Long Weekend Road Report, September 30 to October 2, 2023
September 27, 2023 - 8:00am
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR E NB MEDIAN LANE CLOSED FROM 33RD ST W TO AIRPORT DR
(Asphalt repair)
Start: September 30, 7:00 a.m. End: September 30, 3:00 p.m.
20TH ST W EB LANES CLOSED FROM AVE P S TO AVE H S
(Rock Your Roots)
Start: September 30, 9:00 a.m. End: September 30, 12:30 p.m.
TAYLOR ST W WB LANE CLOSED FROM HERMAN AVE TO ST HENRY AVE
(CIBC Run for the Cure Event)
Start: October 1, 8:00 a.m. End: October 1, 12:00 p.m.
LORNE AVE ROAD CLOSED FROM 3RD ST E TO 4TH ST E
(Valve repair)
Start: October 1, 8:00 a.m. End: October 1, 5:00 p.m.
IDYLWYLD DR N NB RIGHT TURN BAY CLOSED AT CIRCLE DR E
(Sign painting)
Start: October 1, 9:00 a.m. End: October 1, 7:00 p.m.
SPADINA CRES E ROAD CLOSED FROM 2ND AVE S TO 3RD AVE S
(Friends of Fertility Walk)
Start: October 1, 9:00 a.m. End: October 1, 1:00 p.m.
SPADINA CRES E ROAD CLOSED FROM 20TH ST E TO 22ND ST E
(Infrastructure upgrades)
Start: October 2, 7:00 a.m. End: October 8, 5:30 p.m.
BROADWAY AVE INTERSECTION CLOSED AT HILLIARD ST E
(Catch basin lead repairs)
Start: October 2, 8:00 a.m. End: October 2, 4:00 p.m.
NIGHTWORK
VICTORIA BRIDGE CLOSED FROM SPADINA CRES E TO 11TH ST E
(Bridge Washing)
Start: October 1, 6:00 p.m. End: October 2, 4:00 a.m.
ONGOING
2ND AVE S SB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Concrete replacement)
Start: September 25, 7:00 a.m. End: October 1, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
ZIMMERMAN ROAD NB & SB CURB LANES CLOSED FROM MARKET DR TO MEADOWS PKY
(Sidewalk installation)
Start: September 25, 8:00 a.m. End: October 15, 5:00 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Spadina Crescent closed from 20th to 22nd streets on Sunday
September 29, 2023 - 8:00am
Spadina Crescent will be closed from 20th to 22nd streets on Sunday, October 1, starting at 7:00 a.m. for infrastructure upgrade work. Detours will be in place guiding motorists around the work zone. This project is expected to take four hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City of Saskatoon will have adjusted hours & civic services on Monday, October 2
September 27, 2023 - 11:45pm
- Fixed route, OnDemand, Access and the Transit Customer Service Centre will be operating regular service hours on Saturday, September 30 and Monday, October 2.
- Parking payment is required on Saturday, September 30
- Parking payment is required on Monday, October 2
- Motorists are reminded that all parking requirements remain in effect, including parking time limits.
- Vehicles will be released to the public as usual on Saturday, September 30 and on Monday, October 2
- Information on Vehicle Seizures
- Garbage (Black Cart) – Collections as scheduled
- Recycling (Blue Cart) – Collections as scheduled
- Organics (Green Cart) – Collections as scheduled
- For collection schedules and reminders, get the Saskatoon Waste Wizard app or visit saskatoon.ca/collectioncalendar
- The Landfill is open over the long weekend from 7:30 a.m. to 5:30 p.m.
- Cash transactions are accepted, although Credit and Debit are recommended.
- More information at saskatoon.ca/landfill
- The compost depots are open over the long weekend with normal operating hours.
- West Compost Depot – open 7 days a week, 9 a.m. to 6 p.m.
- East Compost Depot – open Thursday to Monday, 11 a.m. to 5 p.m.
- More information at saskatoon.ca/compostdepots
- The cemetery office is closed on Monday, October 2.
- Cemetery grounds are open to the public 8 a.m. to 9 p.m. daily as per usual.
- Zoo – 10 a.m. to 4 p.m.
- Forestry Farm Park - 7:30 a.m. to 4:30 p.m.
- Zoo Gift Shop – 10 a.m. to 4 p.m.
- Cosmo Civic Centre - CLOSED
- Harry Bailey Aquatic Centre Closed for facility upgrade. Learn more at saskatoon.ca/harrybailey
- Lakewood Civic Centre – Saturday (Sept 30) - 12 p.m. to 8 p.m., Monday (Oct 2) - Regular hours of operation.
- Lawson Civic Centre – Saturday (Sept 30) - 10 a.m. to 5 p.m., Monday (Oct 2) – Regular hours of operation.
- Saskatoon Field House – Saturday (Sept 30) - 9 a.m. to 5 p.m., Monday – Regular hours of operation.
- Shaw Centre – Saturday (Sept 30) - 12 p.m. to 6 p.m., Monday (Oct 2) – Regular hours of operation.
- Terry Fox Track– Saturday (Sept 30) - 10 a.m. to 4 p.m., Monday (Oct 2) - Regular hours of operation.
The City of Saskatoon will observe the stat for the National Day for Truth and Reconciliation, on Monday, October 2, 2023.
Civic services and hours of operation will be adjusted as follows:
CITY HALL
All Administrative Offices are closed on Monday, October 2, and will reopen Tuesday, October 3 at 8 a.m.
ROADWAY DETOURS & CLOSURES
Check here for detailed long weekend road restrictions for priority one roadways.
REMAI MODERN
Remai Modern will be closed on Labour Day, Monday, October 2.
SASKATOON PUBLIC LIBRARY
All library locations will be closed on Saturday, September 30.
All library locations will be open on Monday, October 2.
SASKATOON TRANSIT
PAY PARKING
MUNICIPAL IMPOUND LOT
WASTE COLLECTIONS
LANDFILL
COMPOST DEPOTS
WOODLAWN CEMETERY
SASKATOON FORESTRY FARM PARK & ZOO HOURS
Regular Hours of Operation:
LEISURE CENTRES
Search for drop-in program information including fitness and weight room hours, public swim sessions and fitness programs on Leisure Online at saskatoon.ca/leisureonline.
GOLF COURSES
Holiday Park, Silverwood and Wildwood golf courses are open regular hours of operation 8 a.m. to dusk.
NOTIFYNOW
Residents are encouraged to sign-up to notifynow for timely and targeted public safety messages. Notifynow is a free service. Tell us how to best reach you on your preferred communication device. Visit saskatoon.ca/notifynow for more information.
YXE SERVICE ALERTS
For information and updates on service disruptions such as power or water check saskatoon.ca/servicealerts or follow @yxeservicealert on X.
Victoria Bridge closed on Sunday night
September 29, 2023 - 11:00am
Victoria Bridge will be closed on Sunday, October 1, starting at 6:00 p.m. for bridge washing. Detours will be in place guiding motorists around the work zone. The bridge is expected to reopen Monday, October 2, by 4:00 a.m. weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Circle Drive North Bridge construction finishing early; fully reopens Tuesday
September 29, 2023 - 10:00am
- Was a proactive construction project to optimize both the service life and the overall capital life cycle costs
- Started early in 2023 to ensure all the work was completed during one construction season rather than extending the work over two years
- Included asphalt and barrier replacements, drainage improvements, and concrete repairs to the bridge deck, piers and abutments
- Included minor repairs to the pedestrian bridge above Circle Drive North that connects Pembina Place to G.D. Archibald Park
Crews are putting the finishing touches on Saskatoon’s Circle Drive North Bridge, which has been under construction since the beginning of March. All traffic restrictions will be removed by late afternoon Tuesday, October 3, 2023.
“Work progressed well over the past several months, and we are opening the bridge approximately three weeks ahead of schedule and within the $10.5 million budget,” says Todd Grabowski, City of Saskatoon Engineering Manager of Asset Preservation. “We’ve improved the overall life span of the 40-year-old bridge, ensuring it will last for several more decades.”
The Circle Drive North Bridge Rehabilitation project:
The 275-metre-long bridge opened in 1983 at a cost of $11.8 million. In 2005, additional lanes were added on each side of the bridge and in 2007, the pedestrian bridge below opened.
For more information about current and future construction, please visit saskatoon.ca/construction.
