News Releases
Saskatoon Fire - News Releases
ESTIMATED 100,000 POTHOLES FILLED SO FAR THIS SUMMER
July 24, 2015 - 4:04am
Midway into summer construction season, the equivalent of an estimated 100,000 potholes, based on a 12”x4” size, have been repaired on city streets. Since early April, 1,745 tonnes of hot asphalt has been used on pothole repairs alone – enough to fill 14 backyard swimming pools.
“Residents continue to tell us in our annual survey that road maintenance is their top priority for civic services,” says Pat Hyde, Director of Public Works. “They also participate in the repair process by calling in or going online to report issues, including the reporting of 2,300 potholes so far this season. We value this timely information because it allows us to map out repairs and to respond to and secure emergency locations quickly.”
Every reported road issue is inspected and rated as soon as possible to determine the urgency and type of repair. Ratings are based on: size, location (driving lane is a higher priority than curb lane), priority class of the street, and how hazardous the pothole is for drivers. Designated priority one and two streets take precedence as these are high-traffic routes that are used by emergency vehicles. Potholes that have the potential for causing damage are considered an emergency and are scheduled for repair as soon as possible.
While sometimes reported as potholes, City crews also pave an average of 20 utility cuts on Saskatoon roads each day following a similar priority for repair. A utility cut is a straight-edged break in the pavement from an excavation to access underground water and sewer pipes. During the cold months, when temperatures reach below zero, hot asphalt for paving isn’t an option and utility cuts from water main breaks or other emergency repairs are maintained with graders until they can be paved.
“Our utility cut patching crews have already repaired 642 locations this season,” says Hyde. “However, with ongoing construction in Saskatoon through summer, it can feel like there’s a new utility cut added to our commute for every one that is repaired. We want to thank everyone for their patience and cooperation during the various phases of repair for both potholes and utility cuts.”
Residents are encouraged to use the City’s Report-A-Pothole Map to report potholes and to consult the Utility Cuts and Repair Schedule both found at saskatoon.ca/BetterRoads. Emergency road repairs can be reported by calling Public Works Customer Service at 306-975-2476.
CITY COUNCIL APPROVES RECREATION AND PARKS MASTER PLAN
July 23, 2015 - 9:50am
- reinvestment in the City’s existing recreation facilities and parks (i.e. Leisure Centres, play structures, park upgrades, paddling pools, etc.);
- potential partnerships around the development of indoor ice facilities including leisure ice; and
- the potential development of a recreation facility.
City Council has approved the City of Saskatoon’s (City) Recreation and Parks Master Plan (Master Plan) to provide an overall framework for guiding the development, delivery, and continuous improvement of recreation and parks programs, services, and facilities now and into the future.
The Master Plan, developed through broad public engagement, will replace the 1995 Public Recreation Policy. It was developed by a diverse team, including consultants and Civic Administration, under the guidance of an internal Project Steering Committee and a Community Feedback Committee with sixteen public representatives from key agencies and sectors in Saskatoon that are involved in and/or impacted by recreation and parks services.
The Master Plan is meant to provide a framework for action regarding recreation and parks, and although focused on the City’s role in service provision, it provides insight and information for the benefit of all related stakeholders.
Included in the Master Plan are 3 overarching goals and 19 intended service outcomes that outline a desired end state that can be achieved through provision of, and participation in, recreation and parks activities.
“Recreation is a cornerstone, not only for healthy individuals, but also for vibrant and complete communities, which contribute to the city’s quality of life, social progress, and economic development,” says Lynne Lacroix, Director of Community Development.
The Master Plan identifies recommendations for programming, service delivery and infrastructure, for both the City and the community for the next 5 to 15 years. Major projects identified that are likely to be assessed for consideration in the near future, include, but are not limited to:
“The City will begin work on an implementation plan, including short-, medium-, and long-term strategies,” explains Lacroix. “The Master Plan will be dynamic throughout time; priorities will shift as new information becomes available. The frameworks and systems outlined in the Master Plan will allow recreation and parks’ stakeholders to adapt as Saskatoon grows and evolves.”
