Daily Road Report - May 4, 2023
May 3, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
AVE H N ROAD CLOSED FROM WALMER RD TO BEDFORD RD
(Emergency connection replacement)
Start: May 4, 8:00 a.m. End: May 4, 4:30 p.m.
NIGHTWORK
VICTORIA BRIDGE CLOSED FROM 11TH ST E TO SPADINA CRES E
(Bridge cleaning)
Start: May 4, 8:00 p.m. End: May 5, 6:00 a.m.
ONGOING
RUTH ST W WB MEDIAN LANE CLOSED FROM LORNE AVE TO ST GEORGE AVE
(Bridge maintenance)
Start: May 3, 7:00 a.m. End: May 4, 4:30 p.m.
EVERGREEN BLVD ROAD CLOSED FROM KLOPPENBURG CRES TO KLOPPENBURG LINK
(Construction)
Start: May 3, 8:00 a.m. End: May 4, 5:00 p.m.
2ND AVE S SB LANES CLOSED FROM 22ND ST E TO 21ST ST E
(Vault construction)
Start: May 1, 7:00 a.m. End: May 5, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED AT HORNER CRES
(Building construction)
Start: April 17, 7:00 a.m. End: May 5, 5:00 p.m.
22ND ST E ROAD CLOSED FROM 3RD AVE N TO 4TH AVE N
(Infrastructure upgrades)
Start: May 1, 7:00 a.m. End: May 25, 5:00 p.m.
CIRCLE DR E WB FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-Way traffic will be maintained across the Bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM TEMPERANCE ST TO UNIVERSITY DR
(Construction)
Start: May 1, 7:00 a.m. End: June 25, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Avenue H closed between Bedford and Walmer roads on Thursday
May 3, 2023 - 2:15pm
Avenue H will be closed between Bedford and Walmer roads on Thursday, May 4, at 8:00 a.m. for emergency connection replacement work. Detours will be in place guiding motorists around the work zone. This project is expected to take eight hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Bus service to Blades vs. Ice
May 3, 2023 - 2:00pm
- 5:25 p.m.
- 5:45 p.m.
- 6:05 p.m.
- 6:25 p.m.
- 6:45 p.m.
Direct service from the Special Events Stop (23rd Street and 2nd Avenue) to see the Saskatoon Blades take on the Winnipeg Ice in Game 4 of the WHL Playoffs at SaskTel Centre tonight (May 3) at 7:30 p.m., is available at the following times:
Post event drop-off is the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Red Dress Day a day to raise awareness, get involved, support our community
May 3, 2023 - 1:00pm
May 5 is recognized annually as Red Dress Day – a National Day of Awareness for Missing & Murdered Indigenous Women, Girls & Two-Spirit people (identify as having both a feminine and masculine spirit). IWG2S persons are at a greater risk of abuse and violence due to factors beyond their control such as gender, cultural heritage, gender identity, poverty, colonialism.
The first Red Dress Day, held in 2010, was inspired by a national public art installation where red dresses were hung in a variety of places to bring attention to this crisis. Since then, displaying red dresses has been a way to increase awareness. There is a permanent red dress installation in the lobby of Saskatoon City Hall.
The City is helping bring awareness to this issue on May 5 in the following ways:
Red Dress Day Outdoor Installation
7:30 a.m. to 3:30 p.m.
Lawn between City Hall and 24th St E
Red Dress Day Awareness Walk
6:00 to 7:00 p.m.
Starts/ends @ Vimy Memorial Bandstand (in park near 20th St E and Spadina Cres E)
This event is led by community with the support of the City. All are welcome.
Several civic facilities will be lit up red on the evening of May 5 including City Hall, the Prairie Wind art installation beside Remai Modern, and the SaskTel Centre.
Daily Road Report - May 3, 2023
May 2, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
RUTH ST W WB MEDIAN LANE CLOSED FROM LORNE AVE TO ST GEORGE AVE
(Bridge maintenance)
Start: May 3, 7:00 a.m. End: May 4, 4:30 p.m.
EVERGREEN BLVD ROAD CLOSED FROM KLOPPENBURG CRES TO KLOPPENBURG LINK
(Construction)
Start: May 3, 8:00 a.m. End: May 4, 5:00 p.m.
ONGOING
2ND AVE S ROAD CLOSED FROM 22ND ST E TO 21ST ST E
(Vault construction)
Start: May 1, 7:00 a.m. End: May 5, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED AT HORNER CRES
(Building construction)
Start: April 17, 7:00 a.m. End: May 5, 5:00 p.m.
22ND ST E ROAD CLOSED FROM 3RD AVE N TO 4TH AVE N
(Infrastructure upgrades)
Start: May 1, 7:00 a.m. End: May 25, 5:00 p.m.
CIRCLE DR E WB FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-Way traffic will be maintained across the Bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM TEMPERANCE ST TO UNIVERSITY DR
(Construction)
Start: May 1, 7:00 a.m. End: June 25, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Evergreen Boulevard closed between Kloppenburg Crescent and Kloppenburg Link starting Wednesday
May 2, 2023 - 7:00am
Evergreen Boulevard will be closed between Kloppenburg Crescent and Kloppenburg Link starting Wednesday, May 3, at 8:00 a.m. for roadway work. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - May 2, 2023
May 1, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
LORNE AVE SB CURB LANE CLOSED FROM ASH ST E TO RUTH ST E
(Bridge maintenance)
Start: May 2, 7:00 a.m. End: May 2, 1:00 p.m.
RUTH ST W EB MEDIAN LANE CLOSED FROM ST GEORGE AVE TO LORNE AVE
(Bridge maintenance)
Start: May 2, 7:00 a.m. End: May 2, 1:00 p.m.
ONGOING
33RD ST W ROAD CLOSED FROM AVE K N TO AVE L N
(Catch basin & manhole work)
Start: May 1, 9:00 a.m. End: May 2, 4:30 p.m.
2ND AVE S ROAD CLOSED FROM 22ND ST E TO 21ST ST E
(Vault construction)
Start: May 1, 7:00 a.m. End: May 5, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED AT HORNER CRES
(Building construction)
Start: April 17, 7:00 a.m. End: May 5, 5:00 p.m.
22ND ST E ROAD CLOSED FROM 3RD AVE N TO 4TH AVE N
(Infrastructure upgrades)
Start: May 1, 7:00 a.m. End: May 25, 5:00 p.m.
CIRCLE DR E WB FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-Way traffic will be maintained across the Bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM TEMPERANCE ST TO UNIVERSITY DR
(Construction)
Start: May 1, 7:00 a.m. End: June 25, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Help us make a clean sweep! Sweeping crews are coming your way
April 28, 2023 - 4:15pm
Even with snow’s rude interruption of spring last week, City crews are making great progress sweeping up the winter dust on our high traffic streets and business areas. Line painting crews are following behind marking lanes and crosswalks.
Look for yellow No Parking signs on your street through May and June and move your vehicle on sweep day.
Neighbourhood priority streets (10 affected) - May 1-7
We want people to have a street nearby to park on when they move cars for sweep day. We do this by scheduling the neighbourhood over a couple of days or sweeping the main streets (priority streets) first, so they are completed and open for parking on sweep day.
Sweeping on select streets within these 11 neighbourhoods will occur May 1-7: Avalon, Dundonald, Evergreen, Greystone Heights, Grosvenor Park, Hudson Bay, Massey Place, Montgomery Place, North Park, Rosewood and Westview. Watch for No Parking signs and avoid a ticket.
Neighbourhood residential streets – May 8 (7 weeks, weather permitting)
All streets are swept by neighbourhood once cars are moved or towed to a nearby street. Many neighbourhoods are split in half or thirds as they are too big to be swept in one day, and to provide alternate on-street parking spaces.
Watch for yellow No Parking signs on your street to alert you to upcoming sweeping and find your sweep day at saskatoon.ca/sweep. Watch: Your City Residential Street Sweeping.