Broadway Avenue intersection closed at Hilliard Street on Monday
September 29, 2023 - 9:00am
The intersection at Broadway Avenue and Hilliard Street will be closed on Monday, October 2 starting at 8:00 a.m. for catch basin repairs. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City hosts community events on National Day for Truth & Reconciliation
September 29, 2023 - 7:45am
Tomorrow (September 30) is the National Day for Truth and Reconciliation. The City will respond to the Truth and Reconciliation Commission of Canada's Calls to Action by hosting the following Reconciliation activities open to all Saskatoon residents.
Rock Your Roots Walk for Reconciliation
This walk is one way to honour Residential School Survivors and demonstrate your commitment to making this an inclusive community with equal opportunities for all. Participants are invited to wear an orange shirt. Organizations are invited to carry a banner pledging their commitment to Reconciliation. The walk is family friendly.
The event begins at CUMFI (315 Ave M S) at 10 a.m. and ends at 11:30 a.m. in Victoria Park near the "Where Our Paths Cross" art installation (across the road from 422 Spadina Cres W). Participants are advised to arrive early as the event site is expected to be busy. For timely updates, connect to the Rock Your Roots: Walk for Reconciliation Facebook Event.
Afternoon of free community programming
In response to TRC Calls to Action #66 (deliver programs on reconciliation) and #89 (reduce barriers to sports participation and ensure programming is inclusive of Indigenous peoples), the City will host an afternoon of free programming at Cosmo Civic Centre between 12 p.m. and 4 p.m. Activities include drop-in public skating and cookie decorating as well as Indigenous hoop dancing and fiddling performances.
Spadina Crescent closed between 2nd and 3rd avenues on Sunday
September 29, 2023 - 7:00am
Spadina Crescent will be closed between 2nd and 3rd avenues on Sunday, October 1, starting at 9:00 a.m. for the Friends of Fertility Walk. Detours will be in place guiding motorists around the work zone. This project is expected to take four hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Lorne Avenue closed between 3rd and 4th streets on Sunday
September 29, 2023 - 6:00am
Lorne Avenue will be closed between 3rd and 4th streets on Sunday, October 1, starting at 8:00 a.m. for valve repairs. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Correction: Bus service to Morgan Wallen is Friday night, September 29
September 28, 2023 - 5:30pm
- 5:15 p.m.
- 5:35 p.m.
- 5:55 p.m.
- 6:15 p.m.
- 6:35 p.m.
Direct bus service from the Special Events Stop (23rd Street and 2nd Avenue) to see Morgan Wallen in concert at SaskTel Centre on Friday, September 29 (stated earlier in error as Sunday) at 7:00 p.m., is available at the following times:
Post event drop-off is the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Correction: Bus service to Morgan Wallen is Friday night, September 29
September 28, 2023 - 6:00am
- 5:15 p.m.
- 5:35 p.m.
- 5:55 p.m.
- 6:15 p.m.
- 6:35 p.m.
Direct bus service from the Special Events Stop (23rd Street and 2nd Avenue) to see Morgan Wallen in concert at SaskTel Centre on Friday, September 29 (stated earlier in error as Sunday) at 7:00 p.m., is available at the following times:
Post event drop-off is the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Daily Road Report - September 29, 2023
September 28, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
3RD AVE N SB CURB LANE CLOSED FROM 23RD ST E TO 22ND ST E
(Temporary water line installation)
Start: September 29, 7:00 a.m. End: September 29, 4:30 p.m.
CLARENCE AVE S SB CURB LANE CLOSED FROM 8TH ST E TO 7TH ST E
(Gas line repairs)
Start: September 29, 7:00 a.m. End: September 29, 6:00 p.m.
22ND ST E ROAD CLOSED FROM 3RD AVE N TO 4TH AVE N
(Infrastructure upgrades)
Start: September 29, 9:00 a.m. End: September 29, 10:30 a.m.
CIRCLE DR S WB CURB LANE CLOSED FROM ST HENRY AVE TO SPADINA CRES W
(Construction)
Start: September 29, 9:00 a.m. End: September 29, 3:00 p.m.
ONGOING
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
2ND AVE S SB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Concrete replacement)
Start: September 25, 7:00 a.m. End: October 1, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
ZIMMERMAN RD NB & SB CURB LANES CLOSED FROM MARKET DR TO MEADOWS PKY
(Sidewalk installation)
Start: September 25, 8:00 a.m. End: October 15, 5:00 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Holiday Pay Parking Reminder: National Day for Truth & Reconciliation on Saturday, September 30
September 28, 2023 - 1:00pm
-
Customers are encouraged to use the Parkedin app as a no-touch way to pay for parking.
-
Customers are responsible for entering the correct licence plate information when paying for parking at a FlexParking station or when using the Parkedin app.
-
Parking time limits vary by location. Watch for signs wherever you are parking.
-
If you have reached the posted time limit but need more time in the area, move your vehicle around the corner or across the street.
-
Balances on a parking purchase can be carried forward to another parking space in a new location.
-
Additional parking time can be purchased, but only up to the maximum allowable time posted.
Residents are reminded that payment will be required in City-managed pay parking areas on National Day for Truth & Reconciliation, Saturday, September 30, 2023.
Public parking in the Downtown, Broadway, Riversdale, River Landing and Sutherland areas, as well as streets adjacent to St. Paul’s and Saskatoon City Hospitals, are metered from 9 a.m. to 6 p.m., Monday to Saturday. Payment is not required outside these hours, on Sundays or on statutory holidays (New Year’s Day, Family Day, Good Friday, Victoria Day, Canada Day, Saskatchewan Day, Labour Day, Thanksgiving Day, Remembrance Day and Christmas Day). The National Day for Truth & Reconciliation is not a statutory holiday in Saskatchewan.
Public Pay Parking reminders:
For more information on Public Pay Parking, visit saskatoon.ca/payparking.
City of Saskatoon Bylaw amendments to align with SGI’s new Vehicle Noise Policy
September 28, 2023 - 9:00am
A report to update the City of Saskatoon’s Noise Bylaw, 2003 to align with the Saskatchewan Government Insurance (SGI) Vehicle Noise Policy will be presented to the Standing Policy Committee on Transportation on October 3, 2023.
The proposed update to the Bylaw will enhance enforcement procedures and reduce ambiguity in compliance assessments, extending the ability of police officers to order sound testing of both motorcycles and other motor vehicles, which is an objective method to measure noise levels rather than determining subjectively when noise from motor vehicles is unreasonably loud or excessive.
The proposed update will also include a noise level limit for motor vehicles while placing the noise level limit for motorcycles to the same standard. If approved by City Council, these changes would take effect on January 1, 2024.
“This bylaw alignment with SGI’s policy addresses a longstanding challenge in enforcing noise bylaws, striving to reduce vehicle noise disruptions across our community,” said Nathalie Baudais, Transportation Engineering Manager.
“This initiative reflects our efforts to improve the quality of life and health for people in our community.”
Similar to the SGI Vehicle Noise Policy, police officers would have the ability to issue vehicle inspection tickets, requiring vehicle owners to take their vehicle for inspection to an SGI-certified vehicle inspection station, and complete all necessary repairs as part of SGI’s Unsafe Vehicle Program.
All light vehicles in Saskatchewan, including passenger cars, pickup trucks, minivans, SUVs and motorcycles, must be equal to or quieter than 101.3 dB when tested, based on stationary measurements of exhaust noise. This noise test and policy is consistent with the Society of Automotive Engineers.
For more information on the City of Saskatoon’s Noise Bylaw, visit www.saskatoon.ca/noise-bylaw
Time to Rock Your Roots YXE!
September 28, 2023 - 8:00am
- Walk begins at CUMFI (315 Ave M S)
- Walk ends at Reconciliation Circle in Victoria Park, near the "Where Our Paths Cross" art installation (across the road from 422 Spadina Cres W)
- Following the walk, there will be short program followed by games in the park
It's almost here! Don't miss out on the chance to take part in the 2023 Rock Your Roots Walk for Reconciliation on the National Day for Truth & Reconciliation, Saturday, Sept. 30. Everyone is welcome; it's a family-friendly, no cost event. Wear an orange shirt or “rock your roots” by wearing traditional clothing representing your cultural heritage.
Along the walk route, participants will see cultural performances by: Ashong Family Drummers, Confucius Institute, Magic City Chorus, and Martial Arts Academy. In Victoria Park (where the walk ends), there will be traditional Indigenous dancers and drummers and the Northern Prairie Dancers doing Métis jigging.
Event Details:
Saturday, Sept 30, 2023
10 to 11:30 a.m.
Organizers suggest people plan to arrive early as the event site is expected to be busy. There is an optional pre-walk pancake breakfast outside CUMFI beginning at 8 a.m.
