22ND ST W EB MEDIAN LANE CLOSED FROM AVE B S TO AVE B S
(CCTV inspections)
Start: July 17, 4:00 a.m. End: July 17, 5:00 a.m.
20TH ST W EB LANES CLOSED AT AVE B S
(CCTV Inspections)
Start: July 17, 4:00 a.m. End: July 17, 5:00 a.m.
22ND ST E EB CURBLANE CLOSED FROM 3RD AVE S TO 4TH AVE S
(Crane lift)
Start: July 17, 6:00 a.m. End: July 17, 7:30 a.m.
BOYCHUK DR WB LANES CLOSED AT MCMASTER CRES
(Roadway patching)
Two-way traffic will be maintained in the EB lanes
Start: July 17, 7:00 a.m. End: July 17, 3:00 p.m.
33RD ST E WB CURB LANE CLOSED FROM QUEBEC AVE TO ONTARIO AVE
(Pedestrian ramp replacement)
Start: July 17, 7:00 a.m. End: July 18, 4:30 p.m.
BOYCHUK DR SB LANES CLOSED FROM AULD CRES TO LAURENTIAN DR
(Roadway patching)
Two-way traffic will be maintained in NB lanes
Start: July 17, 8:00 a.m. End: July 17, 4:00 p.m.
8TH ST E WB MEDIAN LANE CLOSED FROM BOYCHUK DR TO MCKERCHER DR
(Stump grinding)
Start: July 17, 9:00 a.m. End: July 17, 6:30 p.m.
33RD ST E WB CURB LANE CLOSED FROM ONTARIO AVE TO ALBERT AVE
(Pedestrian ramp replacement)
Start: July 17, 9:00 a.m. End: July 18, 4:30 p.m.
CLARENCE AVE S NB & SB CURB LANES CLOSED AT CIRCLE DR S
(Bridge deck work)
Closure will be set daily from 9:00 a.m. to 3:00 p.m.
Start: July 17, 9:00 a.m. End: July 19, 3:00 p.m.
33RD ST W EB CURB LANE CLOSED AT EDMONTON AVE
(Pedestrian ramp replacement)
Start: July 17, 9:00 a.m. End: July 19, 5:00 p.m.
NIGHTWORK
CIRCLE DR W ROAD CLOSED AT 33RD ST W
(Deck washing)
Circle Dr fully closed over 33rd St. Use 33rd St exit ramp to continue through.
Start: July 17, 7:00 p.m. End: July 18, 6:00 a.m.
IDYLWYLD DR N NB CURB LANE CLOSED AT TAYLOR ST E
(Bridge testing)
Start: July 17, 7:00 p.m. End: July 18, 1:00 a.m.
CIRCLE DR W WB LANES CLOSED FROM VENTURE CRES TO 1ST AVE N
(Roadway paving)
Two-way traffic will be maintained in the WB lanes
Start: July 16, 7:00 p.m. End: July 17, 6:00 a.m.
ONGOING
DUNDONALD AVE ROAD CLOSED FROM MOUNTBATTEN ST TO DIEPPE ST
(Catch basin & manhole installations)
Start: June 30, 8:00 a.m. End: July 20, 5:00 p.m.
PRESTON AVE S SB LANES CLOSED FROM 14TH ST E TO MAIN ST
(Roadway paving)
Start: June 26, 7:00 a.m. End: July 29, 5:00 p.m.
BUTE ST ROAD CLOSED FROM BROADWAY AVE TO WILLIAM AVE
(Weaver Park storm sewer upgrades)
Broadway Ave intersection at Brute St closed
Start: July 6, 7:00 a.m. End: September 9, 5:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM OSLER ST TO COLLEGE DR
(Water main upgrades)
Start: July 10, 7:00 a.m. End: September 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.