Daily Road Report - May 1, 2023
April 28, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
22ND ST E ROAD CLOSED FROM 3RD AVE N TO 4TH AVE N
(infrastructure upgrades)
Start: May 1, 7:00 a.m. End: May 25, 5:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM TEMPERANCE ST TO UNIVERSITY DR
(Construction)
Start: May 1, 7:00 a.m. End: June 25, 5:00 p.m.
PRESTON AVE S SB MEDIAN LANE CLOSED FROM 14TH ST E TO MAIN ST
(Catch basin repair)
Start: May 1, 8:00 a.m. End: June 26, 4:00 p.m.
33RD ST W ROAD CLOSED FROM AVE K N TO AVE L N
(Catch basin & manhole work)
Start: May 1, 9:00 a.m. End: May 2, 4:30 p.m.
ONGOING
BALTZAN BLVD ROAD CLOSED AT HORNER CRES
(Building construction)
Start: April 17, 7:00 a.m. End: May 5, 5:00 p.m.
CIRCLE DR E WB LANES CLOSED FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-way traffic will be maintained across the bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - April 29-30, 2023
April 28, 2023 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
33RD ST W ROAD CLOSED FROM AVE K N TO VALENS DR
(Catch basin & manhole replacement)
Start: April 29, 9:00 a.m. End: April 29, 5:00 p.m.
CIRCLE DRIVE EXIT RAMP TO IDYLWYLD DR NB CLOSED FROM CIRCLE DR TO IDYLWYLD DR
(Streetlight pole replacements)
Start: April 30, 6:00 a.m. End: April 30, 10:00 a.m.
CIRCLE DRIVE W WB CURB LANE CLOSED AT IDYLWYLD DRIVE
(Streetlight pole replacement)
Start: April 30, 6:00 a.m. End: April 30, 10:00 a.m.
AIRPORT DR SB & WB CURB LANES CLOSED FROM CARDINAL CRES TO AIRPORT DR
(Streetlight pole replacements)
Start: April 30, 7:00 a.m. End: April 30, 2:00 p.m.
CIRCLE DR W WB CURB LANE CLOSED FROM AIRPORT DR TO CARDINAL PL
(Streetlight pole replacements)
Start: April 30, 7:00 a.m. End: April 30, 2:00 p.m.
CIRCLE DR W WB CURB LANE CLOSED AT AIRPORT DR
(Streetlight pole replacements)
Start: April 30, 7:00 a.m. End: April 30, 2:00 p.m.
22ND ST E WB LANES CLOSED FROM 5TH AVE N TO 4TH AVE N
(Hydro-vac)
Start: April 30, 8:00 a.m. End: April 30, 11:00 a.m.
CIRCLE DR E EB CURB AND MIDDLE LANE CLOSD FROM VENTURE CRES TO MILLAR AVE
(Valve replacement)
Start: April 30, 8:00 a.m. End: April 30, 10:00 p.m.
WARMAN RD NB CURB LANE CLOSED AT CIRCLE DR E
(Streetlight pole replacement)
Start: April 30, 8:30 a.m. End: April 30, 12:30 p.m.
ONGOING
BALTZAN BLVD ROAD CLOSED AT HORNER CRES
(Building construction)
Start: April 17, 7:00 a.m. End: May 5, 5:00 p.m.
CIRCLE DR E WB LANES CLOSED FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-way traffic will be maintained across the bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City to lower flags in recognition of National Day of Mourning
April 28, 2023 - 11:00am
The National Day of Mourning is on Friday, April 28, 2023. In recognition, flags at all City of Saskatoon facilities will fly at half-mast for the day.
The National Day of Mourning, held annually on April 28, was officially recognized by the federal government in 1991 and commemorates workers who have been killed, injured or suffered illness due to workplace-related hazards and incidents.
City-wide Green Cart collection begins Monday, May 1
April 28, 2023 - 10:30am
City-wide green cart collection will begin Monday, May 1 for every household that has rollout garbage and recycling carts. Green cart collection will alternate biweekly with black cart collection, so be sure to check your collection calendar. You can also check your collection dates, print your calendar or set collection reminders by visiting saskatoon.ca/greencart or downloading the Saskatoon Waste Wizard app.
Loraas has finalized an agreement to accept organic waste materials at its facility north of Saskatoon. This latest move is part of the contingency plan that was pre-set in the green cart contract the City has with Green Prairie Environmental (GPE).
Don’t forget to bring in your kitchen pails and start scraping your plates! The green cart can accept all food waste – even bones and egg shells – and most yard waste. More than half of what we throw in the garbage can go into the green cart. By diverting organic waste, we can delay the need for a new landfill, protect our environment, and create something useful – compost.
With collections for the green cart program starting in May, you will also have a new fee called Organics Charge on your utility bill. The monthly average utility fee is $6.73 for the green cart program. It's calculated using a rate of $0.2212 per day, so the amount on your bill may vary depending on the number of days in the month. The monthly fee covers collection of food and yard waste from your home, sorting and processing of material, providing cart maintenance and education, bylaw and program support.
If you are an eligible household and have not received your green cart or kitchen pail, please contact Corporate Revenue at 306-975-2400. For more information about green carts, please visit saskatoon.ca/greencart.
2nd Avenue closed between 21st and 22nd streets starting Monday
April 28, 2023 - 10:00am
2nd Avenue will be closed between 20th and 21st streets starting Monday, May 1, at 7:00 a.m. for underground vault work. 2nd Avenue northbound lanes will be closed between 20th and 21st streets starting Wednesday, April 3 during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take five days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Airport Drive southbound exit to Circle Drive westbound closed on Sunday
April 28, 2023 - 9:00am
The Airport Drive southbound exit bay to Circle Drive westbound will be closed on Sunday, April 30, at 7:00 a.m. for streetlight pole replacement work. Detours will be in place guiding motorists around this work. This project is expected to take seven hours to complete, barring unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Green cart processing facility finalized as part of contingency plan
April 27, 2023 - 11:45am
- Following a public procurement, the City awarded a contract to GPE in September 2020 to provide organics processing services to support the City’s Curbside Organics Program.
- Under the terms of the contract, GPE must be ready to receive materials on May 1, 2023.
- It is the City Administration’s understanding that GPE believed its property - where it planned to process the organic waste - was already within the approved RM zoning because GPE already operates a landfill for solid waste and has for the past nine years at that location south of Saskatoon in the RM of Corman Park.
- The green cart project and contract were progressing for the May 1 start date and it was not until GPE applied to the RM for a routine building permit for its permanent facility (a coverall building) earlier this year that the question of discretionary use arose. The RM administration recommended allowing the discretionary use.
- With the RM Council’s decision to deny GPE’s discretionary use application, the City has an agreement with Loraas to accept and process organics materials on an interim basis starting on Monday while discussions progress with GPE on an alternate plan to fulfill their requirements under the contract.
- With the materials going to Loraas, there is no change to the type of materials that will be accepted and therefore, this plan is still in alignment to meet the City’s waste diversion targets.
- Residents should know that any extra cost of the interim contingency plan will be carried by GPE and not the City.
- The City continues to prepare for the launch of the program next week and collections will not be affected by this RM Council decision.
- All eligible households will have their green carts by the end of this week.
While a verbal agreement had been in place for several weeks, Loraas has finalized an agreement to accept organic waste materials at its facility north of Saskatoon in the RM of Corman Park. This latest move is part of the contingency plan that was pre-set in the green cart contract the City has with Green Prairie Environmental (GPE).
Activating the pre-set contingency plan became necessary following the April 24 RM Council decision to deny the discretionary use application for GPE’s property in Corman Park where it already operates a landfill.
“The City has now finalized the contingency plan for green cart processing. Organics materials will be hauled to Loraas for processing on an interim basis as we continue to work with GPE to confirm alternate plans to fulfill their requirements under the contract,” says Angela Gardiner, General Manager of Utilities & Environment. “Residents should know that any extra cost of the contingency plan will be carried by GPE and not the City. Green cart collections will begin Monday as planned.”