Rock Your Roots is put on by City co-chaired Reconciliation Saskatoon. The intent of this event is to answer the TRC Calls to Action by demonstrating a commitment to Reconciliation, honouring Residential School Survivors, and continuing work towards an inclusive community. The walk has been an annual one in Saskatoon since 2016.
Cynthia Block, Ward 6 Councillor says: “The chapter we’re writing now will be our legacy. I feel like we’re at the precipice of change in our community—I hope so. Rock Your Roots is about healing, building trust, and recommitting to reconciliation.”
Carrie Catherine, Coordinator of Reconciliation Saskatoon says: “The walk is an opportunity to honour Survivors and experience a future where Indigenous and non-Indigenous peoples hold a shared understanding of our history, celebrate vibrant cultures and worldviews, have equitable systems that benefit us all, and build authentic relationships. We must listen to the truth of the past to build a better way forward.”
Melissa Cote, City of Saskatoon Director of Indigenous Initiatives says: “It’s not about surviving anymore, it’s about thriving—for our remaining Survivors and everyone affected by the residential school system. On September 30, we’ll walk together to honour all Survivors.”
Shirley Isbister, CUMFI President says: “There’s nothing better than seeing the orange shirts: it shows we’re taking a stand to make sure a new generation has a different life. We must continue to teach young people about our history, so it doesn’t repeat itself.”
Kathie Pruden Nansel, Regional Director, MN-S Western Region 2A says: “I honour all the Survivors and the way they’ve shared their truths. We need to make a commitment to them that we’ll continue making things better for all the future generations.”
22nd Street closed between 3rd and 4th avenues on Friday
September 28, 2023 - 7:00am
22nd Street will be closed between 3rd and 4th avenues on Friday, September 29, starting at 9:00 a.m. for infrastructure upgrades. Detours will be in place guiding motorists around the work zone. This project is expected to take two hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City of Saskatoon will have adjusted hours & civic services on Monday, October 2
September 28, 2023 - 12:15am
The City of Saskatoon will observe the stat for the National Day for Truth and Reconciliation, on Monday, October 2, 2023.
Several civic services and hours of operation will be adjusted. To note, parking payment will be required on Saturday, September 30 and on Monday, October 2. Check the complete list of what's open and closed at the City, holiday hours for Saskatoon Transit, Leisure Centre hours and more here.
Daily Road Report - September 28, 2023
September 27, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
IDYLWYLD DR N SB CURB AND SHOULDER LANES CLOSED FROM 71ST ST W TO WAKOOMA ST
(Pole replacements)
Start: September 28, 9:00 a.m. End: September 28, 2:00 p.m.
ONGOING
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
2ND AVE S SB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Concrete replacement)
Start: September 25, 7:00 a.m. End: October 1, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
ZIMMERMAN RD NB & SB CURB LANES CLOSED FROM MARKET DR TO MEADOWS PKY
(Sidewalk installation)
Start: September 25, 8:00 a.m. End: October 15, 5:00 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Archibald, Cosmo and Lions arenas scheduled to open beginning October 1, 2023
September 27, 2023 - 8:00am
- ACT Arena: 107 105th Street East
Public Skating – open
Tuesday: 7:00 p.m. to 8:30 p.m.
Sunday: 2:30 p.m. to 4:00 p.m.Parent and Tot Skating – open
Monday and Thursday: 2:30 p.m. to 3:15 p.m.
- Archibald Arena: 1410 Windsor Street
Public Skating – begins October 1, 2023
Sunday: 12:30 p.m. to 2:00 p.m.Parent and Tot Skating – begins November 1, 2023
Wednesday: 2:30 p.m. to 3:15 p.m.
- Cosmo Arena: 3130 Laurier Drive
Public Skating – begins October 1, 2023
Wednesday and Thursday: 12:00 p.m. to 1:00 p.m.
Friday: 12:00 p.m. to 1:00 p.m. and 7:00 p.m. to 8:30 p.m.
Sunday: 12:30 p.m. to 2:00 p.m.Parent and Tot Skating – begins October 2, 2023
Monday and Friday: 2:30 p.m. to 3:15 p.m.
- Lions Arena: 2205 McEown Avenue
Public Skating – begins October 1, 2023
Sunday: 2:30 p.m. to 4:00 p.m. and 6:45 p.m. to 8:15 p.m.Parent and Tot Skating – begins October 3, 2023
Tuesday and Friday: 2:30 p.m. to 3:15 p.m. - Adult (19 and over) - $6.35
- Youth (6 to 18) - $4.25
- Preschool (5 and under) - Free
- Family - $12.70
- Parent & Tot – Free
Archibald, Cosmo and Lions arenas are scheduled to open beginning Sunday, October 1, 2023. ACT arena began public and parent & tot skating at the beginning of September. The weekly public and parent & tot schedules for each rink are as follows:
2023-2024 admission rates are as follows:
LeisureCards, which provide unlimited access to the six Leisure Centres, Terry Fox Track and four outdoor pools are also accepted as a payment option at the indoor rinks. Cash and Leisure gift cards are also accepted at the rinks. Debit and credit cards are only accepted at Cosmo Arena.
Children, 6 years of age and younger, must be accompanied by a responsible person 16 years of age or older. A maximum of two preschoolers per adult is allowed.
Visit saskatoon.ca/indoorrinks for more information, including ice rental opportunities.
Daily Road Report, September 27, 2023
September 26, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CONFEDERATION DR NB CURB LANE CLOSED FROM MILTON ST TO BORDEN PL
(Hydrant replacement)
Start: September 27, 7:00 a.m. End: September 27, 5:00 p.m.
HIGHWAY 16 EB & WB SPEED REDUCTION FROM BOYCHUK DR TO CIRCLE DR E
(Pole replacements)
Start: September 27, 9:00 a.m. End: September 27, 2:00 p.m.
IDYLWYLD DR S SB CURB LANE CLOSED FROM 22ND ST E TO 21ST ST E
(Sidewalk repairs)
Start: September 27, 9:00 a.m. End: September 27, 3:00 p.m.
25TH ST E WB MEDIAN & LEFT TURN BAY CLOSED AND EB MEDIAN LANE CLOSED FROM 5TH AVE N TO 6TH AVE N
(Median concrete repair)
Start: September 27, 9:00 a.m. End: September 27, 3:00 p.m.
ONGOING
4TH AVE N SB CURB LANES CLOSED FROM 24TH ST E TO 23RD ST E
(Concrete work)
Start: September 25, 7:00 a.m. End: September 27, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
2ND AVE S SB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Concrete replacement)
Start: September 25, 7:00 a.m. End: October 1, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
ZIMMERMAN ROAD NB & SB CURB LANES CLOSED FROM MARKET DR TO MEADOWS PKY
(Sidewalk installation)
Start: September 25, 8:00 a.m. End: October 15, 5:00 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
City raises Survivors’ Flag in honour of Residential School Survivors
September 25, 2023 - 4:00pm
The City hosted members of the Saskatoon Survivors Circle in Civic Square on Sept. 25 for the annual raising of the Survivors’ Flag. This event is intended to honour all Survivors and those impacted by the residential school system.
Each element depicted on the Survivors’ Flag (created in 2021) was carefully selected by Survivors from across Canada. Eugene Arcand of the Saskatoon Survivors Circle – a Cree Survivor who attended St. Michael’s Residential School – was involved with the flag’s design.
The program included: remarks from dignitaries such as STC Tribal Chief Mark Arcand; MN-S Western Region 2A Regional Director Kathie Pruden Nansel; CUMFI President Shirley Isbister; and Councillor Cynthia Block (Ward 6). An overview of the significance of the Survivors’ Flag was provided by Eugene Arcand, followed by a Moment of Silence for the Missing Children. The event concluded with the raising of the flag by Survivors Rick Daniels, Irene Sharp, Ida Jean Skarjstad, and Florence Highway.
The Survivors’ Flag will remain raised in Civic Square until Oct 2, 2023.
Daily Road Report, September 26, 2023
September 25, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
VICTORIA AVE ROAD CLOSED FROM ELM ST E TO ADELAIDE ST E
(Roadway patching)
Start: September 26, 7:00 a.m. End: September 26, 3:00 p.m.
BROADWAY AVE NB & SB MEDIAN LANE CLOSED FROM 2ND ST E TO 3RD ST E
(Roadway patching)
Start: September 26, 7:00 a.m. End: September 26, 3:00 p.m.
