COLLEGE DR EB CURB CLOSED FROM CLARENCE AVE N TO BOTTOMLEY AVE N
(Light pole replacement)
Start: May 13, 6:00 a.m. End: May 13, 1:00 p.m.
51ST ST E ROAD CLOSED FROM MILLAR AVE TO WARMAN RD
(Railway track repair)
Start: May 13, 7:00 a.m. End: May 14, 7:00 p.m.
TAYLOR ST E WB CURB AND CENTER LANES CLOSED FROM CIRCLE DR E TO ARLINGTON AVE
(Sewer lining)
Start: May 13, 7:00 a.m. End: May 13, 7:00 p.m.
33RD ST W ROAD CLOSED FROM AVE P S TO VALENS DR
(Catch basin replacements)
Start: May 13, 9:00 a.m. End: May 13, 5:00 p.m.
NIGHTWORK
LAURIER DR EB & WB MEDIAN LANES CLOSED FROM CONFEDERATION DR TO DIEFENBAKER DR
(Durable line marking installation)
Start: May 12, 7:00 p.m. End: May 13, 5:00 a.m.
CONFEDERATION DR SB MEDIAN & CENTRE LANES CLOSED & NB CURB LANE CLOSED FROM 22ND ST W TO LAURIER DR
(Durable line marking installation)
Start: May 12, 7:00 p.m. End: May 13, 5:00 a.m.
HIGHWAY 16 WB LANES CLOSED FROM ZIMMERMAN RD TO CIRCLE DR E CLOSED
(Ministry of Highways Paving)
Detour will be set nightly; two-way traffic will be maintained in the EB lanes; access to Boychuk Dr will be maintained throughout the project
Start: May 13, 7:00 p.m. End: June 14, 7:00 a.m.
CIRCLE DR E EB CURB & NEXT LANE CLOSED FROM ALBERTA AVE TO MILLAR AVE
(Pavement markings)
Start: May 14, 7:00 p.m. End: May 15, 5:00 a.m.
ONGOING
22ND ST E ROAD CLOSED FROM 3RD AVE S TO 4TH AVE S
(Infrastructure upgrades)
Start: May 12, 2:00 p.m. End: May 14, 7:00 p.m.
AVE C N NB LANES CLOSED AT 45TH ST W
(Hydro-vaccing)
Two-way traffic will be maintained in the SB lanes
Start: May 14, 7:00 a.m. End: May 14, 1:00 p.m.
25TH ST E EB LANES CLOSED FROM 1ST AVE N TO 2ND AVE N
(Roadway patching)
Start: May 14, 7:00 a.m. End: May 14, 3:00 p.m.
8TH ST E WB CURB & MEDIAN LANES CLOSED FROM CLARENCE AVE S TO ALBERT AVE
(Roadway patching)
Start: May 14, 9:00 a.m. End: May 14, 5:00 p.m.
33RD ST W ROAD CLOSED FROM VALENS DR TO AVE K N
(Catch basin replacement)
Start: May 14, 8:00 a.m. End: May 14, 5:00 p.m.
22ND ST E ROAD CLOSED FROM 3RD AVE N TO 4TH AVE N
(Infrastructure upgrades)
Start: May 1, 7:00 a.m. End: May 14, 7:00 p.m.
8TH ST E EB LANES CLOSED FROM COY AVE TO LORNE AVE
(Concrete replacement)
Start: May 13, 9:00 a.m. End: May 15, 5:00 p.m.
PRESTON AVE S SB LANES CLOSED FROM 14TH ST E TO MAIN ST
(Concrete replacement)
Two-way traffic will be maintained in the NB lanes
Start: May 8, 7:00 a.m. End: May 27, 5:00 p.m.
NEAULT RD SPEED REDUCED FROM 22ND ST W TO 33RD ST W
(Topsoil stripping)
Start: November 19, 9:00 a.m. End: June 2, 4:00 p.m.
CIRCLE DR E WB LANES CLOSED FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehabilitation)
Two-Way traffic will be maintained across the Bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM TEMPERANCE ST TO UNIVERSITY DR
(Construction)
Start: May 1, 7:00 a.m. End: June 25, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.