Facts about the green cart processing contract:
City-wide green cart collection will begin next Monday, May 1 for every household that has rollout garbage and recycling carts. Green cart collection will alternate biweekly with black cart collection, so be sure to check your collection calendar. You can check your collection dates, print your calendar or set collection reminders by visiting saskatoon.ca/greencart or downloading the Saskatoon Waste Wizard app.
If you are an eligible household and have not received your green cart or kitchen pail, please contact Corporate Revenue at 306-975-2400. For more information about green carts, please visit saskatoon.ca/greencart.
22nd Street closed between 3rd and 4th avenues starting Monday
April 28, 2023 - 8:00am
22nd Street will be closed between 3rd and 4th avenues starting Monday, May 1, at 7:00 a.m. for infrastructure upgrade work. Detours will be in place guiding motorists around the work zone. This project is expected to take 25 days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Circle Drive exit ramp to Idylwyld Drive northbound closed on Sunday
April 28, 2023 - 7:00am
The Circle Drive exit ramp to Idylwyld Drive northbound will be closed on Sunday, April 30 at 6:00 a.m. for street light pole replacement work. The Idylwyld Drive northbound ramp to Circle Drive westbound will also be closed; eastbound access will remain open during this project. Detours will be in place guiding motorists around this work. This project is expected to take four hours to complete, barring unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
33rd Street closed between Avenue K and Valens Drive on Saturday
April 28, 2023 - 6:00am
33rd Street will be closed between Avenue K and Valens Drive on Saturday, April 29, at 8:00 a.m. for catch basin repair work. Detours will be in place guiding motorists around this project. This work is expected to take one day to complete, barring any unforeseen circumstances or weather delays.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - April 28, 2023
April 27, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
2ND AVE S ROAD CLOSED FROM 21ST ST E TO 22ND ST E
(Vault roof replacement)
Start: April 28, 7:00 a.m. End: April 28, 7:00 p.m.
33RD ST W EB & WB CLOSED FROM AVE J N TO AVE K N
(Catch basin work)
Start: April 28, 9:00 a.m. End: April 28, 5:00 p.m.
ONGOING
LORNE AVE SB LANES CLOSED FROM EXHIBITION GROUNDS RD TO JASPER AVE
(Water service)
Start: April 25, 7:00 a.m. End: April 28, 6:00 p.m.
BALTZAN BLVD ROAD CLOSED AT HORNER CRES
(Building construction)
Start: April 17, 7:00 a.m. End: May 5, 5:00 p.m.
AVE H S ROAD CLOSED FROM 16TH ST W TO 13TH ST W
(Water main replacement)
Start: April 24, 7:00 a.m. End: May 7, 7:00 p.m.
CIRCLE DR E WB LANES CLOSED FROM ATTRIDGE DR TO WARMAN RD
(Bridge Rehab)
Two-way traffic will be maintained across the bridge. Max Load width is 4.5m
Start: February 28, 6:00 a.m. End: June 10, 7:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 17, 2022
October 14, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
KONIHOWSKI RD EB & SB MEDIAN LANES CLOSED AT MCWILLIE AVE
(Concrete)
Start: October 17, 7:00 a.m. End: October 19, 5:00 p.m.
2ND AVE S ROAD CLOSED FROM 19TH ST E TO 20TH ST E
(Roadway paving)
Start: October 17, 7:00 a.m. End: October 19, 5:00 p.m.
25TH ST E EB CURB LANE CLOSED FROM 3RD AVE N TO 5TH AVE N
(Stump removal)
Start: October 17, 9:00 a.m. End: October 17, 2:00 p.m.
CENTRAL AVE NB & SB CENTRE LANES CLOSED FROM 108TH ST TO 109TH ST W
(Sanitary sewer lining)
Start: October 17, 9:00 a.m. End: October 17, 3:00 p.m.
LENORE DR EB MEDIAN LANE CLOSED FROM CYPRESS CRT TO REDBERRY RD
(Sewer lining)
Start: October 17, 9:00 a.m. End: October 17, 3:00 p.m.
25TH ST E EB CURB LANE CLOSED FROM 1ST AVE N TO 2ND AVE N
(Stump removal)
Start: October 17, 10:30 a.m. End: October 17, 12:30 p.m.
ONGOING
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
21ST ST E ROAD CLOSED FROM 1ST AVE S TO 2ND AVE S
(Road resurfacing)
Start: October 11, 7:00 a.m. End: October 17, 4:30 p.m.
TAYLOR ST E ROAD CLOSED AT ROSEWOOD GATE N
(Road construction)
Start: October 12, 7:00 a.m. End: October 19, 5:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: September 1, 7:00 a.m. End: October 21, 5:00 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot work)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB CURB & PARKING LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 7, 7:00 p.m. End: December 31, 4:30 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - October 15-16, 2022
October 14, 2022 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
25TH ST E WB CURBLANE CLOSED FROM SPADINA CRES E TO 4TH AVE N
(Tree stump removal)
Start: October 15, 7:00 a.m. End: October 15, 3:00 p.m.
CIRCLE DR E EB MEDIAN & LEFT TURN LANE CLOSED AT 1ST AVE N
(Sewer lining)
Start: October 15, 7:00 a.m. End: October 15, 5:00 p.m.
CIRCLE DR E WB CURB LANE CLOSED FROM NORTHRIDGE DR TO AVE C N
(Cable pull)
Intersections will remain open
Start: October 15, 7:00 a.m. End: October 16, 5:00 p.m.
BROADWAY AVE NB & SB TRAFFIC SQUEEZED OVER FROM CASCADE ST TO BUTE ST
(Sewer lining)
Start: October 15, 8:00 a.m. End: October 15, 6:00 p.m.
8TH ST E EB LANES CLOSED; WB MEDIAN & CURB LANES CLOSED FROM DUFFERIN AVE TO LANSDOWNE AVE
(Connection replacement)
Start: October 15, 8:00 a.m. End: October 16, 5:00 p.m.
8TH ST E VARIOUS SINGLE LANE CLOSURES AT EMERSON AVE
(Groundwater monitoring)
Start: October 15, 9:00 a.m. End: October 15, 5:00 p.m.
ATTRIDGE DR NB EXIT RAMP CLOSED AT CIRCLE DR E
(Pole replacement)
Start: October 16, 7:00 a.m. End: October 16, 9:00 a.m.
25TH ST E WB CURB LANE CLOSED FROM 5TH AVE N TO 2ND AVE N
(Tree stump removal)
Start: October 16, 7:00 a.m. End: October 16, 12:00 p.m.
ATTRIDGE DR WB SHOULDER CLOSED AT CIRCLE DR E
(Pole replacement)
Start: October 16, 7:00 a.m. End: October 16, 2:00 p.m.
8TH ST E EB CURB & CENTRE LANE CLOSED FROM MCKERCHER DR TO BOYCHUK DR
(Roadway patching)
Start: October 16, 7:00 a.m. End: October 16, 3:00 p.m.
CENTRAL AVE ROAD CLOSED FROM 108TH ST TO 109TH ST W
(Roadway patching)
Start: October 16, 7:00 a.m. End: October 16, 3:00 p.m.
BROADWAY AVE NB & SB MEDIAN LANES CLOSED FROM 3RD ST E TO 4TH ST E
(Roadway patching)
Start: October 16, 9:00 a.m. End: October 16, 3:00 p.m.
ONGOING
MCORMOND DRIVE NB LANES CLOSED FROM FEHEREGYHAZI TO ASPEN RIDGE ST
(Hydrant Repair)
Two-way traffic will be maintained in the SB lanes
Start: October 14, 8:00 a.m. End: October 15, 4:00 p.m.