Visit www.saskatoon.ca/recmasterplan for the highlights of the Recreation and Parks Master Plan, to view the plan in its entirety, and for more information on implementation.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
HIGHWAY 11 & 16 CLOVERLEAF OVERPASS REPAIRS PROGRESS TO SECOND PHASE
July 23, 2015 - 9:15am
The City of Saskatoon began necessary repairs on the Highway 16 & 11 overpasses at the Cloverleaf intersection in May. Crews have now completed repairs to the eastbound structure and will begin work on the westbound structure on Friday, July 24.
During the second phase the traffic detour will switch sides while maintaining the current flow of traffic. Therefore, two-way traffic will be accommodated on the eastbound overpass while work is carried out on the westbound structure. Two lanes eastbound and one lane westbound will be maintained.
The work is expected to be complete by late-September. The City thanks drivers for their patience while this necessary work is carried out. For more information visit saskatoon.ca and search “cloverleaf”.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE.
CITY MAKES MONTHLY PASS AT LEISURE CENTRES MORE AFFORDABLE
July 23, 2015 - 8:47am
- Adult: $45 per month; formerly started at $75 for one month
- Youth: $27 per month; formerly started at $45 for one month
- Family: $90 per month; formerly started at $150 for one month
In response to feedback collected from citizens and customers over the past several months, the City of Saskatoon (City) will be lowering the prices for the monthly LeisureCard pass that provides unlimited drop-in access to the six indoor Leisure Centres, the Fitness Circuit & Terry Fox Track, four outdoor pools, and Cosmo skating rink.
“We heard you, Saskatoon,” says Cary Humphrey, Director of Recreation and Sport. “The declining popularity of the former full-year LeisureCard pass, confirmed by our recent research study, was a clear indication that we needed to make a change to this product.”
Beginning September 1, 2015, the monthly LeisureCard prices will be as follows:
“By lowering the prices and simplifying the fee to be one low rate, regardless of how many months you purchase, we anticipate that the new improved LeisureCard will be more attractive to our current, past, and potential customers,” explains Humphrey. “We are reducing the financial barriers to participate in fitness and fun at our Leisure Centres.”
Another benefit to the lower rate will be a “Pick Your Perk” program, which will reward long-term LeisureCard customers with enticing bonuses at Leisure Centres and other civic programs and services. The anticipated launch date for the new reward program is January 2016.
In addition to reduced LeisureCard prices, prices on Bulk Tickets will be reduced to $75.00 for an adult 10 pack of single admission tickets; rates are also available for youth and families. The general drop-in admission prices of $9.80 for adults, $5.90 for youth, and $19.60 for families will be frozen at current rates until 2018.
Eligible low-income residents in Saskatoon may continue to participate in select leisure programs at no cost with the City’s Leisure Access Program.
“The City has a role to ensure recreation is accessible to the public by providing programs and services that are affordable to the broadest range of residents,” says Humphrey.
Current LeisureCard customers can call, email, or visit any of the six Leisure Centres (www.saskatoon.ca/leisurecentres) to see how the lower prices affect their current pass and to learn about their options.
Visit www.saskatoon.ca/admissions for Leisure Centre admission options, including LeisureCards and other special promotions.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
DAILY ROAD REPORT, JULY 24
July 23, 2015 - 8:42am
NEW
HWY 11/16 WB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the EB overpass.
Start: July 24, 7:00 a.m. End: Tentative - August 31, 5:00 p.m.
20TH ST W WB CLOSED FROM AVE G S TO AVE H S
(Streetscaping)
Two-way traffic will be maintained in the EB lanes.
Start: July 24, 7:00 a.m. End: July 31, 5:00 p.m.
ATTRIDGE DR WB CURB (OUTSIDE) LANE CLOSED FROM CENTRAL AVE TO CIRCLE DR E
(Jersey barrier installation)
Start: July 24, 9:00 a.m. End: July 24, 3:00 p.m.
8TH ST E WB CURB (OUTSIDE) & CENTRE LANE CLOSED FROM GARRISON CRES TO LOUISE AVE
(Patch Paving)
Start: July 24, 9:00 a.m. End: July 24, 11:00 a.m.
NIGHT WORK: 22ND ST EB OFF RAMP TO CIRCLE DR SB CLOSED
(Resurfacing)
Use Diefenbaker Dr > Fairlight Dr > Fairmont Dr > Clancy Dr
Start: July 24, 7:00 p.m. End: July 25, 6:00 a.m.