LORNE AVE SB CURB LANE CLOSED AT EXHIBITION GROUNDS RD
(SaskEnergy construction)
Start: September 26, 7:00 a.m. End: September 26, 5:00 p.m.
1ST AVE N NB LANE CLOSED AT KING ST
(Valve repair)
Start: September 26, 9:00 a.m. End: September 26, 1:00 p.m.
IDYLWYLD DR S SB CURB LANE CLOSED AT SASKATCHEWAN CRES W
(Minor bridge repair)
Start: September 26, 9:00 a.m. End: September 26, 3:00 p.m.
IDYLWYLD DR S NB CURB LANE CLOSED AT SASKATCHEWAN CRES E
(Minor bridge repair)
Start: September 26, 9:00 a.m. End: September 26, 3:00 p.m.
25TH ST E WB MEDIAN & LEFT TURN BAY AND EB MEDIAN LANE CLOSED FROM 5TH AVE N TO 6TH AVE N
(Median concrete repair)
Start: September 26, 9:00 a.m. End: September 26, 3:00 p.m.
IDYLWYLD DR S SB CURB LANE CLOSED FROM 22ND ST W TO 21ST ST W
(Sidewalk repairs)
Start: September 26, 9:00 a.m. End: September 26, 3:00 p.m.
ONGOING
4TH AVE N SB CURB LANES CLOSED FROM 24TH ST E TO 23RD ST E
(Concrete work)
Start: September 25, 7:00 a.m. End: September 27, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
2ND AVE S SB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Concrete replacement)
Start: September 25, 7:00 a.m. End: October 1, 5:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
ZIMMERMAN ROAD NB & SB CURB LANES CLOSED FROM MARKET DR TO MEADOWS PKY
(Sidewalk installation)
Start: September 25, 8:00 a.m. End: October 15, 5:00 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Free Elm Wood Disposal offered throughout October at the City Landfill
September 25, 2023 - 1:30pm
- Never storing elm wood or branches. Don’t buy or take elm wood from anyone and don’t burn it. Elm firewood is the best habitat for bark beetles.
- Disposing of elm wood at the Saskatoon Regional Waste Management Centre (Landfill). Do not take elm to the compost depot or put it in your green bin. Dispose of it immediately, even if it is during the provincial ban.
- Reporting dead or dying elm trees or branches to the city or to a professional arborist.
Between October 1 and October 31, the City of Saskatoon is pleased to offer its residents the opportunity to dispose of elm wood at the Landfill at no cost. This initiative aims to encourage the prompt removal and proper disposal of elm wood, reducing the risk of disease transmission to healthy elm trees.
“Elm trees hold a special place in our urban landscape, providing shade, enhancing aesthetics, and supporting local biodiversity. However, they face a serious threat from diseases like Dutch Elm Disease. To help manage this issue effectively and limit the spread, it is crucial to ensure proper disposal of all elm wood,” says Konrad Andre, Parks Operations Manager.
This one-month pilot project means that residents may dispose of Elm wood, including branches, logs and other elm debris, at the Landfill during regular operating hours through October at no cost. The Saskatoon Regional Waste Management Centre (Landfill) is located along Valley Road, south of 11th Street.
“By taking advantage of this free elm wood disposal pilot program, residents and businesses can play an active role in protecting our urban canopy and preserving the natural beauty of our community,” says Andre. “Timely disposal of elm wood can significantly reduce the risk of Dutch elm disease and support the health of our elm tree population.”
What is DED?
DED is a serious fungal disease that impacts an elm tree’s water and nutrient conducting system, which eventually causes the tree to die. In Saskatoon, elms make up 25% of the public urban forest.
How is DED spread?
In Saskatchewan, the disease is spread by several species of elm bark beetles. These beetles can fly farther than two kilometres in search of elm trees and are attracted to the scent of pruned or damaged trees and firewood. The DED fungus has tiny spores that stick to the bodies of bark beetles and they can carry these spores and infect other elm trees. The fungus can also be spread by infected pruning tools.
You can help prevent DED by:
How to identify and report unhealthy elm trees and firewood
American elm trees with DED may start showing symptoms as early as June. Typically, the leaves will start to wilt and turn yellow, then curl and turn brown. If you suspect an unhealthy elm tree or are unsure of what type of firewood you have, take a photo and complete the online form at saskatoon.ca/dutchelmdisease or call Urban Forestry at 306-975-2890.
For more information on DED, visit saskatoon.ca/dutchelmdisease.
Victoria Avenue closed from Elm to Adelaide streets on Tuesday
September 25, 2023 - 6:00am
Victoria Avenue will be closed between Elm and Adelaide streets on Tuesday, September 26th, starting at 7:00 a.m. for roadway patching. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report, September 25, 2023
September 22, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
4TH AVE N SB CURB LANES CLOSED FROM 24TH ST E TO 23RD ST E
(Concrete work)
Start: September 25, 7:00 a.m. End: September 27, 4:30 p.m.
IDYLWYLD DR S NB & SB CENTER & MEDIAN LANES CLOSED AT SASKATCHEWAN CRES E
(Minor bridge rehabilitation)
Start: September 25, 9:00 a.m. End: September 25, 3:00 p.m.
WARMAN RD SB CURB LANE CLOSED AT BALMORAL ST
(Manhole repair)
Start: September 25, 10:00 a.m. End: September 25, 1:00 p.m.
ONGOING
SPADINA CRES E NB LANE CLOSED FROM 22ND ST E TO 23RD ST E
(Storm pipe repair)
Start: September 19, 7:00 a.m. End: September 29, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report, September 23-24, 2023
September 22, 2023 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR S NB CURB LANE CLOSED FROM JONATHON AVE TO FLETCHER RD
(Manhole repair & patching)
Start: September 23, 7:00 a.m. End: September 23, 3:00 p.m.
4TH AVE N ROAD CLOSED FROM 23RD ST E TO 24TH ST E
(HMCS Unicorn Freedom Parade)
Start: September 23, 8:00 a.m. End: September 23, 1:00 p.m.
AVE C N ROAD CLOSED FROM 33RD ST W TO 32ND ST W
(4th Quarter Vintage Event )
Start: September 23, 9:00 a.m. End: September 23, 7:00 p.m.
20TH ST W ROAD CLOSED FROM IDYLWYLD DR S TO AVE E S
(Nuit Blanche)
Start: September 23, 3:00 p.m. End: September 24, 1:00 a.m.
BROADWAY AVE ROAD CLOSED FROM MAIN ST TO 12TH ST E
(Nuit Blanche)
Start: September 23, 3:00 p.m. End: September 24, 1:00 a.m.
SPADINA CRES E ROAD CLOSED FROM 2ND AVE S TO 20TH ST E
(Nuit Blanche)
Start: September 23, 3:00 p.m. End: September 24, 1:00 a.m.
SPADINA CRES E ROAD CLOSED FROM 22ND ST E TO 24TH ST E
(Nuit Blanche)
Start: September 23, 3:00 p.m. End: September 24, 1:00 a.m.
TAYLOR ST W ROAD CLOSED FROM ST HENRY AVE TO IDYLWYLD DR S
(Step-Up Marathon)
Start: September 24, 5:00 a.m. End: September 24, 10:00 a.m.
MCKERCHER DR SB LANES CLOSED FROM AVONDALE RD TO TAYLOR ST E
(Crack sealing)
Two-way traffic will be maintained in the NB lanes
Start: September 24, 7:00 a.m. End: September 24, 11:00 a.m.
SPADINA CRES E ROAD CLOSED FROM 21ST ST E TO 24TH ST E
(Step-Up Marathon)
Start: September 24, 7:00 a.m. End: September 24, 2:30 p.m.
TAYLOR ST E EB LANES CLOSED FROM EASTLAKE AVE TO BROADWAY AVE
(Roadway patching)
Start: September 24, 8:00 a.m. End: September 24, 4:00 p.m.
TRAFFIC BRIDGE ROAD CLOSED FROM 11TH ST E TO 19TH ST E
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:00 a.m.
SPADINA CRES E ROAD CLOSED FROM 2ND AVE S TO 20TH ST E
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:00 a.m.
20TH ST E ROAD CLOSED FROM 4TH AVE S TO SPADINA CRES E
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:00 a.m.
4TH AVE S ROAD CLOSED FROM 20TH ST E TO 23RD ST E
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:00 a.m.
23RD ST E ROAD CLOSED FROM 4TH AVE N TO SPADINA CRES E
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:00 a.m.
SPADINA CRES E ROAD CLOSED AT 24TH ST E
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:30 a.m.