21ST ST E ROAD CLOSED FROM 1ST AVE S TO 2ND AVE S
(Road resurfacing)
Start: October 11, 7:00 a.m. End: October 17, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
TAYLOR ST E ROAD CLOSED AT ROSEWOOD GATE N
(Road construction)
Start: October 12, 7:00 a.m. End: October 19, 5:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: September 1, 7:00 a.m. End: October 21, 5:00 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot work)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB CURB & PARKING LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 7, 7:00 p.m. End: December 31, 4:30 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
2nd Avenue closed between 19th and 20th streets starting Monday
October 14, 2022 - 4:07am
2nd Avenue will be closed between 19th and 20th streets starting Monday, October 17, at 7:00 a.m. for roadway paving work. Detours will be in place guiding motorists around the work zone. This project is expected to take three days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Central Avenue closed between 108th and 109th streets on Sunday
October 14, 2022 - 3:02am
Central Avenue will be closed between 108th and 109th streets on Sunday, October 16, at 7:00 a.m. for roadway patching work. Detours will be in place guiding motorists around the work zone. This project is expected to take eight hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Attridge Drive exit ramp to Circle Drive northbound closed on Sunday
October 14, 2022 - 2:30am
- The Attridge Drive eastbound exit ramp to Circle Drive northbound will be closed
- Attridge Drive westbound exit ramp lane restrictions to Circle Drive northbound
The Attridge Drive exit ramps to Circle Drive northbound will have lane restrictions and road closures on Sunday, October 16, at 7:00 a.m. for roadway work. Detours will be in place guiding motorists around this detour. This project is expected to take seven hours to complete, barring unforeseen circumstances or weather delays.
Road restrictions in place from 7:00 a.m. to 9:00 a.m.:
Road restrictions in place from 7:00 a.m. to 2:00 p.m.:
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 14, 2022
October 13, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
2ND AVE N NB PARKING LANE CLOSED FROM 26TH ST E TO QUEEN ST
(Stump removal)
Start: October 14, 7:00 a.m. End: October 14, 11:00 a.m.
MELVILLE ST WB LANES CLOSED FROM PORTAGE AVE TO JASPER AVE S
(Drainage work)
Start: October 14, 8:00 a.m. End: October 14, 5:30 p.m.
MCORMOND DRIVE NB LANES CLOSED FROM FEHEREGYHAZI TO ASPEN RIDGE ST
(Hydrant Repair)
Two-way traffic will be maintained in the SB lanes
Start: October 14, 8:00 a.m. End: October 15, 4:00 p.m.
8TH ST E EB & WB MEDIAN LANES CLOSED FROM EMERSON AVE TO WALPOLE AVE
(Tree stump removal)
Start: October 14, 9:00 a.m. End: October 14, 11:00 a.m.
8TH ST E EB & SB MEDIAN LANES CLOSED FROM WIGGINS AVE N TO EWART AVE
(Stump grinding)
Start: October 14, 9:00 a.m. End: October 14, 11:00 a.m.
22ND ST W EB LANES CLOSED FROM AVE W N TO AVE T N
(Roadway patching)
Start: October 14, 9:00 a.m. End: October 14, 3:00 p.m.
3RD AVE S NB MEDIAN LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Street light replacement)
Start: October 14, 10:00 a.m. End: October 14, 3:00 p.m.
4TH AVE S ROAD CLOSED FROM 21ST ST E TO 20TH ST E
(Vault work)
Start: October 14, 10:30 a.m. End: October 14, 3:00 p.m.
ONGOING
AVE H N ROAD CLOSED AT 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 14, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
TAYLOR ST E ROAD CLOSED AT ROSEWOOD GATE N
(Construction)
Start: October 12, 7:00 a.m. End: October 19, 5:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: September 1, 7:00 a.m. End: October 21, 5:00 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot work)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB CURB & PARKING LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 7, 7:00 p.m. End: December 31, 4:30 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 13, 2022
October 12, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
MELVILLE ST EB LANES CLOSED FROM JASPER AVE TO PORTAGE AVE
(Road construction)
Start: October 13, 7:00 a.m. End: October 13, 5:30 p.m.
ONGOING
SPADINA CRES E SB LANES CLOSED FROM 20TH ST E TO 3RD AVE S
(Road construction)
Start: October 11, 6:00 a.m. End: October 13, 4:30 p.m.
AVE H N ROAD CLOSED AT 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 14, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
TAYLOR ST E ROAD CLOSED AT ROSEWOOD GATE N
(Road construction)
Start: October 12, 7:00 a.m. End: October 19, 5:00 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: September 1, 7:00 a.m. End: October 21, 5:00 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot work)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Road construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB CURB & PARKING LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 7, 7:00 p.m. End: December 31, 4:30 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Zoo animals prepare for cooler temperatures
October 11, 2022 - 1:00pm
Over the next several weeks, visitors to the Saskatoon Forestry Farm Park & Zoo (Zoo) will start to see the Zoo animals preparing for the cooler winter temperatures ahead. Many species including the snow leopard, lynx, bobcats, bison and caribou thrive in cooler temperatures thanks to some very cool natural adaptations.
“Caribou are well adapted to life in cold climates,” says Jeff Mitchell, Zoo Manager. “The herd at the Zoo is already working on developing their dense undercoat made up of ultra-fine fur and a longer overcoat of hollow guard hairs that will keep them warm throughout the winter. Caribou also have large, sharp hooves that act like snowshoes allowing them to walk on top of the snow.”
Other animals like the grizzly bears and prairie dogs, are getting ready to sleep away the cold winter days.
“Mistaya and Koda have started making their beds so to speak,” says Mitchell. “You might see the bears combing through the extra straw and leaves the zookeepers have placed throughout their habitat. Mistaya and Koda like to carefully select each leaf and piece of straw, only taking the best of the best back to their den to make their bed.”
Dingoes Maple and Euci will soon be off-exhibit as the cool weather settles in. While the dingoes love to play in the snow for brief periods of time, they will be spending most of their time in their indoor habitat in favour of warmer temperatures.
A reminder to purchase your 2023 Zoo Season Passes before December 31, 2022 to receive 2022 rates. Zoo Season Passes are available for purchase at the Saskatoon Forestry Farm Park & Zoo or any Leisure Centre.
The Zoo is open daily from 10 a.m. to 4 p.m., visit saskatoon.ca/zoo for more information or to plan your next visit.
Daily Road Report - October 12, 2022
October 11, 2022 - 2:18am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
SPADINA CRES E ROAD CLOSED FROM 2ND AVE N TO 3RD AVE S
(Crane lift)
Start: October 12, 5:00 a.m. End: October 12, 11:00 a.m.
DUNDONALD AVE ROAD CLOSED FROM CAEN ST TO DIEPPE ST
(Drainage improvements)
Start: October 12, 7:00 a.m. End: October 12, 5:00 p.m.
TAYLOR ST E ROAD CLOSED AT ROSEWOOD GATE N
(Road construction)
Start: October 12, 7:00 a.m. End: October 19, 5:00 p.m.
MELVILLE ST WB LANES CLOSED FROM JASPER AVE S TO LORNE AVE
(Drainage)
Start: October 12, 8:00 a.m. End: October 12, 4:30 p.m.
PRESTON AVE S NB MEDIAN LANE CLOSED FROM TAYLOR ST E TO 8TH ST E
(Manhole inspections)
Start: October 12, 8:00 a.m. End: October 12, 4:30 p.m.
COLLEGE DR EB CURB LANE CLOSED AT CIRCLE DR E
(Pole replacement)
Start: October 12, 9:00 a.m. End: October 12, 10:00 a.m.
25TH ST E WB MEDIAN LANE & LEFT TURN LANE CLOSED FROM 6TH AVE N TO 5TH AVE N
(Fibre optic install)
Start: October 12, 9:00 a.m. End: October 12, 3:00 p.m.
SPADINA CRES E NB LANE CLOSED FROM QUEEN ST TO 33RD ST E
(Electrical work)
Start: October 12, 9:00 a.m. End: October 12, 3:00 p.m.