ONGOING
1ST AVE S NB CURB (OUTSIDE) LANE CLOSED BETWEEN 20TH ST E TO 21ST ST E
(Sidewalk work)
Start: July 22, 7:00 a.m. End: July 24, 5:00 p.m.
CENTRAL AVE CLOSED BETWEEN GARVIE RD & AGRA RD
(Force main installation)
Start: July 18, 7:00 a.m. End: August 15, 5:00 p.m.
IDYLWYLD DR N/HIGHWAY 16 NB & SB LANE RESTRICTIONS FROM 51ST ST E TO MARQUIS DR W
(Hwy 16 flyover repair)
Start: July 13, 9:00 a.m. End: September 11, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE and like Saskatoon City News on Facebook.
FITNESS CIRCUIT & TERRY FOX TRACK REOPENED TO THE PUBLIC
July 23, 2015 - 7:11am
The Fitness Circuit & Terry Fox Track, located inside of the SaskTel Sports Centre (150 Nelson Road), has now reopened to the public. The facility features a two-lane 356 metre indoor walking and jogging track and adjacent fitness centre with easy-to-use, circuit-style resistance machines designed to provide an efficient, effective, and safe total body workout in minutes.
The SaskTel Sports Centre was designated as an Emergency Evacuation site to shelter evacuees from northern Saskatchewan who had been displaced by the wildfires. Now that the evacuees have returned home, the facility has resumed regular operations.
The City of Saskatoon sincerely thanks the public for their understanding and support during this time, and hopes to see you at the Fitness Circuit & Terry Fox Track again soon!
For hours of operation and drop-in admission rates, please visit www.saskatoon.ca/terryfoxtrack.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
GEORGE WARD OUTDOOR POOL 50TH ANNIVERSARY CELEBRATION ON SUNDAY, JULY 26, 2015
July 23, 2015 - 2:46am
The City of Saskatoon invites the public to George Ward Outdoor Pool (1915 5th Street East) on Sunday, July 26, 2015, between 2 p.m. and 5 p.m. to celebrate the facility’s 50th anniversary. The facility officially opened its doors to the public in July of 1965.
Come and sign a GIANT card, view the display of George Ward’s past, and meet the lifeguards and staff. There will be lifejacket fittings, games, swimming, and lots of family fun!
George Ward Outdoor Pool 50th Anniversary Celebration - Sunday, July 26, 2015
11 a.m. to 7 p.m.: Public Swim
2 p.m. to 5 p.m.: Duck Scavenger Hunt
Chalk Drawings
Giant Slip ‘n’ Slide
Lifejacket Fittings
3 p.m. to 4 p.m.: Cake
4 p.m. to 5 p.m.: Swim to Survive Challenge
Regular admission rates to the pool still apply.
For more information on George Ward or any pools, visit saskatoon.ca/outdoorpools.
For more City of Saskatoon Public Service Announcements, News Releases, Traffic Detours and Service Alerts, visit www.saskatoon.ca or connect with the City of Saskatoon on Twitter and Facebook.
ACCESS TO CROCUS PRAIRIE PARK VIA CENTRAL AVENUE TEMPORARILY CLOSED
July 23, 2015 - 2:36am
The City of Saskatoon is currently installing a sanitary force main and preparing to construct a new roadway on Central Avenue. To accommodate the current phase of construction, Central Avenue is closed in both directions between Garvie Road and Agra Road. The force main will move sanitary sewage from Attridge Drive to the Aspen Ridge lift station.
As a result of construction, access to the Meewasin Trail at Crocus Prairie Park via Central Avenue is temporarily closed. The City asks drivers not to enter the construction zone to access the park. Citizens can continue to access the park via the trails at Sutherland Beach.
Construction on this section of Central Avenue is expected to be complete by the end of August, weather permitting.
The City thanks everyone for their patience while this necessary work is carried out.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE.
DAILY ROAD REPORT, JULY 23
July 22, 2015 - 9:02am
NEW
ATTRIDGE DR WB CURB (OUTSIDE) LANE CLOSED FROM CENTRAL AVE TO CIRCLE DR E
(Jersey barrier installation)
Start: July 23, 9:00 a.m. End: July 23, 3:00 p.m.
