOSED FROM MUNROE AVE S TO MCKINNON AVE S
(Water Main Lining)
Start: September 8, 8:00 a.m. End: October 8, 7:00 p.m.
AIRPORT DR NB LANES CLOSED FROM GATEWAY BLVD TO THE AIRPORT
(Roadway improvements)
Two-way traffic accommodated in SB lanes. 45th St W closed from Airport Dr to Koyl Ave
Start: August 20, 1:00 p.m. End: October 29, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information on our saskatoon.ca homepage or subscribe to our Traffic Detour Service Alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
CITY DOG PARKS TO HOST “SCOOP THE POOP” EVENT AT ALL DOG PARKS ON SATURDAY, OCTOBER 4, 2014
October 1, 2014 - 12:00pm
- Avalon - south end of Broadway Avenue;
- Briarwood - south of Wilson's Greenhouse on McOrmond Drive;
- Caswell – next to Mayfair Outdoor Pool;
- Hampton Village - north on Range Road 3060, near the airport;
- Silverwood - access off Kinnear Avenue or the east end of Adilman Drive;
- Southwest - off Valley Road by the landfill; and
- Sutherland Beach - west of Central Avenue, north of Attridge Drive.
- Pick up after your dog;
- Dogs must stay ON LEASH in all areas of the city unless the area is clearly designated (signed) as an off-leash Dog Park;
- Dogs must be licensed to enjoy Dog Parks; and
- Please be considerate and courteous to other people and children enjoying the outdoors and keep in mind that not everyone is comfortable around dogs, even friendly ones.
Fall frenzy is in the air for both dogs and their owners. With the weather starting to cool off it is a great time to get out and enjoy the seven active off-leash Dog Parks operated by the City of Saskatoon (City). On Saturday, October 4, 2014, from 11 a.m. to 2 p.m., the City and volunteer Dog Park Ambassadors invite everyone to the first annual “Scoop the Poop” event being held at all parks:
Come out and meet your Dog Park Ambassador, volunteers, and fellow dog lovers as you join together in keeping your Dog Park clean and welcoming for all visitors. Refreshments and cleaning supplies provided.
With the increased use of Dog Parks, here are a few tips for being a responsible pet owner:
For more information on the event or to see a map of the Dog Parks, please visit www.saskatoon.ca/go/dogparks.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
- 30 -
CIVIC INDOOR ARENAS OPEN FOR PUBLIC SKATING AND PARENT AND TOT SKATING
October 1, 2014 - 12:00pm
-
Tuesday: 7:00 p.m. to 8:30 p.m.
-
Sunday: 2:30 p.m. to 4:00 p.m.
-
Monday and Thursday: 2:30 p.m. to 3:15 p.m.
- Sunday: 12:30 p.m. to 2:00 p.m.
-
Wednesday: 2:30 p.m. to 3:15 p.m.
-
Wednesday and Thursday: 12:00 p.m. to 1:00 p.m.
-
Friday: 12:00 p.m. to 1:00 p.m. and 7:00 p.m. to 8:30 p.m.
-
Sunday: 12:30 p.m. to 2:00 p.m.
-
Monday and Friday: 2:30 p.m. to 3:15 p.m.
-
Sunday: 2:30 p.m. to 4:00 p.m. and 6:45 p.m. to 8:15 p.m.
- Tuesday and Friday: 2:30 p.m. to 3:15 p.m.
-
Adult (19 and over) - $4.50;
- Youth (6 to 18) - $2.70;
- Preschool (5 and under) - Free; and
- Family - $9.00
Sharpen your skates, the civic indoor arenas are open for the season! The weekly Public Skating and Parent and Tot Skating sessions are as follows and will be in effect until Sunday, December 21, 2014:
ACT Arena: 107 105th Street East
Public Skating – now open
Parent and Tot Skating - Began Sunday, September 7, 2014
Archibald Arena: 1410 Windsor Street
Public Skating – Begins Sunday, October 5, 2014
Parent and Tot Skating – Begins Wednesday, November 5, 2014
Cosmo Arena: 3130 Laurier Drive
Public Skating – Begins Sunday, October 5, 2014
Parent and Tot Skating – Begins Monday, October 6, 2014
Lions Arena: 2205 McEown Avenue
Public Skating – Begins Sunday, October 5, 2014
Parent and Tot Skating – Begins Tuesday, November 4, 2014
Admission rates are as follows:
Children, 6 years and younger, must be accompanied by an adult, minimum of 16 years of age. A maximum of two preschoolers per adult is allowed. Parent and Tot Skating is free of charge.
Visit www.saskatoon.ca/go/rinks for a full calendar of public skate times and rink rental rates information.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
FIRE PREVENTION WEEK OPEN HOUSE
October 1, 2014 - 12:00pm
Have you ever wondered how difficult it is to use a fire hose; what it feels like to be on an aerial ladder or how quickly a fire grows? Come to the Saskatoon Fire Department’s annual Open House on Sunday, October 5th for free hot dogs and/or chili and find out.
October 5, 2014
Open House – Fire Station No. 1
125 Idylwyld Drive South
1:00 – 4:00 p.m.