22ND ST W EB & WB MEDIAN LANES CLOSED FROM AVE D N TO AVE E N
(Curb repairs)
Start: October 12, 9:00 a.m. End: October 12, 4:00 p.m.
ONGOING
SPADINA CRES E SB LANE CLOSED FROM 20TH ST E TO 3RD AVE S
(Construction)
Start: October 11, 6:00 a.m. End: October 13, 4:30 p.m.
AVE H N ROAD CLOSED AT 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 14, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
21ST ST E ROAD CLOSED FROM 1ST AVE S TO 2ND AVE S
(Road resurfacing)
Start: October 11, 7:00 a.m. End: October 17, 4:30 p.m.
NELSON RD EB CURB LANE CLOSED FROM HEATH AVE TO HEAL AVE
(Material laydown)
Start: September 1, 7:00 a.m. End: October 21, 5:00 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot work)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
4TH AVE S NB CURB & PARKING LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 7, 7:00 p.m. End: December 31, 4:30 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 11, 2022
October 7, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
SPADINA CRES E SB LANES CLOSED FROM 20TH ST E TO 3RD AVE S
(Construction)
Start: October 11, 6:00 a.m. End: October 13, 4:30 p.m.
BALTZAN BLVD ROAD CLOSED AT MCORMOND DR
(Roadway patching)
Start: October 11, 7:00 a.m. End: October 11, 3:00 p.m.
8TH ST E VARIOUS EB & WB SINGLE LANE CLOSURES AT ACADIA DR
(Environmental monitoring)
Start: October 11, 9:00 a.m. End: October 11, 2:00 p.m.
3RD AVE S NB MEDIAN LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Street light replacement)
Start: October 11, 9:00 a.m. End: October 11, 3:00 p.m.
MELVILLE ST EB LANES CLOSED FROM LORNE AVE TO JASPER AVE
(Drainage improvements)
Start: October 11, 9:00 a.m. End: October 11, 5:30 p.m.
CIRCLE DR E WB SHOULDER CLOSED FROM WARMAN RD TO MILLAR AVE
(Signal repairs)
Start: October 11, 9:30 a.m. End: October 11, 12:30 p.m.
ONGOING
AVE H N ROAD CLOSED AT 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 14, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB CURB & PARKING LANES CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 7, 7:00 p.m. End: December 31, 4:30 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
New home energy retrofit financing for Saskatoon
October 7, 2022 - 8:15am
Helping Canadians upgrade their homes to be more energy-efficient fights climate change, creates good jobs and helps save on monthly bills.
The Honourable Dan Vandal, Minister of Northern Affairs, Minister for PrairiesCan, and Minister for CanNor, on behalf of the Honourable Jonathan Wilkinson, Minister of Natural Resources, and Mairin Loewen, member of the Board of Directors of the Federation of Canadian Municipalities and councillor at the City of Saskatoon, today announced a $11.1-million investment through the Community Efficiency Financing (CEF) initiative to help implement a home energy retrofit financing program in the City of Saskatoon.
The Saskatoon Home Energy Loan Program is the first Property Assessed Clean Energy (PACE) program in the province, designed to support retrofits for single-family homes by allowing repayment of loans through the property tax system. The program will provide financing for homeowners to undertake a range of measures, including energy efficiency upgrades, renewable energy installations, water conservation measures, electric vehicle (EV) charging stations, and battery storage technology.
The program includes further support for low-income households: waiving its fixed administrative fee, providing certain services and equipment upgrades free of charge, and offering additional rebates. Through its partnership with SaskPower, the city will further support low-income participation in the existing Energy Assistance Program, which offers energy coaching and low-cost upgrades specifically to low-income households. Additionally, the program will encourage Indigenous businesses to participate in the pre-vetted qualified contractor list for the program.
The implementation of the Saskatoon Home Energy Loan Program follows a successful feasibility study, which received a $102,750 grant through the Green Municipal Fund’s (GMF) Community Efficiency Financing initiative to explore various program options and design a PACE residential financing program. The first intake of the loan program was extremely popular and now has a waitlist. The city will consider additional enhancements to the program to better serve homeowners.
The Community Efficiency Financing initiative is offered through the Green Municipal Fund (GMF) delivered by FCM and funded by the Government of Canada. CEF helps communities of all sizes implement innovative local financing programs that directly help homeowners cut their greenhouse gas emissions, make their homes more energy-efficient, comfortable and affordable, while creating local jobs and keeping the local economy moving.
This initiative is one of the ways GMF continues to build on its 20-year record of supporting transformative environmental initiatives at the community level. The Government of Canada has invested $1.65 billion in the GMF since its inception, enabling municipalities to support projects like this that will leverage local resources to drive innovative solutions.
Quotes
“We are working with partners across Saskatchewan to deliver greener buildings and support sustainable economic growth. Today’s announcement with the Federation of Canadian Municipalities will help deliver more efficient and comfortable homes that will lower bills for Canadian families, take action against climate change and create good jobs for workers. The Government of Canada is pleased to support these initiatives.”
The Honourable Jonathan Wilkinson, Minister of Natural Resources
“It’s critically important to have everyone in the climate fight. Municipalities across Canada are doing their part with innovative solutions that create jobs and climate resilience. Green infrastructure investments in Canadian communities will make our air cleaner, our economy stronger, and set us on the path to a net-zero future.”
The Honourable Steven Guilbeault, Minister of Environment and Climate Change
“Families and local governments are taking innovative climate actions in their communities. By investing in programs to help make homes more energy-efficient, we’re creating jobs, fighting climate change and lowering energy bills for families. I want to thank the Federation of Canadian Municipalities and the City of Saskatoon for their innovative approach to fighting climate change and helping families. These are the sort of innovative, locally led climate solutions our government will continue to support.”
The Honourable Dan Vandal, Minister of Northern Affairs, Minister for PrairiesCan, and Minister for CanNor
“Municipalities are on the front lines of climate change and climate action, and communities of all sizes are showing climate leadership at a time when we need it most. The Green Municipal Fund empowers them to get results on the ground. We deliver results with our federal partners – supporting cities like Saskatoon build a greener, more sustainable community, create jobs and helping Canadians make their homes more comfortable and affordable. Together, we are on the path to net-zero.”
Mairin Loewen, member of FCM Board of Directors and councillor, City of Saskatoon
“Saskatoon is the first municipality in Saskatchewan to implement a program like the Home Energy Loan Program. It allows residents to borrow money from the City to make energy efficient retrofits for single-family homes. Whether it goes towards a new furnace, windows, replacing a leaky door, or multiple projects, this program helps citizens save money month-to-month on utility costs, as well as reduce greenhouse gas emissions. This funding will enable us to expand this program, as it was immediately oversubscribed as a pilot project, resulting in a waitlist for residents wanting to make energy efficient improvements to their homes. To address equity, this program allows for the waiving of administrative fees and provides rebates for income-qualified households.”
Charlie Clark, Mayor, City of Saskatoon
Associated links
Adjusted holiday hours & civic services for Thanksgiving Day, Monday, October 10
October 6, 2022 - 9:23am
- Garbage (Black Cart) – Collections as scheduled (No impact on long weekend holiday)
- Recycling (Blue Cart) – Collections as scheduled (No impact on long weekend holiday)
- Organics (Subscription Green Cart) – Collections as scheduled (No impact on long weekend holiday)
- For collection schedules and reminders, get the Saskatoon Waste Wizard app or visit saskatoon.ca/collectioncalendar
- The Landfill is open over the long weekend from 7:30 a.m. to 5:30 p.m.
- Cash transactions are accepted, although Credit and Debit are recommended.
- More information at saskatoon.ca/landfill.
- The compost depots are open for the season and over the long weekend from 9:00 a.m. to 6:00 p.m.(West Depot) and 11:00 a.m. to 5:00 p.m.(East Depot).
- More information at saskatoon.ca/compostdepots.
- Fixed route and Access Transit will operate holiday hours on Monday, October 10.