NIGHT WORK: CIRCLE DR NB ON RAMP TO 22ND ST W CLOSED
(Resurfacing)
Use Laurier Exit
Start: July 23, 7:00 p.m. End: July 24, 6:00 a.m.
ONGOING
1ST AVE S NB CURB (OUTSIDE) LANE CLOSED BETWEEN 20TH ST E TO 21ST ST E
(Sidewalk work)
Start: July 22, 7:00 a.m. End: July 24, 5:00 p.m.
IDYLWYLD DR S NB & SB MEDIAN LANES CLOSED ON 8TH ST E OVERPASS
(Guardrail repair)
Start: July 21, 9:00 a.m. End: July 23, 5:00 p.m.
CENTRAL AVE CLOSED BETWEEN GARVIE RD & AGRA RD
(Force main installation)
Start: July 18, 7:00 a.m. End: August 15, 5:00 p.m.
IDYLWYLD DR N/HIGHWAY 16 NB & SB LANE RESTRICTIONS FROM 51ST ST E TO MARQUIS DR W
(Hwy 16 flyover repair)
Start: July 13, 9:00 a.m. End: September 11, 5:00 p.m.
20TH ST W CLOSED FROM AVE G S TO AVE H S INCLUDING AVE H INTERSECTION
(Streetscaping)
Start: July 6, 7:00 a.m. End: July 23, 5:00 p.m.
HWY 11/16 EB OVERPASS CLOSED AT CLOVERLEAF INTERSECTION
(Overpass repair)
Two EB lanes and one WB lane of traffic will be maintained on the WB overpass.
Start: May 18, 7:00 a.m. End: Tentative - August 7, 5:00 p.m.
UNIVERSITY BRIDGE CLOSED BETWEEN SPADINA CRES & COLLEGE DR
(Bridge Repairs)
Start: May 3, 7:00 a.m. End: August 31, 6:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
Slow down, pay attention and respect work zones. Watch for pedestrians and work crews, and for everyone’s safety, please obey all detours, signs and barriers.
Know before you go! Plan your route around road work by checking our Road Restrictions and Construction Projects interactive map. Find traffic detour information and subscribe to Traffic Detour Service Alerts at saskatoon.ca/service-alerts. You can also follow us on Twitter @YXEServiceAlert and with #betterroadsYXE.
DUTCH ELM DISEASE IDENTIFIED IN ONE SASKATOON TREE
July 21, 2015 - 1:16pm
One case of Dutch Elm Disease (DED) has been confirmed in Saskatoon after an Elm sample sent in to the provincial lab by the City of Saskatoon’s Pest Management staff, came back positive.
In accordance with the City’s DED Response Plan, which requires immediate removal of all positive trees, crews today began removing the infected tree located in the Queen Elizabeth neighbourhood. Also in accordance with the City’s DED Response Plan, inspectors will follow up and search Queen Elizabeth neighbourhood yards in efforts to pinpoint a source.
Saskatoon’s DED Response Plan requires:
-Immediate removal of all positive trees
-Disposal of infected trees at City of Saskatoon landfill
-Sampling of adjacent trees
-Surveillance and testing of private and public trees in the surrounding area with an intensive search for elm material and other sources of infection
-Place five additional elm bark beetle adult pheromone traps in the area to monitor bark beetle populations
“Dutch Elm Disease is a serious disease of the American elm,” says Darren Crilly, Director of Parks. “The disease was introduced into North America in the 1930s, and has wiped out millions of elms across Canada and the United States. Dutch Elm Disease has been present in Saskatchewan since the 1980s and Saskatoon remained free of it, until now.”
American elm trees with DED may start showing symptoms as early as the month of June. Typically, the leaves will start to wilt and turn yellow, then curl and turn brown. Residents who start to notice any of these symptoms, are encouraged to call City of Saskatoon Pest Management at 306-975-3300.
Residents can help prevent DED by:
-Not pruning elms during provincial pruning ban (April 1 to August 31)
-Not storing or transporting any Elm firewood (Provincial regulations prohibit the storing or transporting of Elm firewood)
-Dispose of all Elm wood at the City Landfill
More information on DED, including pruning deadline information, is available at saskatoon.ca