SPADINA CRES E ROAD CLOSED FROM 25TH ST E TO BALMORAL ST
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:30 a.m.
SPADINA CRES E NB LANES CLOSED FROM BALMORAL ST TO SILVERWOOD RD
(Step-Up Marathon)
Start: September 24, 9:00 a.m. End: September 24, 11:30 a.m.
AVE H N SB LANES CLOSED FROM RUSHOLME RD TO BEDFORD RD
(Roadway patching)
Start: September 24, 9:00 a.m. End: September 24, 5:00 p.m.
ONGOING
WARMAN RD NB CURB LANE CLOSED AT CHURCHILL DR
(Road resurfacing)
Start: September 22, 9:00 a.m. End: September 24, 5:00 p.m.
CIRCLE DR E SB MEDIAN LANE CLOSED AT 108TH ST W
(Minor bridge repair)
Start: September 22, 7:00 a.m. End: September 24, 6:00 p.m.
CIRCLE DR E NB MEDIAN LANE CLOSED AT 108TH ST W
(Minor bridge repair)
Start: September 22, 10:00 a.m. End: September 24, 6:00 p.m.
SPADINA CRES E NB LANES CLOSED FROM 22ND ST E TO 23RD ST E
(Storm pipe repair)
Start: September 19, 7:00 a.m. End: September 29, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Road restrictions for Step-Up Marathon on Sunday
September 22, 2023 - 10:00am
- Victoria Bridge from 11th to 19th streets (reopening at 10:30)
- Spadina Crescent between 2nd Avenue and 20th Street
- 20th Steet between Spadina Crescent and 4th Avenue
- 4th Avenue between 20th & 23rd streets
- 23rd Street between 4th Avenue and Spadina Crescent
- Spadina Crescent at 24th Street
- Spadina Crescent from 24th Street at University Bridge to Balmoral St
Downtown road closures will be in place starting Sunday, September 24, at 9:00 a.m. for the Step-Up Marathon.
Road closures include:
Detours will be in place guiding motorists around the race route. Roadways will reopen as racers complete various stages. All roads will be open 2:00 p.m., weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Road restrictions start Saturday for Nuit Blanche event
September 22, 2023 - 9:00am
- Spadina Crescent will be closed from 2nd Avenue to 20th Street and between 22nd and 24th streets
- Broadway Avenue will be closed between Main Street and 12th Street
- 20th Street will be closed from Idylwyld Dr to Avenue E
To accommodate the Nuit Blanche event road closures, no parking signs, and lane restrictions will be in place in the downtown area and on Broadway Avenue starting Saturday, September 23 at 3:00 p.m.
Event road restrictions:
Detours will be in place guiding motorists around the event zone. Restrictions will be lifted by 1:00 a.m. Sunday, September 24 barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Avenue C closed between 32nd and 33rd streets on Saturday
September 22, 2023 - 8:00am
Avenue C will be closed between 32nd and 33rd streets on Saturday, September 23rd starting at 9:00 a.m. for the Dated & Faded Vintage Market. Detours will be in place guiding motorists around the event. Roadways are expected to reopen by 7:00 p.m. weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
4th Avenue closed betwen 23rd and 24th streets on Saturday
September 22, 2023 - 7:00am
4th Avenue will be closed between 23rd and 24th streets on Saturday, September 23rd starting at 8:00 a.m. for the HMCS Unicorn Freedom Parade. Detours will be in place guiding motorists around the event. Roadways are expected to reopen by 1:00 p.m. weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Special event bus service to SaskTel Centre this weekend
September 22, 2023 - 6:00am
- 6:15 p.m.
- 6:55 p.m.
- 2:45 p.m.
- 3:25 p.m.
Direct bus service from the Special Events Stop (23rd Street and 2nd Avenue) to see Jerry Seinfeld Live at SaskTel Centre on Saturday, September 23 at 7:30 p.m., is available at the following times:
Direct bus service from the Special Events Stop to see the Saskatoon Blades take on the Prince Albert Raiders at SaskTel Centre on Saturday, September 23 at 4:00 p.m., is available at the following times:
Post event drop-off is the downtown terminal and regular fares apply ($3.00 per trip). Fare can be purchased on your mobile phone using either the TGo or transit app, transfers and passes are also accepted.
Plan your trip to events at SaskTel Centre on Route 333 using the Transit app up to two weeks in advance. Check out the Transit+ feature to help make connections that combine Transit with OnDemand Transit, riide, and Uber. Download the Transit app from the Apple Store or Google Play.
Transit service times for special events at SaskTel Centre and other popular destinations can always be found at SaskatoonTransit.ca/plan-my-trip/popular-destinations. Experience the convenience of using Saskatoon Transit to attend all your favourite events.
Daily Road Report - September 22, 2023
September 21, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
CIRCLE DR E SB MEDIAN LANE CLOSED AT 108TH ST W
(Minor bridge repair)
Start: September 22, 7:00 a.m. End: September 24, 6:00 p.m.
CIRCLE DR S WB MEDIAN LANE CLOSED AT VALLEY RD
(Manhole repair)
Start: September 22, 9:00 a.m. End: September 22, 3:00 p.m.
WARMAN RD NB CURB LANE CLOSED AT CHURCHILL DR
(Road resurfacing)
Start: September 22, 9:00 a.m. End: September 24, 5:00 p.m.
CIRCLE DR E NB MEDIAN LANE CLOSED AT 108TH ST W
(Minor bridge repair)
Start: September 22, 10:00 a.m. End: September 24, 6:00 p.m.
ONGOING
HIGHWAY 11 NB CURB LANE CLOSED FROM CIRCLE DR E TO HIGHWAY 16
(Bridge maintenance)
Start: September 19, 9:00 a.m. End: September 22, 3:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m..
2ND AVE N NB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Sidewalk repairs)
Start: September 18, 7:00 a.m. End: September 22, 5:00 p.m.
SPADINA CRES E NB LANES CLOSED FROM 22ND ST E TO 23RD ST E
(Storm pipe repair)
Start: September 19, 7:00 a.m. End: September 29, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Saskatoon Fire Department celebrates grand opening of new fire station
August 29, 2023 - 1:00pm
Saskatoon Fire Department (SFD) is pleased to celebrate the grand opening of the new Fire Station No. 5 at 1075 Preston Avenue North. The new station will replace the 56-year-old Fire Station No. 5 at 421 Central Avenue in Sutherland.
The relocation comes as a result of a review of SFD’s operations in 2014 that led to the development of a new service model to improve the fire service’s response times across the city. The model aims to ensure SFD’s delivery of services is done in the most effective and efficient way possible as the City looks to the future and how to provide emergency response service to a city of 500,000 residents.
The new fire station features 10,000 square feet on two storeys and is equipped with two bays that will house one frontline engine and reserve apparatus. The station will be staffed with four firefighter-paramedics and one officer, 24 hours per day. Fire Inspectors will also use the new station’s office space during daytime hours.
A highlight of the building is the dedicated cultural space. The room’s design intentionally includes a central tiled circle and is equipped with ventilation to accommodate smudging ceremonies. The perimeter of the room will highlight artwork created by students from Oskāyak High School, which will be regularly updated throughout the year. The shared space is intended for use by SFD and the University of Saskatchewan. When available, the room will be open for public bookings by residents and community groups.
“This new fire station serves as a demonstration of collaboration for the betterment of the community. The partnership we've experienced with the University of Saskatchewan has been instrumental in the endeavor of relocating Station No. 5,” says Fire Chief Morgan Hackl. "The station offers a newer facility design for our crews that is centered around our commitment to truth and reconciliation, while at the same time delivering improved response coverage to the north-east part of the city. The relocation of Station No. 5 is a welcomed addition to our network of infrastructure and will support the community for generations to come.”
“The new Fire Hall No. 5, built in partnership with the University of Saskatchewan, is a great collaboration that will re-organize the fire service to provide better response times to neighbourhoods as the City grows. It is important that all of our neighbourhoods, both existing and new, have access to immediate fire and safety services when they need them. It will also save millions of dollars a year by reducing the need for another station in the area. I want to thank all partners who have worked together to help improve the services in our city,” says Mayor Charlie Clark.
“The establishment of the new fire station is the latest development in our long-standing relationship with the City of Saskatoon,” said University of Saskatchewan (USask) President Peter Stoicheff. “We are proud to play a role in supporting this vital project and furthering our commitment to the vibrant community that we all serve. We are also pleased to see the inclusion of a shared cultural space on this site spotlighting the work of Oskāyak High School
students, as we recognize that this new fire station is located on Treaty 6 Territory and the Homeland of the Métis.” says University of Saskatchewan President Peter Stoicheff.