- Saskatoon Transit OnDemand will not be available.
- Transit Customer Service Centre will be closed for walk-ins but phone lines (306.975.3100) will be open from 9:00 a.m. – 1:00 p.m. and 2:00 p.m. – 6:00 p.m.
- Parking payment will not be required in City-managed pay parking areas on Thanksgiving Day, Monday October 10, 2022.
- Motorists are reminded that all other parking requirements remain in effect, including parking time limits.
- Vehicles will not be released to the public on Monday, October 10, 2022.
- Open for regular business on Tuesday, October 11, 2022.
- Zoo - 10:00 a.m. to 4:00 p.m.
- Forestry Farm Park - 7:30 a.m. to 4:30 p.m.
- Cosmo Civic Centre - CLOSED
- Harry Bailey Aquatic Centre -12:00 p.m. to 9:00 p.m.
- Lakewood Civic Centre - 12:00 p.m. to 9:00 p.m.
- Lawson Civic Centre - 10:00 a.m. to 5:00 p.m.
- Saskatoon Field House - 9:00 a.m. to 5:00 p.m.
- Shaw Centre - 12:00 p.m. to 9:00 p.m.
- Terry Fox Track – CLOSED
- Parent & Tot Skate - 2:30 p.m. to 3:15 p.m.
The City of Saskatoon will have a number of adjusted civic services and hours of operation on Thanksgiving Day, as follows:
CITY HALL
All administrative offices are closed on Monday, October 10. City Hall will reopen Tuesday, October 11, at 8:00 a.m.
ROADWAY DETOURS & CLOSURES
See here for detailed long weekend road restrictions for priority one roadways.
REMAI MODERN
Remai Modern is closed on Monday, October 10.
SASKATOON PUBLIC LIBRARY
All locations will be closed on Monday, October 10.
WASTE COLLECTIONS
LANDFILL
COMPOST DEPOTS
SASKATOON TRANSIT
PAY PARKING
MUNICIPAL IMPOUND LOT
SASKATOON FORESTRY FARM PARK & ZOO
Regular Hours of Operation:
LEISURE CENTRES
Search for drop-in program information including fitness and weight room hours, public swim sessions and fitness programs on Leisure Online at saskatoon.ca/leisureonline.
GOLF COURSES (Holiday Park, Wildwood and Silverwood)
Open regular hours of operation. Dawn to dusk.
Last day of operation for Silverwood Back 9 and Holiday Park Executive 9.
INDOOR RINKS
Cosmo and ACT Arenas
NOTIFYNOW
Residents are encouraged to sign-up to notifynow for timely and targeted public safety messages. Notifynow is a free service. Tell us how to best reach you on your preferred communication device. Visit saskatoon.ca/notifynow for more information.
YXE SERVICE ALERTS
For information and updates on service disruptions such as power or water check saskatoon.ca/servicealerts or follow @yxeservicealert on Twitter.
Adjusted holiday hours & civic services for Thanksgiving Day, Monday, October 10
October 6, 2022 - 4:00pm
The City of Saskatoon will have a number of adjusted civic services and hours of operation on Thanksgiving Day. Wondering what’s open or closed? See full details on the City’s website.
Long Weekend Road Report - October 8-10, 2022
October 6, 2022 - 7:15am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
PRESTON AVE S NB MEDIAN LANE CLOSED FROM EAST DRIVE TO LOUISE ST
(Manhole inspections)
Start: October 8, 8:00 a.m. End: October 8, 4:30 p.m.
4TH AVE S NB CURB LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 8, 8:00 a.m. End: December 31, 4:30 p.m.
PRESTON AVE S NB MEDIAN LANE CLOSED FROM LOUISE ST TO TAYLOR ST E
(Sewer inspection)
Start: October 9, 8:00 a.m. End: October 9, 4:30 p.m.
NIGHTWORK
CIRCLE DR E EB & WB MEDIAN LANES CLOSED AT CIRCLE DR NORTH BRIDGE
(Crossover construction)
Start: October 7, 9:00 p.m. End: October 8, 7:00 a.m.
ONGOING
20TH ST W ROAD CLOSED FROM AVE O S TO AVE P S
(Water main repairs)
Start: October 7, 9:00 a.m. End: October 8, 6:00 p.m.
1ST AVE N ROAD CLOSED FROM DUKE ST TO KING ST
(Paving)
Start: October 7, 7:00 a.m. End: October 9, 5:00 p.m.
AVE H N ROAD CLOSED AT 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 13, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB PARKING LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Vault roof replacement)
Start: September 23, 7:00 a.m. End: December 31, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 7, 2022
October 6, 2022 - 4:45am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
1ST AVE N ROAD CLOSED FROM DUKE ST TO KING ST
(Paving)
Start: October 7, 7:00 a.m. End: October 9, 5:00 p.m.
2ND AVE S SB LANES CLOSED FROM SAUNDERS PL TO SPADINA CRES E
(Tree trimming)
Start: October 7, 8:00 a.m. End: October 7, 3:00 p.m.
CONFEDERATION DR VARIOUS NB & SB LANE CLOSURES FROM 33RD ST W TO GALT CRT
(Environmental monitoring)
Start: October 7, 9:00 a.m. End: October 7, 12:00 p.m.
4TH AVE S ROAD CLOSED FROM 21ST ST E TO 20TH ST E
(Vault work)
Start: October 7, 9:00 a.m. End: October 7, 3:00 p.m.
20TH ST W ROAD CLOSED FROM AVE O S TO AVE P S
(Water main repairs)
Start: October 7, 9:00 a.m. End: October 8, 6:00 p.m.
NIGHTWORK
CIRCLE DR E EB & WB MEDIAN LANES CLOSED AT CIRCLE DR NORTH BRIDGE
(Crossover construction)
Start: October 7, 9:00 p.m. End: October 8, 7:00 a.m.
ONGOING
SPADINA CRES E ROAD CLOSED FROM WINDSOR ST TO PRINCE OF WALES AVE
(Road excavation)
Start: September 6, 7:00 a.m. End: October 7, 4:30 p.m.
1ST AVE N NB & SB TRAFFIC MOVED INTO THE PARKING LANES FROM 26TH ST E TO QUEEN ST
(Water & sewer work)
Start: September 14, 7:00 a.m. End: October 7, 4:30 p.m.
SPADINA CRES E SB PARKING LANE CLOSED FROM 20TH ST E TO BROADWAY AVE
(Vault work)
Start: September 28, 8:00 a.m. End: October 7, 4:30 p.m.
CENTRAL AVE ROAD CLOSED FROM 108TH ST TO 109TH ST W
(Water main repair)
Start: October 5, 9:00 a.m. End: October 7, 5:00 p.m.
BOYCHUK DR ROAD CLOSED FROM LAURENTIAN DR TO AULD CRES
(Sanitary connection repair)
Start: October 6, 8:00 a.m. End: October 7, 6:00 p.m.
2ND AVE S SB LANES CLOSED FROM 22ND ST E TO 20TH ST E
(Sidewalk replacement)
Start: October 3, 7:00 a.m. End: October 9, 5:00 p.m.
AVE H N ROAD CLOSED 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 13, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB PARKING LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Vault roof replacement)
Start: September 23, 7:00 a.m. End: December 31, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City of Saskatoon golf courses scheduled to close for the 2022 season
October 6, 2022 - 1:00pm
- Monday, October 10 - Back 9
- Sunday, October 16 - Front 9
- Sunday, October 23 - driving range
- Monday, October 10 - Executive 9
- Sunday, October 16 - Front 9
- Sunday, October 23 - Back 9 and driving range
- Sunday, October 16 - Front 9
- Sunday, October 23 - Back 9
The City of Saskatoon’s three golf courses (Holiday Park, Silverwood, and Wildwood Golf Courses) are in the process of closing for the season to ensure the maintenance requirements can be completed before winter, and the courses are in good condition for 2023. The City would like to thank all patrons for their support this year.
