NEW
No new projects are scheduled to start on Priority 1 streets on this date.
NIGHTWORK
HIGHWAY 16 WB FROM ZIMMERMAN RD TO CIRCLE DR E
(Ministry of Highways Paving)
Access to Boychuk Dr will be maintained
Start: May 13, 7:00 p.m. End: June 14, 7:00 a.m.
HIGHWAY 16 EB FROM CIRCLE DR E TO ZIMMERMAN RD
(Ministry of Highways Paving)
Access to Boychuk Dr will be maintained
Start: May 15, 7:00 p.m. End: June 14, 7:00 a.m.
ONGOING
IDYLWYLD DR N SB MEDIAN LANE CLOSED AT 8TH ST E
(Bridge repair)
Start: May 17, 9:00 a.m. End: May 19, 3:00 p.m.
CUMBERLAND AVE S ROAD CLOSED FROM RUTH ST E TO ADELAIDE ST E
(Connection repair work)
Start: May 18, 7:30 a.m. End: May 19, 8:30 p.m.
22ND ST E WB CURB LANE CLOSED FROM 3RD AVE S TO 4TH AVE S
(Infrastructure upgrades)
Start: May 15, 6:30 a.m. End: May 22, 5:00 p.m.
PRESTON AVE S SB LANES CLOSED FROM 14TH ST E TO MAIN ST
(Concrete replacement)
Two-way traffic will be maintained in the NB lanes
Start: May 8, 7:00 a.m. End: May 22, 5:00 p.m.
NEAULT RD SPEED REDUCED FROM 22ND ST W TO 33RD ST W
(Topsoil stripping)
Start: November 19, 9:00 a.m. End: June 2, 4:00 p.m.
CIRCLE DR E WB LANES CLOSED FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-Way traffic will be maintained across the Bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM COLONY ST TO AIRD ST
(Water main work)
Start: May 18, 7:00 a.m. End: June 23, 7:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM TEMPERANCE ST TO UNIVERSITY DR
(Construction)
Start: May 1, 7:00 a.m. End: June 25, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.