To commemorate the completion of construction, a ceremonial grand opening event took place at the new station on Tuesday, August 29, 2023. Station No. 5 is scheduled to be fully operational in mid-September once all Life Safety tests are complete. The former Station No. 5 on Central Avenue will be decommissioned and options will be explored to determine the future of the building.
For additional information, visit saskatoon.ca/FireStation5.
Daily Road Report - September 21, 2023
September 20, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
3RD AVE N SB LANES CLOSED FROM 25TH ST E TO 24TH ST E
(Sign installation)
Start: September 21, 7:00 a.m. End: September 21, 7:00 p.m.
BROADWAY AVE INTERSECTION CLOSED AT HILLIARD ST E
(Catch basin lead repairs)
Start: September 21, 8:00 a.m. End: September 21, 4:00 p.m.
BOYCHUK DR NB LEFT TURN BAY CLOSED AT KINGSMERE BLVD
(Traffic detector replacement)
Start: September 21, 9:00 a.m. End: September 21, 12:00 p.m.
20TH ST W EB & WB VARIOUS LANES CLOSED WITH PILOT TRUCK FROM AVE G S TO AVE H S
(Environmental monitoring)
Start: September 21, 9:00 a.m. End: September 22, 1:00 p.m.
IDYLWYLD DR N SB CURB LANE CLOSED AT ABERDEEN PL
(Manhole repair)
Start: September 21, 10:00 a.m. End: September 21, 2:00 p.m.
IDYLWYLD DR S NB CURB LANE CLOSED FROM RUTH ST E TO ELM ST E
(Elm removal)
Start: September 21, 10:30 a.m. End: September 21, 11:30 a.m.
8TH ST E EB MEDIAN & CENTER LANE CLOSED AT ACADIA DR
(Manhole repair)
Start: September 21, 11:00 a.m. End: September 21, 2:00 p.m.
ONGOING
HIGHWAY 11 NB CURB LANE CLOSED FROM CIRCLE DR E TO HIGHWAY 16
(Bridge maintenance)
Start: September 19, 9:00 a.m. End: September 22, 3:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m.
2ND AVE N NB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Sidewalk repairs)
Start: September 18, 7:00 a.m. End: September 22, 5:00 p.m.
SPADINA CRES E NB LANES CLOSED FROM 22ND ST E TO 23RD ST E
(Storm pipe repair)
Start: September 19, 7:00 a.m. End: September 29, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Get ready to rock your roots on September 30!
September 20, 2023 - 11:00am
The 2023 Rock Your Roots Walk for Reconciliation will take place on the National Day for Truth and Reconciliation (September 30) between 10:00 and 11:30 a.m. The walk will begin at Central Urban Métis Federation Inc. (CUMFI) and end at the “Where Our Paths Cross” Reconciliation Circle art installation in Victoria Park (across the road from 422 Spadina Cres W).
Rock Your Roots is put on by Reconciliation Saskatoon, which the City of Saskatoon co-chairs along with the Office of the Treaty Commissioner (OTC). The event, which has seen attendance in the thousands in past years, was first held in 2016. The intent of this event is to answer the Truth and Reconciliation Commission of Canada's Calls to Action by demonstrating a commitment to Reconciliation, honouring Residential School Survivors, and continuing work towards an inclusive community.
The event is called “Rock Your Roots” as a reminder to be proud of where you came from and the diversity in our community. Cultural performers from our community are invited to "rock their roots" along the route as a celebration of our cultural differences. The significance of doing a walk can be attributed to the Sunday walks in residential schools; this was often the only time when siblings and cousins of different genders might be reunited.
The Rock Your Roots Walk for Reconciliation is an acknowledgment of the multi-generational impacts of residential schools. It’s one way to demonstrate a commitment to Reconciliation and to equal opportunities for every member of our community.
This event is open to all and is family-friendly. Workplaces and organizations are encouraged to send a team and to consider showcasing their organization’s support by carrying a banner during the walk. Participants are invited to wear an EveryChildMatters orange shirt or their traditional cultural clothing. For timely updates, you can join or follow the Rock Your Roots: Walk for Reconciliation Facebook Event.
Broadway Avenue intersection closed at Hilliard Street on Thursday
September 20, 2023 - 6:00am
The intersection at Broadway Avenue and Hilliard Street will be closed on Thursday, September 21 starting at 8:00 a.m. for catch basin repairs. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - September 20, 2023
September 19, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
AVE H N INTERSECTION CLOSED AT 36TH ST W
(Roadway patching)
Start: September 20, 7:00 a.m. End: September 20, 3:00 p.m.
20TH ST W EB & WB MEDIAN LANES CLOSED FROM AVE N S TO AVE O S
(Roadway patching)
Start: September 20, 7:00 a.m. End: September 20, 3:00 p.m.
TAYLOR ST E EB MEDIAN LANE CLOSED FROM BROADWAY AVE TO WILLIAM AVE
(Construction)
Start: September 20, 9:00 a.m. End: September 20, 12:00 p.m.
PRESTON AVE S NB LEFT TURN LANE CLOSED AT TAYLOR ST E
(Traffic signal work)
Start: September 20, 9:00 a.m. End: September 20, 12:30 p.m.
MCKERCHER DR SB CURB & NEXT LANE CLOSED FROM COLLEGE DR TO BOYCHUK DR
(Streetlight pole replacements)
Start: September 20, 9:00 a.m. End: September 20, 2:00 p.m.
ONGOING
DUNDONALD AVE ROAD CLOSED FROM MOUNTBATTEN ST TO DIEPPE ST
(Catch basin & manhole installations)
Start: September 5, 8:00 a.m. End: September 20, 5:00 p.m.
HIGHWAY 11 NB CURB LANE CLOSED FROM CIRCLE DR E TO HIGHWAY 16
(Bridge maintenance)
Start: September 19, 9:00 a.m. End: September 22, 3:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m.
2ND AVE N NB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Sidewalk repairs)
Start: September 18, 7:00 a.m. End: September 22, 5:00 p.m.
SPADINA CRES E NB LANES CLOSED FROM 22ND ST E TO 23RD ST E
(Storm pipe repair)
Start: September 19, 7:00 a.m. End: September 29, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE NB & SB CLOSED FROM 5TH ST E TO 8TH ST E
(watermain work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Avenue H intersection closed at 26th Street starting Wednesday
September 19, 2023 - 6:00am
The intersection at Avenue H and 26th Street will be closed starting Wednesday, September 20, at 7:00 a.m. for roadway patching. Detours will be in place guiding motorists around the work zone. This project is expected to take two days to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - September 19, 2023
September 18, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
SPADINA CRES E NB LANES CLOSED FROM 22ND ST E TO 23RD ST E
(Storm pipe repairs)
Start: September 19, 7:00 a.m. End: September 29, 4:30 p.m.
CIRCLE DR S WB CURB LANE CLOSED FROM ST HENRY AVE TO SPADINA CRES W
(Construction)
Start: September 19, 9:00 a.m. End: September 19, 3:00 p.m.
HIGHWAY 11 NB CURB LANE CLOSED FROM CIRCLE DR E TO HIGHWAY 16
(Bridge maintenance)
Start: September 19, 9:00 a.m. End: September 22, 3:00 p.m.
2ND AVE S SB LANES CLOSED FROM 22ND ST E TO 21ST ST E
(Vault work)
Start: September 19, 2:30 p.m. End: September 19, 8:30 p.m.
NIGHTWORK
20TH ST E WB CURB LANE CLOSED FROM 1ST AVE S TO IDYLWYLD DR S
(SL&P Vault work)
Start: September 19, 6:00 p.m. End: September 20, 12:00 a.m.
ONGOING
DUNDONALD AVE ROAD CLOSED FROM MOUNTBATTEN ST TO DIEPPE ST
(Catch basin & manhole installations)
Start: September 5, 8:00 a.m. End: September 20, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m.