Besides the chance to use a fire hose, ride an aerial ladder and watch some live burns there will also be sprinkler demonstrations, fire alarm panel demonstrations, a Bullex (an electronic screen designed to help people learn to use a fire extinguisher without fire) and free hot dogs and/or chili for the first 500 people.
Come early and stay for the afternoon.
TRANSIT PASS REFUNDS RECOMMENDED FOR LOCKOUT INCONVENIENCE
October 1, 2014 - 12:00pm
We’re pleased we now have a detailed plan to offer valid Transit pass customers a full month extension or refund for the month of September.
“Right from the start of the lockout we have been talking about offering compensation for our customers whose daily routines have been greatly disrupted without Transit service,” says Catherine Gryba, General Manager of Corporate Performance.
There are approximately 8,600 active one-month or longer-duration pass holders, 17,500 UPass holders and 1,000 EcoPass holders who were not able to fully utilize their pass for the month of September.
The refunds will be offered to Transit customers who hold a valid pass; they would receive a full one-month extension or a refund on a cash-card or cheque.
“We thought it made sense to offer pass extensions as a convenient option for transit customers,” Gryba says. “This would minimize the need for an additional trip to a refund centre and waiting in a customer service line.”
Refunds or a credit on a utility bill account would also be offered through a mail-in option that would reimburse customers for postage fees.
Customers would be able to pick up their refunds at a variety of locations, including City Hall, the Downtown Transit Customer Service Centre, one of six Leisure Centres, and at a mobile transit refund location. These options ensure the broadest access for as many customers as possible.
A key component to this plan is a comprehensive communications strategy. In fact, the annual Civic Services Survey consistently shows that citizens prefer using a wide range of traditional communication methods to receive civic information (see Attachment – 2014 Civic Services Survey – Preferred Information Sources). This includes the news media, radio and print advertising.
“Given our broad and diverse population, it would not be reasonable for the City to rely on journalists alone to deliver City messages to the community,” Gryba says.
There will also be further communication costs incurred to inform transit pass holders on how they can receive their extension or reimbursement. These costs are anticipated to be approximately $20,000. A variety of communication tools will be used including paid radio and print advertising, posters, website updates, and social media.
The latest projected costs are part of the ongoing communication plan which began in mid-September.
The estimated costs were for keeping customers well informed about the service disruption and why the City made a difficult decision to proceed with a notice of lockout that would affect so many people.
Crucial information on wages and pensions was, and continues to be, a very complicated issue for transit Customers, citizens, taxpayers and all City employees.
“In order to give customers, citizens and taxpayers clear, concise and broadly communicated information, we achieve this by purchasing paid advertising spots on radio and in the daily print newspaper,” Gryba says.
The estimated costs below include design and production, placement fees for radio and StarPhoenix print advertising and flyers/posters:
Paid advertising - Transit Customers: $ 39,000
Paid advertising – Broad Community: $ 62,000
Total $101,000
Ongoing communication costs will continue to be monitored throughout the course of the current service disruption and when transit is back to normal operations.
The cost per person based on a rough Saskatoon population of 250,000 people is 41 cents.
Additionally customer service continues to be an important communications element. As a result, a third party call centre was contracted to provide this service during the lockout. The estimated costs between September 21 and September 30 are approximately $11,000.
“We anticipate increased call volumes around the refund plan. So we will continue to use the third party call centre to assist our customers,” Gryba says. “Balancing costs are always top of mind and they will monitored carefully throughout the course of the current service disruption,” Gryba says.
NEW ROAD DESIGN STANDARDS WILL SEE THICKER ASPHALT & IMPROVED DRAINAGE
October 1, 2014 - 12:00pm
The City of Saskatoon has adopted new pavement design guidelines which will shape the way new roadways are constructed in the city and will be mandatory beginning January 1, 2015.
“These new standards will result in stronger, longer lasting and more cost-effective roads in Saskatoon,” says Mike Gutek, Director of Major Projects. “The City’s current design standards allowed us to develop a quality road network for our climate and existing soil conditions but as Saskatoon expands we need to make improvements to accommodate different soil conditions and water table issues.”
The new guidelines are based on the design procedures outlined in the American Association of State Highway and Transportation Officials (AASHTO) Guide for Design of New Pavement Structures.
The key differences include:
- Thicker asphalt – This will result in a stronger more robust roadway.
- A required sub drainage system for all roadways – Water and frost are the primary cause of road failure in Saskatoon. A drier road means a stronger road.
- A deferred asphalt layer – A final layer of asphalt applied once new neighbourhood house construction is complete, typically two years after the roadway is built. This will address road issues related to increased heavy traffic during build out of neighbourhoods.
“These differences will help to minimize the risk of future full structural rehabilitations, which are extremely costly and disruptive,” says Gutek. “The new guidelines set a more robust design standard geared towards urban roadways with over 20 years of proven reliability.”
The AASHTO guidelines are used in many jurisdictions in Canada including BC, Alberta, Manitoba, Ontario, Quebec and Nova Scotia, as well as most of the United States.
The City is already beginning to build new roads in line with the improved standards; for example in the new Kensington neighbourhood.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.