The last day of operation at each course is as follows:
Silverwood
Holiday Park
Wildwood
All dates are tentative and dependent on weather conditions. Golfers are advised to call the golf course to check playing conditions.
For more information about any of the City’s golf courses please visit saskatoon.ca/golf.
20th Street closed between Avenue O and Avenue P starting Friday
October 6, 2022 - 9:00am
20th Street will be closed between Avenue O and Avenue P starting Friday, October 7, at 9:00 a.m. for connection work. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
4th Avenue closed between 20th and 21st streets on Friday
October 6, 2022 - 8:00am
4th Avenue will be closed between 20th and 21st streets on Friday, October 7, at 9:00 a.m. for crane setup work. Detours will be in place guiding motorists around the work zone. This project is expected to take six hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
1st Avenue closed between Duke and King streets starting Friday
October 6, 2022 - 7:00am
1st Avenue will be closed between Duke and King streets starting Friday, October 7, at 7:00 a.m. for roadway paving work. Detours will be in place guiding motorists around the work zone. This project is expected to take three days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 6, 2022
October 5, 2022 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
BOYCHUK DR ROAD CLOSED FROM LAURENTIAN DR TO AULD CRES
(Sanitary connection repair)
Start: October 6, 8:00 a.m. End: October 7, 6:00 p.m.
CONFEDERATION DR VARIOUS NB & SB LANE CLOSURES FROM GALT CRT TO 33RD ST W
(Environmental monitoring)
Start: October 6, 9:00 a.m. End: October 6, 1:00 p.m.
4TH AVE S ROAD CLOSED FROM 20TH ST E TO 21ST ST E
(Vault work)
Start: October 6, 10:30 a.m. End: October 6, 3:00 p.m.
CIRCLE DR E SB RAMP CURB LANE CLOSED FROM LING ST TO 8TH ST E
(Pole replacements)
Start: October 6, 12:00 p.m. End: October 6, 3:00 p.m.
ONGOING
1ST AVE N ROAD CLOSED FROM KING ST TO QUEEN ST
(Road resurfacing)
Start: October 5, 7:00 a.m. End: October 6, 4:30 p.m.
1ST AVE N ROAD CLOSED FROM 3RD AVE N TO PRINCESS ST
(Water main replacement)
Start: September 1, 7:30 a.m. End: October 6, 4:30 p.m.
SPADINA CRES E ROAD CLOSED FROM WINDSOR ST TO PRINCE OF WALES AVE
(Road excavation)
Start: September 6, 7:00 a.m. End: October 7, 4:30 p.m.
1ST AVE N NB & SB TRAFFIC MOVED INTO THE PARKING LANES FROM 26TH ST E TO QUEEN ST
(Water & sewer work)
Start: September 14, 7:00 a.m. End: October 7, 4:30 p.m.
SPADINA CRES E SB PARKING LANE CLOSED FROM 20TH ST E TO BROADWAY AVE
(Vault work)
Start: September 28, 8:00 a.m. End: October 7, 4:30 p.m.
2ND AVE S SB LANES FROM 22ND ST E TO 20TH ST E
(Sidewalk replacement)
Start: October 3, 7:00 a.m. End: October 9, 5:00 p.m.
AVE H N ROAD CLOSED FROM 31ST ST W TO 31ST ST W
(Water main work)
Start: August 30, 8:00 a.m. End: October 13, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB PARKING LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Vault roof replacement)
Start: September 23, 7:00 a.m. End: December 31, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Boychuk Drive closed between Auld Crescent and Laurentian Drive starting Thursday
October 5, 2022 - 5:05am
Boychuk Drive will be closed between Auld Crescent and Laurentian Drive starting Thursday, October 6, at 8:00 a.m. for sanitary sewer connection repair work. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
4th Avenue closed between 20th and 21st streets on Thursday
October 5, 2022 - 7:00am
4th Avenue will be closed between 20th and 21st streets on Thursday, October 6, at 10:30 a.m. for vault work. Detours will be in place guiding motorists around the work zone. This project is expected to take five hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 5, 2022
October 4, 2022 - 9:14am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
SPADINA CRES E SB LANES CLOSED FROM 20TH ST E TO 3RD AVE S
(Construction)
Start: October 5, 6:00 a.m. End: October 5, 4:00 a.m.
1ST AVE N ROAD CLOSED FROM KING ST TO QUEEN ST
(Road resurfacing)
Start: October 5, 7:00 a.m. End: October 6, 4:30 p.m.
CIRCLE DR E NB CURB LANE CLOSED FROM 14TH ST E TO COLLEGE DR
(Streetlight pole replacements)
Start: October 5, 9:00 a.m. End: October 5, 3:00 p.m.
4TH AVE S ROAD CLOSED FROM 20TH ST E TO 21ST ST E
(Vault Repairs)
Start: October 5, 9:00 a.m. End: October 5, 3:00 p.m.
CENTRAL AVE ROAD CLOSED FROM 108TH ST TO 109TH ST W
(Water main repair)
Start: October 5, 9:00 a.m. End: October 5, 5:00 p.m.
8TH ST E WB LEFT TURN BAY CLOSED AT ACADIA DR
(Water sampling)
Start: October 5, 11:00 a.m. End: October 5, 3:00 p.m.
ONGOING
AVE H N ROAD CLOSED FROM 30TH ST W TO 31ST ST W
(Connection repair)
Start: October 4, 8:00 a.m. End: October 5, 4:30 p.m.
1ST AVE N ROAD CLOSED FROM 3RD AVE N TO PRINCESS ST
(Water main replacement)
Start: September 1, 7:30 a.m. End: October 6, 4:30 p.m.
SPADINA CRES E ROAD CLOSED FROM WINDSOR ST TO PRINCE OF WALES AVE
(Road excavation)
Start: September 6, 7:00 a.m. End: October 7, 4:30 p.m.
1ST AVE N NB & SB TRAFFIC MOVED INTO THE PARKING LANES FROM 26TH ST E TO QUEEN ST
(Water & sewer work)
Start: September 14, 7:00 a.m. End: October 7, 4:30 p.m.
SPADINA CRES E SB PARKING LANE CLOSED FROM 20TH ST E TO BROADWAY AVE
(Vault work)
Start: September 28, 8:00 a.m. End: October 7, 4:30 p.m.
2ND AVE S SB LANES CLOSED FROM 22ND ST E TO 20TH ST E
(Sidewalk replacement)
Start: October 3, 7:00 a.m. End: October 9, 5:00 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB PARKING LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Vault roof replacement)
Start: September 23, 7:00 a.m. End: December 31, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Poetry Downtown a project in collaboration with Downtown Saskatoon launches
October 4, 2022 - 11:00am
- to enhance and move forward with Reconciliation
- to provide opportunities for artistic expression in the city centre
- to inspire the public through poetry
- to connect the work of local poets to the community
The Poetry Downtown project features poems from six local poets displayed on the 3rd Avenue poster directories between 19th Street and 23nd Street in Downtown Saskatoon. The theme of the project is Reconciliation.
Launched at the beginning of October, the project will be on display until May 31, 2023. A Call for Submissions was issued in July of 2022. Selected poets and their poem titles are: Robert Benz: The Colour of Sky, Lisa Bird-Wilson: Beside a Residential School, Lauren Klassen: O’ Canada, Mika Lafond: Unapologetic, Jada Morin: it’s always so sad to see, and Jenny Ryan: Sask..
The goals of the project are:
Poetry Downtown was inspired by a challenge from Parliamentary Poet Laureate of Canada Louise Halfe encouraging municipalities to bring poetry to public places.
“In order to walk or run we must first learn to crawl. It is often the first step toward growth. In Cree, pimitācimo, is in itself a loaded word with multiple beginnings. However, simply translated, it means: we crawl into life with our stories,” explains Halfe.