2ND AVE N NB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Sidewalk repairs)
Start: September 18, 7:00 a.m. End: September 22, 5:00 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(SL&P manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Reminder: In-person public engagement today on proposed options to change ward boundaries
September 17, 2023 - 11:15pm
- Confederation Urban Centre currently Ward 3 – would move to join Ward 2
- Nutana Park currently Ward 7 – would move to join Ward 9
- Hudson Bay Park currently Ward 1 – would move to join Ward 2
- Downtown currently Ward 6 – would move to join Ward 1
- Nutana Park currently Ward 7 – would move to join Ward 6
- Provide your feedback online through a brief survey @ saskatoon.ca/engage/ward-boundaries
- Email the City Clerk’s Office at city.clerks@saskatoon.ca
- Write a letter to the City Clerk’s Office, 222-3rd Avenue North, Saskatoon, SK S7K 0J5
- Drop off your comments at the Service Saskatoon Customer Kiosk located in the Lobby of City Hall
One of the early planning steps for the City of Saskatoon’s civic election to be held in fall 2024 is to have the Municipal Wards Commission review the boundaries of the ten current wards in the city to ensure they all have similar population numbers, according to The Cities Act.
Under the existing provisions of The Cities Act, Ward 2 and Ward 7 are currently outside of the allowable +/-10% population variance threshold that triggers a ward boundary review.
The Municipal Wards Commission is now presenting Option A and Option B ward boundary changes for public input having considered feedback received from residents at the first public engagement held in June 2023. In putting forward these two options, The Commission has also considered current density, future population growth, geographic barriers, limiting change, communities of interest, and maintaining neighbourhood boundaries. Review the ward boundary review background and June 2023 engagement results
Option A: Proposed Ward Moves
Option B: Proposed Ward Moves
There are several ways to share your input on the proposed ward boundary options:
Plan to attend Public Engagement Session #2 today, Monday, September 18, 2023, from 7:30 p.m. to 9 p.m. at Committee Room E, City Hall. Use entrance #1 at the corner of 4th Ave and 23rd St East. Public parking is available in the City Hall staff lot after 6:00 p.m.
Or share your input before October 3, 2023, through these options:
Ward boundary reviews must be completed no less than 180 days before a general municipal election. The Municipal Wards Commission was created following The Municipal Wards Commission Bylaw and currently consists of: King’s Bench Justice Richard Danyliuk, U of S Political Studies Professor Dr. Kathy Walker, and City Clerk Adam Tittemore.
Following a review of all public feedback collected through this second public engagement offering, the Municipal Wards Commission will establish the new ward boundaries and file its report with City Council in fall 2023.
The new ward boundaries will take effect for the City of Saskatoon municipal and school Board trustee elections to be held in November of 2024.
Review the rationale used to develop Option A and Option B, ward maps, previous engagement results, background information and online survey at saskatoon.ca/wardboundaries or call 306-975-3240.
Navigating full buses: Tips for students during back-to-school
September 15, 2023 - 5:00pm
- Departure time flexibility. Schedules can be tight, but if students have some flexibility in their daily routines, consider taking an earlier or later bus when the bus may be less crowded. The bus that drops students off just prior to the start of class tends to be busier than the earlier or next bus.
- Use tracking and watch for service alerts. Saskatoon Transit has real-time transit tracking through third-party apps like Transit, or Google Maps on desktop. Real-time transit tracking shows you where your bus is and when the next bus arrives, which limits wait times at bus stops. Pin your preferred routes for service alert push notifications.
- Be prepared to board. Having your fare ready and/or app open can help speed up the process and avoid any boarding delays.
- Find your spot. Quickly find an open seat or standing area in the event all seats are occupied
- Keep on moving. As riders exit the bus, passengers left standing are to continue moving back towards the rear of the bus to fill empty spaces or seats. This helps the operator understand bus capacity.
- Remove backpacks. Make space for people. If the bus is busy, do not take up available seating with bags or belongings. Keep items in your lap and feet on the floor.
With the school year in full swing, Saskatoon Transit is experiencing typical increased demand, resulting in some buses reaching full capacity across the city, including Evergreen, Stonebridge, and Rosewood.
Full buses are inconvenient and stressful for students and parents alike. To address this increased demand, Saskatoon Transit is running larger capacity articulating buses on the routes with high schools and post-secondary institutions and deploying three additional buses as needed. Transit will continue to monitor the situation over the coming weeks.
When a bus is full, the transit operator logs the information location, route, time, and date. The head sign will read “Full Bus” and the operator will drive past bus stops - even when riders are waiting - until there is space for more people.
All available resources are being used with schedules being adjusted to accommodate, where possible. To help alleviate the situation and ensure a smoother experience for everyone involved, we offer some guidance:
Daily Road Report - September 18, 2023
September 15, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
2ND AVE N NB CURB LANE CLOSED FROM QUEEN ST TO KING ST
(Sidewalk repairs)
Start: September 18, 7:00 a.m. End: September 22, 5:00 p.m.
4TH AVE S SB MEDIAN LANE CLOSED AT 19TH ST E
(Manhole repair)
Start: September 18, 7:00 a.m. End: October 20, 5:00 p.m.
NIGHTWORK
IDYLWYLD DR N SB CURB LANE & RIGHT TURN LANE CLOSED AT MARQUIS DR W
(Road resurfacing)
Start: September 17, 7:00 p.m. End: September 18, 6:00 a.m.
ONGOING
DUNDONALD AVE ROAD CLOSED FROM MOUNTBATTEN ST TO DIEPPE ST
(Catch basin & manhole installations)
Start: September 5, 8:00 a.m. End: September 20, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Weekend Road Report - September 16-17, 2023
September 15, 2023 - 2:30pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
33RD ST W ROAD CLOSED FROM AVE F N TO AVE C N
(33rd Street Fair)
Start: September 16, 5:00 a.m. End: September 16, 8:00 p.m.
IDYLWYLD DR N NB LANES CLOSED FROM 25TH ST E TO 27TH ST W
(Car wash connections)
Two-way traffic will be maintained in the SB lanes
Start: September 16, 7:00 a.m. End: September 17, 6:00 p.m.
LORNE AVE ROAD CLOSED FROM TAYLOR ST E TO 1ST ST E
(Valve repairs)
Start: September 16, 8:00 a.m. End: September 16, 4:00 p.m.
MCKERCHER DR NB OFFRAMP & EB CURB LANE CLOSED FROM MCKERCHER DR TO COLLEGE DR
(Streetlight pole replacements)
Start: September 17, 6:00 a.m. End: September 17, 12:00 p.m.
COLLEGE DR EB MEDIAN & CENTER LANES CLOSED AT UNIVERSITY DR
(Roadway patching)
Start: September 17, 7:00 a.m. End: September 17, 3:00 p.m.
MCKERCHER DR SB MEDIAN AND CENTER LANES CLOSED FROM COLLEGE DR TO BOYCHUK DR
(Roadway patching)
Start: September 17, 7:00 a.m. End: September 17, 3:00 p.m.
SPADINA CRES E SB LANES CLOSED FROM DUKE ST TO QUEEN ST
(Roadway patching)
Start: September 17, 7:00 a.m. End: September 17, 3:00 p.m.
TAYLOR ST E EB MEDIAN & LEFT TURN LANE CLOSED; WB MEDIAN LANE CLOSED FROM HERITAGE WAY TO HERITAGE CRES
(Pole wiring)
Start: September 17, 8:00 a.m. End: September 17, 2:00 p.m.
20TH ST W VARIOUS ROAD RESTRICTIONS FROM AVE P S TO AVE C S
(Walk for Megan)
Police led walk along the route
Start: September 17, 9:00 a.m. End: September 17, 11:00 a.m.
NIGHTWORK
IDYLWYLD DR N SB MEDIAN LANE CLOSED FROM 71ST ST W TO MARQUIS DR W
(Road resurfacing)
Start: September 16, 7:00 p.m. End: September 17, 6:00 a.m.
IDYLWYLD DR N SB CURB LANE & RIGHT TURN LANE CLOSED AT MARQUIS DR W
(Road resurfacing)
Start: September 17, 7:00 p.m. End: September 18, 6:00 a.m.
IDYLWYLD DR N SB MEDIAN LANE & LEFT TURN LANES CLOSED FROM 71ST ST W TO MARQUIS DR W
(Road resurfacing)
Start: September 15, 7:00 p.m. End: September 16, 6:00 a.m.
ONGOING
DUNDONALD AVE ROAD CLOSED FROM MOUNTBATTEN ST TO DIEPPE ST
(Catch basin & manhole installations)
Start: September 5, 8:00 a.m. End: September 20, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault Repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Construction around Saskatoon progressing as planned and on schedule
September 15, 2023 - 11:00am
- Construction on the westbound side of the Circle Drive North bridge wrapped up in July and crews continue to work on the eastbound side. The bridge rehabilitation began in February and is expected to fully reopen in October. Work on the 40-year-old bridge includes new asphalt and barriers, improvements to drainage and concrete, and repairs to the piers and abutments.
- Several road resurfacing projects on some of the city’s busiest roads are complete, including Circle Drive North (westbound lanes) between Alberta Avenue and Millar Avenue. Sections of Preston Avenue between 8th Street and Preston Crossing and Wanuskewin Road from 71st Street to Penner Road have also been resurfaced.
- Water main replacement projects continue throughout various parts of the city, including Downtown and in sections of River Heights, 33rd Street West, and Varsity View. Road and sidewalk upgrades in the Saskatoon Transit Downtown Terminal are complete.
Road construction in Saskatoon is moving along on schedule and on budget this summer. The City of Saskatoon earmarked $67.17 million for 2023 road and bridge maintenance and construction.
“The weather this summer has been good for construction and over the past several years, we’ve improved and coordinated road and sidewalk work to happen at the same time as water main replacements,” says Terry Schmidt, General Manager of Transportation and Construction. “All of this results in efficiency and cost savings while reducing prolonged impacts to residents.”
The City has been busy with electrical infrastructure upgrades as well. Saskatoon Light and Power has finished improvements to the underground electrical vault Downtown on 2nd Avenue between 21st Street and 22nd Street. Over the next few months, electricians will work on recommissioning the vault, but no additional road or sidewalk disruptions are expected.
More information about major construction projects can be found at saskatoon.ca/construction. The page includes links to the Road Restrictions and Construction Projects Map as well as how to sign up to receive the Daily Road Report.
We thank residents for their pave-tience during construction. We know it can be a real ‘pain in the asphalt.’
Marquis Drive road restrictions at Idylwyld Drive starting Saturday night
September 15, 2023 - 9:45am
Marquis Drive will have overnight road restrictions at Idylwyld Drive starting Saturday night, September 15 at 7:00 p.m. for road resurfacing. Marquis Drive will reopen daily at 7:00 a.m. Idylwyld Drive northbound and southbound will remain open throughout this project. Detours will be in place guiding motorists around the work zone. This project is expected to take two nights to complete, weather permitting and barring any unforeseen circumstances.
Saturday, September 16:
Marquis Drive intersection will be closed at Idylwyld Drive. This will restrict access to northbound and southbound lanes on Idylwyld Drive.
Sunday, September 17:
Idylwyld Drive northbound curb lanes will be closed at Marquis Drive. There will be no access from the east side of Marquis Drive to Idylwyld Drive during this closure.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
McKercher Drive northbound offramp to College Drive closed on Sunday
September 15, 2023 - 8:00am
McKercher Drive northbound offramp to College Drive eastbound will be closed on Sunday, September 17, starting at 6:00 a.m. for streetlight pole replacement work. Detours will be in place guiding motorists around the work zone. This project is expected to take six hours to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Lorne Avenue closed between Taylor and 1st streets on Saturday
September 15, 2023 - 7:00am
Lorne Avenue will be closed between Taylor and 1st streets on Saturday, September 16, starting at 8:00 a.m. for valve repairs. Detours will be in place guiding motorists around the work zone. This project is expected to take one day to complete, weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
33rd Street closed between avenues F and C on Saturday
September 15, 2023 - 6:00am
33rd Street will be closed between avenues F and C on Saturday, September 16, starting at 5:00 a.m. for the 33rd Street Fair. Roadways are expected to reopen by 8:00 p.m., weather permitting and barring any unforeseen circumstances.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Daily Road Report - September 15, 2023
September 14, 2023 - 3:00pm
*This report includes road restrictions on Priority 1 (high traffic, high speed) streets only.
NEW
3RD AVE N ROAD CLOSED FROM 26TH ST E TO QUEEN ST
(Roadway patching)
Start: September 15, 7:00 a.m. End: September 15, 3:00 p.m.
MCORMOND DR NB CURB LANE CLOSED AT BALTZAN BLVD
(Construction)
Start: September 15, 7:00 a.m. End: September 15, 5:00 p.m.
NIGHTWORK
IDYLWYLD DR N SB MEDIAN LANE & LEFT TURN LANES CLOSED FROM 71ST ST W TO MARQUIS DR W
(Roadway paving)
Start: September 15, 7:00 p.m. End: September 16, 6:00 a.m.
IDYLWYLD DR N SB MEDIAN LANE CLOSED FROM 71ST ST W TO WAKOOMA ST
(Road resurfacing)
Start: September 14, 7:00 p.m. End: September 15, 6:00 a.m.
ONGOING
22ND ST E FULL CLOSURE FROM 4TH AVE N TO 5TH AVE N
(Anode Work)
Start: September 11, 7:00 a.m. End: September 15, 5:00 p.m.
4TH AVE N NB CURB LANE CLOSED FROM 23RD ST E TO 24TH ST E
(Sidewalk construction)
Start: September 11, 7:00 a.m. End: September 15, 5:00 p.m.
DUNDONALD AVE ROAD CLOSED FROM MOUNTBATTEN ST TO DIEPPE ST
(Catch basin & manhole installations)
Start: September 5, 8:00 a.m. End: September 20, 5:00 p.m.
BALTZAN BLVD ROAD CLOSED FROM HORNER CRES TO ORBAN WAY
(Service connections)
Start: September 11, 7:00 a.m. End: September 22, 4:30 p.m.
CLARENCE AVE N NB CURB LANE CLOSED FROM AIRD ST TO OSLER ST
(Contractor work)
Start: July 21, 7:00 a.m. End: September 29, 6:00 p.m.
MELVILLE ST INTERSECTION CLOSED AT JASPER AVE
(Infrastructure upgrades)
Start: August 8, 7:00 a.m. End: October 7, 5:00 p.m.
BROADWAY AVE ROAD CLOSED FROM 5TH ST E TO 8TH ST E
(Water main work)
Start: September 11, 7:00 a.m. End: October 15, 4:30 p.m.
CIRCLE DR E EB LANES CLOSED FROM WARMAN RD TO PRESTON AVE N
(Bridge rehabilitation)
Two-way traffic will be maintained in the WB lanes.
Start: June 25, 5:00 a.m. End: November 1, 5:00 p.m.
NEAULT RD ROAD CLOSED FROM 22ND ST W TO WHELAN RD
(Construction)
Start: July 24, 7:00 a.m. End: November 3, 4:00 p.m.
22ND ST E EB CURB & CENTER LANE CLOSED FROM AUDITORIUM AVE TO 1ST AVE S
(Vault repairs)
Start: September 11, 7:00 a.m. End: November 30, 4:00 p.m.
All restrictions will be lifted as indicated, weather permitting and barring any unforeseen circumstances.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.
Keeping Saskatoon’s urban forest beautiful: Fall watering tips for healthy trees
September 14, 2023 - 1:00pm
-
Adequate water is critical for the establishment of new trees and beneficial to the health of established trees.
-
The amount of water that a tree requires depends on the type of soil, the age of the tree, the species of tree, plant site characteristics and the amount of rainfall.
-
Simply watering the grass or turf around a tree does not supply enough moisture for the tree’s root system.
-
The best method is to let a hose flow slowly, about 15cm (6”) away from the tree trunk, until the area is moist to a depth of 6-9 inches.
-
It is important to soak the area outside of the root zone to encourage the roots to grow out in a radial – or circular – pattern.
-
In late autumn, before the ground freezes and after the trees drop their leaves, give them a deep watering and ensure that the water reaches their roots. This will make your trees and shrubs strong enough to handle winter storms and high winds.
Trees help to make our communities beautiful and improve our quality of life by helping to regulate our climate, reduce air pollution, protect our soil and water resources, and provide habitat for wildlife. Protecting and conserving urban forests through proper management is vital to sustaining healthy communities. Saskatoon is well-known for its oasis of trees. Residents and visitors enjoy the benefits and quality of life they provide.
Unfortunately, urban trees are often faced with difficult environmental conditions and tree care is not only about pruning and trimming the trees, but it also includes watering them. When it comes to fall tree care, it is not a matter of whether you should water the trees in and around your property in autumn but knowing the right time and quantity. The City has some great seasonal tips to help residents keep trees healthy and ready for the spring.
Watering tips
Does snowmelt offer enough moisture?
The problem with snowmelt is that snow sits atop frozen ground. Even if we get a mild day or two mid-winter, the tree’s roots cannot access the water. Watering deeply before the ground freezes gives roots access to it on milder days and in early spring before the ground thaws. Ensuring the soil is moist at least 1-2 feet down encourages proper root growth.
For more information on how to keep trees healthy visit saskatoon.ca/treecare