“Art uses our physicality, spirituality, intellect and emotionality to bring forth our visions. It is expressed through literature in poetry, drama, theatre, dance, music, song and paintings. It is never stagnant. All these enhance and challenge our perspectives, they guide us into the inner center of our being, invite us to grow. These are the visions drawn from the artisan well of the artist. In essence we are all artist. It is simply expressed in multiple ways in all disciplines.”
The public is encouraged to walk along 3rd Avenue and reflect on the poetry. The Poetry Downtown project is a partnership with Downtown Saskatoon.
For more information please visit saskatoon.ca/artsandculture.
City’s first flood mitigation project complete; new park space open
October 4, 2022 - 10:00am
Dozens of residents in Saskatoon’s Haultain and Queen Elizabeth neighbourhoods can rest a little easier knowing there is less of a likelihood of their properties flooding during intense rainfalls. A new dry storm pond in W.W. Ashley District Park, enjoyed as a newly developed park and sports field during dry weather, officially opened today.
The new dry storm pond is the first of nine to be completed under the Flood Control Strategy (FCS) which was approved by City Council in 2018. The second project is underway right now in Churchill Park and will open in fall 2023. In early 2023, construction will start on a dry storm pond in Weaver Park and six more FCS projects will be built between 2024 and 2027. The Government of Canada has contributed $21.6 million towards Saskatoon’s Flood Control Strategy through the Disaster Mitigation and Adaptation Fund.
“Our Government is proud to be contributing to Saskatoon’s Flood Control Strategy,” said the Honourable Dominic LeBlanc, Minister of Intergovernmental Affairs, Infrastructure and Communities. “By investing in disaster mitigation and adaptation, we are safeguarding Saskatonians’ homes and livelihoods against the natural events brought on by climate change and building more resilient Prairie communities.”
“The W.W. Ashley Park Dry Storm Pond has already proven to be a tremendous success,” said Saskatoon Mayor, Charlie Clark. “During a significant rain event this summer, it prevented flooding in an area of the city that historically experiences floods. It also provides accessible walking paths and retains recreational space and green space when not containing storm water. The City has plans for more dry ponds and will continue work on projects in the Flood Control Strategy to help minimize flooding in the highest risk locations in the city. Through continued partnerships, we’re able to deliver better infrastructure to residents that help mitigate damage from natural events.”
“We have a well thought out strategy in place to ensure all of our projects are built and functioning by 2027,” said Russ Munro, Director of Saskatoon Water. “Flooding is never ideal, but I think we were fortunate to witness how this first flood mitigation project actually ended up exceeding our expectations during the rainstorm on June 20th. It demonstrated these projects are a solution when it comes to protecting neighbourhood homes from being devastated by floods.”
Dry storm ponds hold water that would otherwise cause nearby flooding during intense rainfalls. The water flows into storm drains, then through underground pipes into the dry storm pond, where it then flows toward and empties into the South Saskatchewan River.
Once the FCS projects are completed, the City anticipates seeing a substantial decrease in the amount of neighbourhood flooding in the top 10 highest risk areas of Saskatoon.
For more information about the FCS, visit saskatoon.ca/floodplan.
Central Avenue closed between 108th and 109th streets on Wednesday
October 4, 2022 - 10:00am
Central Avenue will be closed between 108th and 109th streets on Wednesday, October 5, at 9:00 a.m. for connection repair work. Detours will be in place guiding motorists around the work zone. This project is expected to take eight hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
4th Avenue closed between 20th and 21st streets on Wednesday
October 4, 2022 - 9:00am
4th Avenue will be closed between 20th and 21st streets on Wednesday, October 5, at 9:00 a.m. for crane setup work. Detours will be in place guiding motorists around the work zone. This project is expected to take six hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
We ‘Witch’ you a healthy and happy Halloween!
October 4, 2022 - 8:00am
The City is excited to announce the return of the leisure facilities Halloween offer, supporting healthy and active children in Saskatoon. Starting Tuesday, October 11, residents can pick up Halloween-themed coupons to hand out to children who come trick or treating at the end of the month.
The coupons are valid from October 31 to November 30, 2022 and provide 20% off general admission for a family, adult (must be accompanied by a child) or youth at any of the Leisure Centres (Cosmo, Lakewood & Lawson Civic Centres, Harry Bailey Aquatic Centre, Saskatoon Field House and Shaw Centre) and indoor rinks (ACT, Archibald, Cosmo and Lions). Admission for our smallest trick or treaters, children under six years of age, is always FREE, year-round!
The coupons will be available to residents for pick up at any of the Leisure Centres on a first come, first serve basis. A maximum of 50 coupons per customer will be given.
Wishes for a healthy and happy Halloween are extended to all residents with a Halloween day only offer. Starting at 3:30 p.m. on Monday, October 31 patrons will be eligible to receive 20% off a Family, Adult or Youth Leisure Centre general admission. Visit saskatoon.ca/healthyhalloween to get your coupon to print or display on your smartphone.
1st Avenue closed between King and Queen streets starting Wednesday
October 4, 2022 - 7:00am
1st Avenue will be closed between Queen and King streets starting Wednesday, October 5, at 7:00 a.m. for roadway work. King Street will be closed between 1st and 2nd avenues during this project. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - October 4, 2022
October 3, 2022 - 9:09am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
VICTORIA AVE SB LANES CLOSED FROM 4TH ST E TO 3RD ST E
(Roadway patching)
Start: October 4, 7:00 a.m. End: October 4, 3:00 p.m.
22ND ST W WB MEDIAN LANE CLOSED FROM AVE Q N TO AVE R N
(Stump removal)
Start: October 4, 9:00 a.m. End: October 4, 3:00 p.m.
ONGOING
IDYLWYLD DR N NB MEDIAN LANE CLOSED FROM CIRCLE DR E TO 45TH ST E
(Guardrail repair)
Start: October 3, 9:00 a.m. End: October 4, 3:00 p.m.
1ST AVE N ROAD CLOSED FROM 24TH ST E TO 25TH ST E
(Paving)
Start: October 3, 9:00 a.m. End: October 4, 4:00 p.m.
DIEFENBAKER DR WB CURB LANE CLOSED FROM DOUGLAS CRES TO FISHER CRES
(Sidewalk work)
Start: August 26, 7:00 a.m. End: October 4, 5:00 p.m.
1ST AVE N ROAD CLOSED FROM 3RD AVE N TO PRINCESS ST
(Water main replacement)
Start: September 1, 7:30 a.m. End: October 6, 4:30 p.m.
SPADINA CRES E ROAD CLOSED FROM WINDSOR ST TO PRINCE OF WALES AVE
(Road excavation)
Start: September 6, 7:00 a.m. End: October 6, 4:30 p.m.
1ST AVE N NB & SB TRAFFIC MOVED INTO THE PARKING LANES FROM 26TH ST E TO QUEEN ST
(Water & sewer work)
Start: September 14, 7:00 a.m. End: October 7, 4:30 p.m.
SPADINA CRES E SB PARKING LANE CLOSED FROM 20TH ST E TO BROADWAY AVE
(Vault work)
Start: September 28, 8:00 a.m. End: October 7, 4:30 p.m.
FAITHFULL AVE SB CURB LANE CLOSED FROM 47TH ST E TO 46TH ST E
(Curb work)
Start: September 27, 8:00 a.m. End: October 17, 4:30 p.m.
MCORMOND DR NB CURB LANE CLOSED FROM MANEK RD TO MCORMOND DR
(Parking lot)
Start: September 26, 7:00 a.m. End: October 22, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO 33RD ST W
(Construction)
Start: October 3, 7:00 a.m. End: November 15, 5:00 p.m.
4TH AVE S NB PARKING LANE CLOSED FROM 20TH ST E TO 21ST ST E
(Vault roof replacement)
Start: September 23, 7:00 a.m. End: December 31, 5:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Avenue H closed between 30th and 31st streets starting Tuesday
October 3, 2022 - 9:00am
Avenue H will be closed between 30th and 31st streets starting Tuesday, October 4, at 8:00 a.m. for water and sewer connection replacement work. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.